{"data":[{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:power.it_mw:epoch-ai-data-centers:2026-08-01","date":"2026-08-01","kind":"value","field":"power.it_mw","before":77,"after":108,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 77 MW → 108 MW","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:power.facility_mw:epoch-ai-data-centers:2026-08-01","date":"2026-08-01","kind":"value","field":"power.facility_mw","before":102,"after":139,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 102 MW → 139 MW","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:size.buildings_operational:epoch-ai-data-centers:2026-08-01","date":"2026-08-01","kind":"value","field":"size.buildings_operational","before":2,"after":3,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 3","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:phase_operational:2026-08-01:epoch-ai-data-centers","date":"2026-08-01","kind":"milestone","milestone":"phase_operational","description":"Building 3 expected to come online sometime around August 2026, since in the May satellite image it appeared structurally complete with minimal construction surrounding it. Basing MW estimate using Building 2 as a reference.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 3 expected to come online sometime around August 2026, since in the May satellite image it appeared structurally complete with minimal construction surrounding it. Basing MW estimate using Building 2 as a ref…","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-microsoft-nebius-new-jersey","slug":"microsoft-nebius-new-jersey-cumberland-county-nj","name":"Microsoft-Nebius New Jersey","state":"NJ","orgIds":["nebius","microsoft","city-of-vineland-nj"],"iso":"PJM","utilities":["city-of-vineland-nj"],"id":"epoch-microsoft-nebius-new-jersey:status:epoch-ai-data-centers:2026-07-12","date":"2026-07-12","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/microsoft-nebius-new-jersey-cumberland-county-nj","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-arcola","slug":"google-arcola-sterling-va","name":"Google Arcola","state":"VA","orgIds":["google","wheeler-survey-company-llc","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-arcola:size.buildings_operational:epoch-ai-data-centers:2026-06-16","date":"2026-06-16","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/google-arcola-sterling-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-arcola","slug":"google-arcola-sterling-va","name":"Google Arcola","state":"VA","orgIds":["google","wheeler-survey-company-llc","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-arcola:status:epoch-ai-data-centers:2026-06-16","date":"2026-06-16","kind":"value","field":"status","before":"under_construction","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating","url":"https://datacenters.prithvidixit.com/facilities/google-arcola-sterling-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-arcola","slug":"google-arcola-sterling-va","name":"Google Arcola","state":"VA","orgIds":["google","wheeler-survey-company-llc","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-arcola:phase_operational:2026-06-16:epoch-ai-data-centers","date":"2026-06-16","kind":"milestone","milestone":"phase_operational","description":"Building 1 is operational, based off of colored motion artifacts from cooling towers and direct visual verification.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is operational, based off of colored motion artifacts from cooling towers and direct visual verification.","url":"https://datacenters.prithvidixit.com/facilities/google-arcola-sterling-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:land_acquired:2026-05-28:county-licking-oh","date":"2026-05-28","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 095-112218-00.000 (no sale price disclosed).","sourceId":"county-licking-oh","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 095-112218-00.000 (no sale price disclosed).","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"county-licking-oh","title":"Auditor Parcels","publisher":"Licking County, OH — Auditor","url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0","license":"Public record","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-coreweave-chester-va","slug":"coreweave-chester-va-chesterfield-county-va","name":"CoreWeave Chester VA","state":"VA","orgIds":["coreweave","openai","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-coreweave-chester-va:power.it_mw:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"power.it_mw","before":27,"after":82,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 27 MW → 82 MW","url":"https://datacenters.prithvidixit.com/facilities/coreweave-chester-va-chesterfield-county-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-coreweave-chester-va","slug":"coreweave-chester-va-chesterfield-county-va","name":"CoreWeave Chester VA","state":"VA","orgIds":["coreweave","openai","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-coreweave-chester-va:power.facility_mw:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"power.facility_mw","before":38,"after":114,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 38 MW → 114 MW","url":"https://datacenters.prithvidixit.com/facilities/coreweave-chester-va-chesterfield-county-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-coreweave-chester-va","slug":"coreweave-chester-va-chesterfield-county-va","name":"CoreWeave Chester VA","state":"VA","orgIds":["coreweave","openai","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-coreweave-chester-va:size.buildings_operational:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/coreweave-chester-va-chesterfield-county-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-coreweave-chester-va","slug":"coreweave-chester-va-chesterfield-county-va","name":"CoreWeave Chester VA","state":"VA","orgIds":["coreweave","openai","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-coreweave-chester-va:phase_operational:2026-05-20:epoch-ai-data-centers","date":"2026-05-20","kind":"milestone","milestone":"phase_operational","description":"Based on satellite imagery, Building 3 has cleared its land and is beginning construction. Building 2 is operational judging from the colored motion artifacts on the cooling tower fans.