{"data":[{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.it_mw:epoch-ai-data-centers:2026-11-01","date":"2026-11-01","kind":"value","field":"power.it_mw","before":618,"after":824,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 618 MW → 824 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.facility_mw:epoch-ai-data-centers:2026-11-01","date":"2026-11-01","kind":"value","field":"power.facility_mw","before":865,"after":1154,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 865 MW → 1.15 GW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:compute.h100e:epoch-ai-data-centers:2026-11-01","date":"2026-11-01","kind":"value","field":"compute.h100e","before":509300,"after":1018700,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Compute (H100-equivalents): 509,300 → 1,018,700","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:re.capex_usd_b:epoch-ai-data-centers:2026-11-01","date":"2026-11-01","kind":"value","field":"re.capex_usd_b","before":15.9,"after":31.2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Capital cost / investment: $15.9B → $31.2B","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:size.buildings_operational:epoch-ai-data-centers:2026-11-01","date":"2026-11-01","kind":"value","field":"size.buildings_operational","before":6,"after":8,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 6 → 8","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:status:epoch-ai-data-centers:2026-11-01","date":"2026-11-01","kind":"value","field":"status","before":"expanding","after":"operating","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Operating + expanding → Operating","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:phase_operational:2026-11-01:epoch-ai-data-centers","date":"2026-11-01","kind":"milestone","milestone":"phase_operational","description":"Buildings 7-8 are estimated to be operational. On March 24, Building 8 roughly looked like where Building 3 was in September. Building 3 is estimated to be operational in April, 7 months later. This naively suggests Building 8 will be operational by early November, 7 months after March 24. Oracle gave no date for the last two buildings on its September 10 call.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 7-8 are estimated to be operational. On March 24, Building 8 roughly looked like where Building 3 was in September. Building 3 is estimated to be operational in April, 7 months later. This naively suggests B…","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.it_mw:epoch-ai-data-centers:2026-09-10","date":"2026-09-10","kind":"value","field":"power.it_mw","before":412,"after":618,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 412 MW → 618 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.facility_mw:epoch-ai-data-centers:2026-09-10","date":"2026-09-10","kind":"value","field":"power.facility_mw","before":577,"after":865,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 577 MW → 865 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:size.buildings_operational:epoch-ai-data-centers:2026-09-10","date":"2026-09-10","kind":"value","field":"size.buildings_operational","before":4,"after":6,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 4 → 6","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:phase_operational:2026-09-10:epoch-ai-data-centers","date":"2026-09-10","kind":"milestone","milestone":"phase_operational","description":"Buildings 5-6 are operational. On Oracle's Q1 FY27 earnings call (September 10, 2026), Clay Magouyrk said \"6 of the 8 campus buildings, representing 618 megawatts and 75% of total capacity have now been delivered to the customer\" ([transcript](https://www.fool.com/earnings/call-transcripts/2026/09/11/oracle-orcl-q1-2027-earnings-call-transcript/)). 618 MW = 6 x 103 MW, matching the per-building IT power figure Crusoe reported earlier. Since Oracle is the chip owner rather than the facility operator, we assume \"delivered\" means the chips are installed and ready to use.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 5-6 are operational. On Oracle's Q1 FY27 earnings call (September 10, 2026), Clay Magouyrk said \"6 of the 8 campus buildings, representing 618 megawatts and 75% of total capacity have now been delivered to t…","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.it_mw:epoch-ai-data-centers:2026-07-28","date":"2026-07-28","kind":"value","field":"power.it_mw","before":412,"after":421,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 412 MW → 421 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.facility_mw:epoch-ai-data-centers:2026-07-28","date":"2026-07-28","kind":"value","field":"power.facility_mw","before":577,"after":590,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 577 MW → 590 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.it_mw:epoch-ai-data-centers:2026-05-23","date":"2026-05-23","kind":"value","field":"power.it_mw","before":206,"after":421,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 206 MW → 421 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.facility_mw:epoch-ai-data-centers:2026-05-23","date":"2026-05-23","kind":"value","field":"power.facility_mw","before":288,"after":590,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 288 MW → 590 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:size.buildings_operational:epoch-ai-data-centers:2026-05-23","date":"2026-05-23","kind":"value","field":"size.buildings_operational","before":2,"after":4,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 2 → 4","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:phase_operational:2026-05-23:epoch-ai-data-centers","date":"2026-05-23","kind":"milestone","milestone":"phase_operational","description":"Buildings 3 and 4 are estimated to be operational. On April 22nd, Oracle [posted](https://x.com/i/status/2047012589302153558) that \"In Abilene, 200MW is already operational\". This suggests that there was still only Building 1 and 2 operational. Since Buildings 3 and 4 looked complete from the outside on March 24th, we give it another month after Oracle's post for them to be operational. This would also give the buildings a similar 1 year 4 months timeline that Buildings 1 took from land clearing to being operational.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Buildings 3 and 4 are estimated to be operational. On April 22nd, Oracle posted that \"In Abilene, 200MW is already operational\". This suggests that there was still only Building 1 and 2 operational. Since Buildings 3 …","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.it_