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Based on satellite imagery, Building 3 has cleared its land and is beginning construction. Building 2 is operational judging from the colored motion artifacts on the cooling tower fans.","url":"https://datacenters.prithvidixit.com/facilities/coreweave-chester-va-chesterfield-county-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-bristow","slug":"google-bristow-bristow-va","name":"Google Bristow","state":"VA","orgIds":["google","google-deepmind","nova-mango-farms-llc-c-o-corporation-service-company","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-bristow:power.it_mw:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"power.it_mw","before":174,"after":238,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 174 MW → 238 MW","url":"https://datacenters.prithvidixit.com/facilities/google-bristow-bristow-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-bristow","slug":"google-bristow-bristow-va","name":"Google Bristow","state":"VA","orgIds":["google","google-deepmind","nova-mango-farms-llc-c-o-corporation-service-company","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-bristow:power.facility_mw:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"power.facility_mw","before":208,"after":286,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 208 MW → 286 MW","url":"https://datacenters.prithvidixit.com/facilities/google-bristow-bristow-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-bristow","slug":"google-bristow-bristow-va","name":"Google Bristow","state":"VA","orgIds":["google","google-deepmind","nova-mango-farms-llc-c-o-corporation-service-company","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-bristow:size.buildings_operational:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"size.buildings_operational","before":2,"after":3,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 3","url":"https://datacenters.prithvidixit.com/facilities/google-bristow-bristow-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-bristow","slug":"google-bristow-bristow-va","name":"Google Bristow","state":"VA","orgIds":["google","google-deepmind","nova-mango-farms-llc-c-o-corporation-service-company","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-bristow:status:epoch-ai-data-centers:2026-05-20","date":"2026-05-20","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/google-bristow-bristow-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-bristow","slug":"google-bristow-bristow-va","name":"Google Bristow","state":"VA","orgIds":["google","google-deepmind","nova-mango-farms-llc-c-o-corporation-service-company","dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-google-bristow:phase_operational:2026-05-20:epoch-ai-data-centers","date":"2026-05-20","kind":"milestone","milestone":"phase_operational","description":"Building 3 is operational, based off of colored motion artifacts from cooling towers.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 3 is operational, based off of colored motion artifacts from cooling towers.","url":"https://datacenters.prithvidixit.com/facilities/google-bristow-bristow-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-new-albany","slug":"google-new-albany-new-albany-oh","name":"Google New Albany","state":"OH","orgIds":["google","google-deepmind","montauk-innovations-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-new-albany:status:epoch-ai-data-centers:2026-05-18","date":"2026-05-18","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/google-new-albany-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.it_mw:epoch-ai-data-centers:2026-05-18","date":"2026-05-18","kind":"value","field":"power.it_mw","before":368,"after":496,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 368 MW → 496 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.facility_mw:epoch-ai-data-centers:2026-05-18","date":"2026-05-18","kind":"value","field":"power.facility_mw","before":478,"after":645,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 478 MW → 645 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:size.buildings_operational:epoch-ai-data-centers:2026-05-18","date":"2026-05-18","kind":"value","field":"size.buildings_operational","before":6,"after":11,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 6 → 11","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:phase_operational:2026-05-18:epoch-ai-data-centers","date":"2026-05-18","kind":"milestone","milestone":"phase_operational","description":"Building 7-11 (Meta tents) are operational. In January we saw them look almost complete, with some work still ongoing for power equipment. Assuming 3 more months for commissioning, we expect operation by May. Northern tents numbered 16-27 are all roofed except for 21 and 27.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 7-11 (Meta tents) are operational. In January we saw them look almost complete, with some work still ongoing for power equipment. Assuming 3 more months for commissioning, we expect operation by May. Northern…","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:power.it_mw:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"power.it_mw","before":144,"after":180,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 144 MW → 180 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:power.facility_mw:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"power.facility_mw","before":202,"after":252,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 202 MW → 252 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:size.buildings_operational:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"size.buildings_operational","before":4,"after":5,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 4 → 5","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:status:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:phase_operational:2026-05-14:epoch-ai-data-centers","date":"2026-05-14","kind":"milestone","milestone":"phase_operational","description":"Building 5 is estimated to be operational, based on the previous entry.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 5 is estimated to be operational, based on the previous entry.","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-3","slug":"qts-richmond-3-sandston-va","name":"QTS Richmond 3","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-3:power.it_mw:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"power.it_mw","before":48,"after":144,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 48 MW → 144 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-3-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-3","slug":"qts-richmond-3-sandston-va","name":"QTS Richmond 3","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-3:power.facility_mw:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"power.facility_mw","before":67,"after":202,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 67 MW → 202 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-3-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-3","slug":"qts-richmond-3-sandston-va","name":"QTS Richmond 3","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-3:size.buildings_operational:epoch-ai-data-centers:2026-05-14","date":"2026-05-14","kind":"value","field":"size.buildings_operational","before":1,"after":3,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 3","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-3-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-3","slug":"qts-richmond-3-sandston-va","name":"QTS Richmond 3","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-3:phase_operational:2026-05-14:epoch-ai-data-centers","date":"2026-05-14","kind":"milestone","milestone":"phase_operational","description":"Building 2 and 3 are operational, based on the previous entry.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 2 and 3 are operational, based on the previous entry.","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-3-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-columbus","slug":"google-columbus-columbus-oh","name":"Google Columbus","state":"OH","orgIds":["google","google-deepmind","magellan-enterprises-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-columbus:power.it_mw:epoch-ai-data-centers:2026-05-01","date":"2026-05-01","kind":"value","field":"power.it_mw","before":216,"after":303,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 216 MW → 303 MW","url":"https://datacenters.prithvidixit.com/facilities/google-columbus-columbus-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-columbus","slug":"google-columbus-columbus-oh","name":"Google Columbus","state":"OH","orgIds":["google","google-deepmind","magellan-enterprises-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-columbus:power.facility_mw:epoch-ai-data-centers:2026-05-01","date":"2026-05-01","kind":"value","field":"power.facility_mw","before":260,"after":364,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 260 MW → 364 MW","url":"https://datacenters.prithvidixit.com/facilities/google-columbus-columbus-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-columbus","slug":"google-columbus-columbus-oh","name":"Google Columbus","state":"OH","orgIds":["google","google-deepmind","magellan-enterprises-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-columbus:size.buildings_operational:epoch-ai-data-centers:2026-05-01","date":"2026-05-01","kind":"value","field":"size.buildings_operational","before":3,"after":4,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 3 → 4","url":"https://datacenters.prithvidixit.com/facilities/google-columbus-columbus-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-columbus","slug":"google-columbus-columbus-oh","name":"Google Columbus","state":"OH","orgIds":["google","google-deepmind","magellan-enterprises-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-columbus:phase_operational:2026-05-01:epoch-ai-data-centers","date":"2026-05-01","kind":"milestone","milestone":"phase_operational","description":"Building 4 operational. No more visible construction, and since only 3 fans needed to be installed since Feburary, operational date was likely soon after. Building 5 roof almost complete.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 4 operational. No more visible construction, and since only 3 fans needed to be installed since Feburary, operational date was likely soon after. Building 5 roof almost complete.","url":"https://datacenters.prithvidixit.com/facilities/google-columbus-columbus-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-microsoft-nebius-new-jersey","slug":"microsoft-nebius-new-jersey-cumberland-county-nj","name":"Microsoft-Nebius New Jersey","state":"NJ","orgIds":["nebius","microsoft","city-of-vineland-nj"],"iso":"PJM","utilities":["city-of-vineland-nj"],"id":"epoch-microsoft-nebius-new-jersey:size.buildings_operational:epoch-ai-data-centers:2026-04-15","date":"2026-04-15","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/microsoft-nebius-new-jersey-cumberland-county-nj","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-microsoft-nebius-new-jersey","slug":"microsoft-nebius-new-jersey-cumberland-county-nj","name":"Microsoft-Nebius New Jersey","state":"NJ","orgIds":["nebius","microsoft","city-of-vineland-nj"],"iso":"PJM","utilities":["city-of-vineland-nj"],"id":"epoch-microsoft-nebius-new-jersey:status:epoch-ai-data-centers:2026-04-15","date":"2026-04-15","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/microsoft-nebius-new-jersey-cumberland-county-nj","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-microsoft-nebius-new-jersey","slug":"microsoft-nebius-new-jersey-cumberland-county-nj","name":"Microsoft-Nebius New Jersey","state":"NJ","orgIds":["nebius","microsoft","city-of-vineland-nj"],"iso":"PJM","utilities":["city-of-vineland-nj"],"id":"epoch-microsoft-nebius-new-jersey:phase_operational:2026-04-15:epoch-ai-data-centers","date":"2026-04-15","kind":"milestone","milestone":"phase_operational","description":"High-resolution satellite imagery shows the air-cooled chiller array has grown to roughly 30 units, enough to support the first phase. We estimate Building 1 became operational around early 2026 with about 50 MW of IT capacity (70 MW total facility power at a 1.4 PUE), based on DataOne's disclosure of a first 50 MW phase. SemiAnalysis estimated the full 50 MW was reached around January to February 2026 ([SemiAnalysis](https://newsletter.semianalysis.com/p/stop-saying-half-of-2026-us-datacenter)); this April image is our first high-resolution confirmation that the cooling is in place.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: High-resolution satellite imagery shows the air-cooled chiller array has grown to roughly 30 units, enough to support the first phase. We estimate Building 1 became operational around early 2026 with about 50 MW of IT…","url":"https://datacenters.prithvidixit.com/facilities/microsoft-nebius-new-jersey-cumberland-county-nj","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-anthropic-amazon-new-carlisle","slug":"anthropic-amazon-new-carlisle-new-carlisle-in","name":"Anthropic-Amazon New Carlisle","state":"IN","orgIds":["amazon","anthropic","indiana-michigan-power"],"iso":"PJM","utilities":["indiana-michigan-power"],"id":"epoch-anthropic-amazon-new-carlisle:power.it_mw:epoch-ai-data-centers:2026-03-23","date":"2026-03-23","kind":"value","field":"power.it_mw","before":626,"after":910,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 626 MW → 910 MW","url":"https://datacenters.prithvidixit.com/facilities/anthropic-amazon-new-carlisle-new-carlisle-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-anthropic-amazon-new-carlisle","slug":"anthropic-amazon-new-carlisle-new-carlisle-in","name":"Anthropic-Amazon New Carlisle","state":"IN","orgIds":["amazon","anthropic","indiana-michigan-power"],"iso":"PJM","utilities":["indiana-michigan-power"],"id":"epoch-anthropic-amazon-new-carlisle:power.facility_mw:epoch-ai-data-centers:2026-03-23","date":"2026-03-23","kind":"value","field":"power.facility_mw","before":751,"after":1092,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 751 MW → 1.09 GW","url":"https://datacenters.prithvidixit.com/facilities/anthropic-amazon-new-carlisle-new-carlisle-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-anthropic-amazon-new-carlisle","slug":"anthropic-amazon-new-carlisle-new-carlisle-in","name":"Anthropic-Amazon New Carlisle","state":"IN","orgIds":["amazon","anthropic","indiana-michigan-power"],"iso":"PJM","utilities":["indiana-michigan-power"],"id":"epoch-anthropic-amazon-new-carlisle:size.buildings_operational:epoch-ai-data-centers:2026-03-23","date":"2026-03-23","kind":"value","field":"size.buildings_operational","before":11,"after":16,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 11 → 16","url":"https://datacenters.prithvidixit.com/facilities/anthropic-amazon-new-carlisle-new-carlisle-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-anthropic-amazon-new-carlisle","slug":"anthropic-amazon-new-carlisle-new-carlisle-in","name":"Anthropic-Amazon New Carlisle","state":"IN","orgIds":["amazon","anthropic","indiana-michigan-power"],"iso":"PJM","utilities":["indiana-michigan-power"],"id":"epoch-anthropic-amazon-new-carlisle:phase_operational:2026-03-23:epoch-ai-data-centers","date":"2026-03-23","kind":"milestone","milestone":"phase_operational","description":"Buildings 12-16 are operational. Based on how long previous buildings took, when they were in a similar state to Buildings 12-16 in December.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 12-16 are operational. Based on how long previous buildings took, when they were in a similar state to Buildings 12-16 in December.","url":"https://datacenters.prithvidixit.com/facilities/anthropic-amazon-new-carlisle-new-carlisle-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"osm-way-1426663253","slug":"amazon-iad-500-herndon-va","name":"Amazon IAD-500","state":"VA","orgIds":["amazon","dominion"],"iso":"PJM","utilities":["dominion"],"id":"osm-way-1426663253:land_acquired:2026-03-17:county-fairfax-va","date":"2026-03-17","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 0242 14  0001 (no sale price disclosed).","sourceId":"county-fairfax-va","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 0242 14 0001 (no sale price disclosed).","url":"https://datacenters.prithvidixit.com/facilities/amazon-iad-500-herndon-va","source":{"id":"county-fairfax-va","title":"ParcelPLUS Assessed Values","publisher":"Fairfax County, VA — Department of Tax Administration","url":"https://www.fairfaxcounty.gov/mercator/rest/services/GIS/ParcelPlusAssessedValues/MapServer/0","license":"Public record","retrievedAt":"2026-09-27"}},{"facilityId":"osm-way-1521913706","slug":"unnamed-data-center-redskin-drive-herndon-va","name":"Unnamed data center — Redskin Drive","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"osm-way-1521913706:land_acquired:2026-03-17:county-fairfax-va","date":"2026-03-17","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 0242 14  0002 (no sale price disclosed).","sourceId":"county-fairfax-va","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 0242 14 0002 (no sale price disclosed).","url":"https://datacenters.prithvidixit.com/facilities/unnamed-data-center-redskin-drive-herndon-va","source":{"id":"county-fairfax-va","title":"ParcelPLUS Assessed Values","publisher":"Fairfax County, VA — Department of Tax Administration","url":"https://www.fairfaxcounty.gov/mercator/rest/services/GIS/ParcelPlusAssessedValues/MapServer/0","license":"Public record","retrievedAt":"2026-09-27"}},{"facilityId":"osm-way-1521913707","slug":"unnamed-data-center-redskin-drive-herndon-va-2","name":"Unnamed data center — Redskin Drive","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"osm-way-1521913707:land_acquired:2026-03-17:county-fairfax-va","date":"2026-03-17","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 0242 14  0003 (no sale price disclosed).","sourceId":"county-fairfax-va","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 0242 14 0003 (no sale price disclosed).","url":"https://datacenters.prithvidixit.com/facilities/unnamed-data-center-redskin-drive-herndon-va-2","source":{"id":"county-fairfax-va","title":"ParcelPLUS Assessed Values","publisher":"Fairfax County, VA — Department of Tax Administration","url":"https://www.fairfaxcounty.gov/mercator/rest/services/GIS/ParcelPlusAssessedValues/MapServer/0","license":"Public record","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-aws-new-albany","slug":"aws-new-albany-licking-county-oh","name":"AWS New Albany","state":"OH","orgIds":["amazon","civf-vii-oh1m01-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-aws-new-albany:power.it_mw:epoch-ai-data-centers:2026-03-12","date":"2026-03-12","kind":"value","field":"power.it_mw","before":113,"after":213,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 113 MW → 213 MW","url":"https://datacenters.prithvidixit.com/facilities/aws-new-albany-licking-county-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-aws-new-albany","slug":"aws-new-albany-licking-county-oh","name":"AWS New Albany","state":"OH","orgIds":["amazon","civf-vii-oh1m01-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-aws-new-albany:power.facility_mw:epoch-ai-data-centers:2026-03-12","date":"2026-03-12","kind":"value","field":"power.facility_mw","before":136,"after":255,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 136 MW → 255 MW","url":"https://datacenters.prithvidixit.com/facilities/aws-new-albany-licking-county-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-aws-new-albany","slug":"aws-new-albany-licking-county-oh","name":"AWS New Albany","state":"OH","orgIds":["amazon","civf-vii-oh1m01-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-aws-new-albany:size.buildings_operational:epoch-ai-data-centers:2026-03-12","date":"2026-03-12","kind":"value","field":"size.buildings_operational","before":5,"after":9,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 5 → 9","url":"https://datacenters.prithvidixit.com/facilities/aws-new-albany-licking-county-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-aws-new-albany","slug":"aws-new-albany-licking-county-oh","name":"AWS New Albany","state":"OH","orgIds":["amazon","civf-vii-oh1m01-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-aws-new-albany:phase_operational:2026-03-12:epoch-ai-data-centers","date":"2026-03-12","kind":"milestone","milestone":"phase_operational","description":"Middle campus Buildings 10, 12, 13, and 14 appear complete/likely operational. Building 11 is still installing backup generators, so it is not counted as operational. Based on satellite imagery, northern campus Buildings 1-3 appear in late construction, with all roofs complete but nearby generator/cooling equipment still being installed for buildings 2-3. Building 4 is still early in construction. Eastern campus Buildings 5-9 appear complete and operational as expected. Note that we're only including roughly 44% of all the New Albany campuses IT Power as being dedicated to leading AI chips, based on all the types of compute instances [listed](https://docs.aws.amazon.com/ec2/latest/instancetypes/ec2-instance-regions.html).","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Middle campus Buildings 10, 12, 13, and 14 appear complete/likely operational. Building 11 is still installing backup generators, so it is not counted as operational. Based on satellite imagery, northern campus Buildi…","url":"https://datacenters.prithvidixit.com/facilities/aws-new-albany-licking-county-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-lancaster","slug":"google-lancaster-lancaster-oh","name":"Google Lancaster","state":"OH","orgIds":["google","south-central-power-company"],"iso":"PJM","utilities":["south-central-power-company"],"id":"epoch-google-lancaster:status:epoch-ai-data-centers:2026-03-12","date":"2026-03-12","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/google-lancaster-lancaster-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-aws-new-albany","slug":"aws-new-albany-licking-county-oh","name":"AWS New Albany","state":"OH","orgIds":["amazon","civf-vii-oh1m01-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-aws-new-albany:land_acquired:2026-03-09:county-licking-oh","date":"2026-03-09","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 095-111408-00.000 (no sale price disclosed).","sourceId":"county-licking-oh","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 095-111408-00.000 (no sale price disclosed).","url":"https://datacenters.prithvidixit.com/facilities/aws-new-albany-licking-county-oh","source":{"id":"county-licking-oh","title":"Auditor Parcels","publisher":"Licking County, OH — Auditor","url":"https://gis.lickingcounty.gov/server/rest/services/Auditor/Parcels/FeatureServer/0","license":"Public record","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-1","slug":"qts-richmond-1-sandston-va","name":"QTS Richmond 1","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-1:status:epoch-ai-data-centers:2026-02-13","date":"2026-02-13","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-1-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-3","slug":"qts-richmond-3-sandston-va","name":"QTS Richmond 3","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-3:size.buildings_operational:epoch-ai-data-centers:2026-02-13","date":"2026-02-13","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-3-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-3","slug":"qts-richmond-3-sandston-va","name":"QTS Richmond 3","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-3:status:epoch-ai-data-centers:2026-02-13","date":"2026-02-13","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-3-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-3","slug":"qts-richmond-3-sandston-va","name":"QTS Richmond 3","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-3:phase_operational:2026-02-13:epoch-ai-data-centers","date":"2026-02-13","kind":"milestone","milestone":"phase_operational","description":"Building 1 is operational, based on the substation being completed earlier and cars in the carpark. Building 2 and 3 are not operational, based on minor construction work at the perimeter and no cars in the carpark, but we expect they will be operational within 3 months. Building 4 has complete chillers and backup generators, while Building 5 has chillers but only a few backup generators - roughly the state of Building 1 on 2025-02-04.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is operational, based on the substation being completed earlier and cars in the carpark. Building 2 and 3 are not operational, based on minor construction work at the perimeter and no cars in the carpark, b…","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-3-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.it_mw:epoch-ai-data-centers:2026-01-18","date":"2026-01-18","kind":"value","field":"power.it_mw","before":76,"after":368,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 76 MW → 368 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:power.facility_mw:epoch-ai-data-centers:2026-01-18","date":"2026-01-18","kind":"value","field":"power.facility_mw","before":99,"after":478,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 99 MW → 478 MW","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:size.buildings_operational:epoch-ai-data-centers:2026-01-18","date":"2026-01-18","kind":"value","field":"size.buildings_operational","before":1,"after":6,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 6","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:phase_operational:2026-01-18:epoch-ai-data-centers","date":"2026-01-18","kind":"milestone","milestone":"phase_operational","description":"Buildings 2-6 are operational, based on all equipment being in place, the paved ground, and minimal construction equipment by the buildings. Buildings 7-11 all have some kind of power or cooling equipment lining their right side which are not fully installed. Building 14 has chillers installed. Buildings 16-20 roofs are complete. The Socrates South power plant to the right of Buildings 7-11 has 7 gas turbines in place, judging by the exhaust stacks.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 2-6 are operational, based on all equipment being in place, the paved ground, and minimal construction equipment by the buildings. Buildings 7-11 all have some kind of power or cooling equipment lining their…","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:power.it_mw:epoch-ai-data-centers:2026-01-07","date":"2026-01-07","kind":"value","field":"power.it_mw","before":47,"after":77,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 47 MW → 77 MW","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:power.facility_mw:epoch-ai-data-centers:2026-01-07","date":"2026-01-07","kind":"value","field":"power.facility_mw","before":66,"after":102,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 66 MW → 102 MW","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:size.buildings_operational:epoch-ai-data-centers:2026-01-07","date":"2026-01-07","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:phase_operational:2026-01-07:epoch-ai-data-centers","date":"2026-01-07","kind":"milestone","milestone":"phase_operational","description":"Building 2 operational estimate. This is based on the progress visible in the September 2025 image. [The DEP](https://www.pacodeandbulletin.gov/secure/pabulletin/data/vol56/56-4/56-4.pdf) also issues an air plan approval to add 48 more emergency generators on this date.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 2 operational estimate. This is based on the progress visible in the September 2025 image. The DEP also issues an air plan approval to add 48 more emergency generators on this date.","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:power.it_mw:epoch-ai-data-centers:2025-12-31","date":"2025-12-31","kind":"value","field":"power.it_mw","before":72,"after":144,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 72 MW → 144 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:power.facility_mw:epoch-ai-data-centers:2025-12-31","date":"2025-12-31","kind":"value","field":"power.facility_mw","before":101,"after":202,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 101 MW → 202 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:size.buildings_operational:epoch-ai-data-centers:2025-12-31","date":"2025-12-31","kind":"value","field":"size.buildings_operational","before":2,"after":4,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 4","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-2","slug":"qts-richmond-2-sandston-va","name":"QTS Richmond 2","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-2:phase_operational:2025-12-31:epoch-ai-data-centers","date":"2025-12-31","kind":"milestone","milestone":"phase_operational","description":"Building 3 and 4 are operational, based on the substation being completed earlier, the buildings looking complete, and carparks being moderately full. Building 5 still has construction work.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 3 and 4 are operational, based on the substation being completed earlier, the buildings looking complete, and carparks being moderately full. Building 5 still has construction work.","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-2-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-anthropic-amazon-new-carlisle","slug":"anthropic-amazon-new-carlisle-new-carlisle-in","name":"Anthropic-Amazon New Carlisle","state":"IN","orgIds":["amazon","anthropic","indiana-michigan-power"],"iso":"PJM","utilities":["indiana-michigan-power"],"id":"epoch-anthropic-amazon-new-carlisle:power.it_mw:epoch-ai-data-centers:2025-12-23","date":"2025-12-23","kind":"value","field":"power.it_mw","before":398,"after":626,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 398 MW → 626 MW","url":"https://datacenters.prithvidixit.com/facilities/anthropic-amazon-new-carlisle-new-carlisle-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-anthropic-amazon-new-carlisle","slug":"anthropic-amazon-new-carlisle-new-carlisle-in","name":"Anthropic-Amazon New Carlisle","state":"IN","orgIds":["amazon","anthropic","indiana-michigan-power"],"iso":"PJM","utilities":["indiana-michigan-power"],"id":"epoch-anthropic-amazon-new-carlisle:power.facility_mw:epoch-ai-data-centers:2025-12-23","date":"2025-12-23","kind":"value","field":"power.facility_mw","before":478,"after":751,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 478 MW → 751 MW","url":"https://datacenters.prithvidixit.com/facilities/anthropic-amazon-new-carlisle-new-carlisle-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-anthropic-amazon-new-carlisle","slug":"anthropic-amazon-new-carlisle-new-carlisle-in","name":"Anthropic-Amazon New Carlisle","state":"IN","orgIds":["amazon","anthropic","indiana-michigan-power"],"iso":"PJM","utilities":["indiana-michigan-power"],"id":"epoch-anthropic-amazon-new-carlisle:size.buildings_operational:epoch-ai-data-centers:2025-12-23","date":"2025-12-23","kind":"value","field":"size.buildings_operational","before":7,"after":11,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 7 → 11","url":"https://datacenters.prithvidixit.com/facilities/anthropic-amazon-new-carlisle-new-carlisle-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-anthropic-amazon-new-carlisle","slug":"anthropic-amazon-new-carlisle-new-carlisle-in","name":"Anthropic-Amazon New Carlisle","state":"IN","orgIds":["amazon","anthropic","indiana-michigan-power"],"iso":"PJM","utilities":["indiana-michigan-power"],"id":"epoch-anthropic-amazon-new-carlisle:phase_operational:2025-12-23:epoch-ai-data-centers","date":"2025-12-23","kind":"milestone","milestone":"phase_operational","description":"Buildings 8-11 are operational, given it's been over 7 months since their roofs were complete, and the backup generators and roof chimneys look complete. The roof is almost complete for Building 17 and 18.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 8-11 are operational, given it's been over 7 months since their roofs were complete, and the backup generators and roof chimneys look complete. The roof is almost complete for Building 17 and 18.","url":"https://datacenters.prithvidixit.com/facilities/anthropic-amazon-new-carlisle-new-carlisle-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"osm-way-723117951","slug":"stack-new-albany-franklin-county-oh","name":"STACK New Albany","state":"OH","orgIds":["si-nal01a-abs-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"osm-way-723117951:land_acquired:2025-12-02:county-franklin-oh","date":"2025-12-02","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 222-004355 (no sale price disclosed).","sourceId":"county-franklin-oh","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 222-004355 (no sale price disclosed).","url":"https://datacenters.prithvidixit.com/facilities/stack-new-albany-franklin-county-oh","source":{"id":"county-franklin-oh","title":"Central Ohio Parcels (Franklin County Auditor data)","publisher":"City of Columbus GIS / Franklin County Auditor","url":"https://maps.columbus.gov/arcgis/rest/services/CityServices/KeyLayers/MapServer/3","license":"Public record","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-1","slug":"qts-richmond-1-sandston-va","name":"QTS Richmond 1","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-1:power.it_mw:epoch-ai-data-centers:2025-11-19","date":"2025-11-19","kind":"value","field":"power.it_mw","before":190,"after":238,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 190 MW → 238 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-1-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-1","slug":"qts-richmond-1-sandston-va","name":"QTS Richmond 1","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-1:power.facility_mw:epoch-ai-data-centers:2025-11-19","date":"2025-11-19","kind":"value","field":"power.facility_mw","before":266,"after":333,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 266 MW → 333 MW","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-1-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-1","slug":"qts-richmond-1-sandston-va","name":"QTS Richmond 1","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-1:size.buildings_operational:epoch-ai-data-centers:2025-11-19","date":"2025-11-19","kind":"value","field":"size.buildings_operational","before":4,"after":5,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 4 → 5","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-1-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-qts-richmond-1","slug":"qts-richmond-1-sandston-va","name":"QTS Richmond 1","state":"VA","orgIds":["dominion"],"iso":"PJM","utilities":["dominion"],"id":"epoch-qts-richmond-1:phase_operational:2025-11-19:epoch-ai-data-centers","date":"2025-11-19","kind":"milestone","milestone":"phase_operational","description":"Building 5 is operational, based on a complete building and full carpark in a [Google Earth image](https://earth.google.com/web/@37.48747566,-77.2485616,47.03705985a,2549.72172121d,30.00094375y,3.66969189h,0t,0r/data=ChYqEAgBEgoyMDI1LTExLTE5GAFCAggBMikKJwolCiExWVNYSWZQZkcydXVMYm1nUDkyc2NObE1QenF1VGRVV2cgAToDCgEwQgIIAEoICMOJgf0CEAE). Construction equipment around Building 1 and 2 has cleared up again.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 5 is operational, based on a complete building and full carpark in a Google Earth image. Construction equipment around Building 1 and 2 has cleared up again.","url":"https://datacenters.prithvidixit.com/facilities/qts-richmond-1-sandston-va","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-lancaster","slug":"google-lancaster-lancaster-oh","name":"Google Lancaster","state":"OH","orgIds":["google","south-central-power-company"],"iso":"PJM","utilities":["south-central-power-company"],"id":"epoch-google-lancaster:power.it_mw:epoch-ai-data-centers:2025-10-31","date":"2025-10-31","kind":"value","field":"power.it_mw","before":68,"after":137,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 68 MW → 137 MW","url":"https://datacenters.prithvidixit.com/facilities/google-lancaster-lancaster-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-lancaster","slug":"google-lancaster-lancaster-oh","name":"Google Lancaster","state":"OH","orgIds":["google","south-central-power-company"],"iso":"PJM","utilities":["south-central-power-company"],"id":"epoch-google-lancaster:power.facility_mw:epoch-ai-data-centers:2025-10-31","date":"2025-10-31","kind":"value","field":"power.facility_mw","before":82,"after":164,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 82 MW → 164 MW","url":"https://datacenters.prithvidixit.com/facilities/google-lancaster-lancaster-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-lancaster","slug":"google-lancaster-lancaster-oh","name":"Google Lancaster","state":"OH","orgIds":["google","south-central-power-company"],"iso":"PJM","utilities":["south-central-power-company"],"id":"epoch-google-lancaster:size.buildings_operational:epoch-ai-data-centers:2025-10-31","date":"2025-10-31","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/google-lancaster-lancaster-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-lancaster","slug":"google-lancaster-lancaster-oh","name":"Google Lancaster","state":"OH","orgIds":["google","south-central-power-company"],"iso":"PJM","utilities":["south-central-power-company"],"id":"epoch-google-lancaster:phase_operational:2025-10-31:epoch-ai-data-centers","date":"2025-10-31","kind":"milestone","milestone":"phase_operational","description":"Building 2 operational. This is supported by the state of Building 2 a month prior, which is entirely complete outside of some equipment that was removed later on.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 2 operational. This is supported by the state of Building 2 a month prior, which is entirely complete outside of some equipment that was removed later on.","url":"https://datacenters.prithvidixit.com/facilities/google-lancaster-lancaster-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-new-albany","slug":"google-new-albany-new-albany-oh","name":"Google New Albany","state":"OH","orgIds":["google","google-deepmind","montauk-innovations-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-new-albany:power.it_mw:epoch-ai-data-centers:2025-10-14","date":"2025-10-14","kind":"value","field":"power.it_mw","before":222,"after":333,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 222 MW → 333 MW","url":"https://datacenters.prithvidixit.com/facilities/google-new-albany-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-new-albany","slug":"google-new-albany-new-albany-oh","name":"Google New Albany","state":"OH","orgIds":["google","google-deepmind","montauk-innovations-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-new-albany:power.facility_mw:epoch-ai-data-centers:2025-10-14","date":"2025-10-14","kind":"value","field":"power.facility_mw","before":267,"after":400,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 267 MW → 400 MW","url":"https://datacenters.prithvidixit.com/facilities/google-new-albany-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-new-albany","slug":"google-new-albany-new-albany-oh","name":"Google New Albany","state":"OH","orgIds":["google","google-deepmind","montauk-innovations-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-new-albany:size.buildings_operational:epoch-ai-data-centers:2025-10-14","date":"2025-10-14","kind":"value","field":"size.buildings_operational","before":3,"after":4,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 3 → 4","url":"https://datacenters.prithvidixit.com/facilities/google-new-albany-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-new-albany","slug":"google-new-albany-new-albany-oh","name":"Google New Albany","state":"OH","orgIds":["google","google-deepmind","montauk-innovations-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-new-albany:phase_operational:2025-10-14:epoch-ai-data-centers","date":"2025-10-14","kind":"milestone","milestone":"phase_operational","description":"Building 4 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 5 roof is half complete. About half of the backup generators are in place. One cooling tower is partly built.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 4 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 5 roof is half complete. About half of the backup generators are in place. One cooling…","url":"https://datacenters.prithvidixit.com/facilities/google-new-albany-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:size.buildings_operational:epoch-ai-data-centers:2025-10-14","date":"2025-10-14","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:status:epoch-ai-data-centers:2025-10-14","date":"2025-10-14","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-meta-prometheus","slug":"meta-prometheus-new-albany-oh","name":"Meta Prometheus","state":"OH","orgIds":["meta","vistra","terrapower","oklo","williams","aep","distribution-land-corp","sidecat-llc"],"iso":"PJM","utilities":["aep"],"id":"epoch-meta-prometheus:phase_operational:2025-10-14:epoch-ai-data-centers","date":"2025-10-14","kind":"milestone","milestone":"phase_operational","description":"Building 1 is operational, based on there being minimal construction work and cars in the main carpark. Building 2 still has some construction work around the building. Building 18 roof is complete. The on-site power at Socrates South and Socrates North has some outlines of gas turbines, to be installed later.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is operational, based on there being minimal construction work and cars in the main carpark. Building 2 still has some construction work around the building. Building 18 roof is complete. The on-site power …","url":"https://datacenters.prithvidixit.com/facilities/meta-prometheus-new-albany-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-openai-stargate-lordstown","slug":"openai-stargate-lordstown-warren-oh","name":"OpenAI Stargate Lordstown","state":"OH","orgIds":["softbank","openai","ohio-edison"],"iso":"PJM","utilities":["ohio-edison"],"id":"epoch-openai-stargate-lordstown:construction_start:2025-10-12:epoch-ai-data-centers","date":"2025-10-12","kind":"milestone","milestone":"construction_start","description":"Land clearing begins in the front of the site (the side facing the Ohio Turnpike), clearing away a parking lot and solar array","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Land clearing begins in the front of the site (the side facing the Ohio Turnpike), clearing away a parking lot and solar array","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-lordstown-warren-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-columbus","slug":"google-columbus-columbus-oh","name":"Google Columbus","state":"OH","orgIds":["google","google-deepmind","magellan-enterprises-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-columbus:power.it_mw:epoch-ai-data-centers:2025-10-01","date":"2025-10-01","kind":"value","field":"power.it_mw","before":130,"after":216,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 130 MW → 216 MW","url":"https://datacenters.prithvidixit.com/facilities/google-columbus-columbus-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-columbus","slug":"google-columbus-columbus-oh","name":"Google Columbus","state":"OH","orgIds":["google","google-deepmind","magellan-enterprises-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-columbus:power.facility_mw:epoch-ai-data-centers:2025-10-01","date":"2025-10-01","kind":"value","field":"power.facility_mw","before":156,"after":260,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 156 MW → 260 MW","url":"https://datacenters.prithvidixit.com/facilities/google-columbus-columbus-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-columbus","slug":"google-columbus-columbus-oh","name":"Google Columbus","state":"OH","orgIds":["google","google-deepmind","magellan-enterprises-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-columbus:size.buildings_operational:epoch-ai-data-centers:2025-10-01","date":"2025-10-01","kind":"value","field":"size.buildings_operational","before":2,"after":3,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 3","url":"https://datacenters.prithvidixit.com/facilities/google-columbus-columbus-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-google-columbus","slug":"google-columbus-columbus-oh","name":"Google Columbus","state":"OH","orgIds":["google","google-deepmind","magellan-enterprises-llc","aep"],"iso":"PJM","utilities":["aep"],"id":"epoch-google-columbus:phase_operational:2025-10-01:epoch-ai-data-centers","date":"2025-10-01","kind":"milestone","milestone":"phase_operational","description":"Building 3 operational. Surrounding roads finished, no more visible construction.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 3 operational. Surrounding roads finished, no more visible construction.","url":"https://datacenters.prithvidixit.com/facilities/google-columbus-columbus-oh","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"osm-way-368724474","slug":"equinix-dc7-vienna-va","name":"Equinix DC7","state":"VA","orgIds":["equinix","dominion"],"iso":"PJM","utilities":["dominion"],"id":"osm-way-368724474:land_acquired:2025-09-15:county-fairfax-va","date":"2025-09-15","kind":"milestone","milestone":"land_acquired","description":"Deed/transfer recorded for parcel 0392 01  0013D: $37,000,000.","sourceId":"county-fairfax-va","evidenceLevel":"confirmed","text":"Land acquired: Deed/transfer recorded for parcel 0392 01 0013D: $37,000,000.","url":"https://datacenters.prithvidixit.com/facilities/equinix-dc7-vienna-va","source":{"id":"county-fairfax-va","title":"ParcelPLUS Assessed Values","publisher":"Fairfax County, VA — Department of Tax Administration","url":"https://www.fairfaxcounty.gov/mercator/rest/services/GIS/ParcelPlusAssessedValues/MapServer/0","license":"Public record","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:size.buildings_operational:epoch-ai-data-centers:2025-09-09","date":"2025-09-09","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:status:epoch-ai-data-centers:2025-09-09","date":"2025-09-09","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-aws-berwick","slug":"aws-berwick-berwick-pa","name":"AWS Berwick","state":"PA","orgIds":["amazon","anthropic","ppl","talen-energy"],"iso":"PJM","utilities":["ppl"],"id":"epoch-aws-berwick:phase_operational:2025-09-09:epoch-ai-data-centers","date":"2025-09-09","kind":"milestone","milestone":"phase_operational","description":"Building 1 operational estimate. According to [Google Earth Satellite Imagery](https://earth.google.com/web/search/Berwick,+PA/@41.08459175,-76.14321499,203.05778839a,756.59305105d,35y,0h,0t,0r/data=CiwiJgokCYCDFkPTLDRAEX6DFkPTLDTAGUGoL_2-pEVAIRNn30rGL03AQgIIAUICCABKDQj___________8BEAA) from this date, Building 1 appears structurally complete and likely operational, while Building 2 is still missing two generators.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 operational estimate. According to Google Earth Satellite Imagery from this date, Building 1 appears structurally complete and likely operational, while Building 2 is still missing two generators.","url":"https://datacenters.prithvidixit.com/facilities/aws-berwick-berwick-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-coreweave-lancaster-greenfield-site","slug":"coreweave-lancaster-greenfield-site-lancaster-county-pa","name":"CoreWeave Lancaster Greenfield site","state":"PA","orgIds":["coreweave","openai","blue-owl","ppl"],"iso":"PJM","utilities":["ppl"],"id":"epoch-coreweave-lancaster-greenfield-site:construction_start:2025-07-15:epoch-ai-data-centers","date":"2025-07-15","kind":"milestone","milestone":"construction_start","description":"[Coreweave announces $6 billion investment into Lancaster data centers, at two former printing press sites.](https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Multi-Billion-Dollar-Commitment-to-AI-Infrastructure-in-Pennsylvania/default.aspx)","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Coreweave announces $6 billion investment into Lancaster data centers, at two former printing press sites.","url":"https://datacenters.prithvidixit.com/facilities/coreweave-lancaster-greenfield-site-lancaster-county-pa","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-anthropic-amazon-new-carlisle","slug":"anthropic-amazon-new-carlisle-new-carlisle-in","name":"Anthropic-Amazon New Carlisle","state":"IN","orgIds":["amazon","anthropic","indiana-michigan-power"],"iso":"PJM","utilities":["indiana-michigan-power"],"id":"epoch-anthropic-amazon-new-carlisle:size.buildings_operational:epoch-ai-data-centers:2025-06-23","date":"2025-06-23","kind":"value","field":"size.buildings_operational","before":0,"after":7,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 7","url":"https://datacenters.prithvidixit.com/facilities/anthropic-amazon-new-carlisle-new-carlisle-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}},{"facilityId":"epoch-anthropic-amazon-new-carlisle","slug":"anthropic-amazon-new-carlisle-new-carlisle-in","name":"Anthropic-Amazon New Carlisle","state":"IN","orgIds":["amazon","anthropic","indiana-michigan-power"],"iso":"PJM","utilities":["indiana-michigan-power"],"id":"epoch-anthropic-amazon-new-carlisle:status:epoch-ai-data-centers:2025-06-23","date":"2025-06-23","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/anthropic-amazon-new-carlisle-new-carlisle-in","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-09-27"}}],"meta":{"total":250,"limit":100,"offset":0,"next":"https://datacenters.prithvidixit.com/api/v1/changes?iso=PJM&offset=100&limit=100","dataAsOf":"2026-09-29"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}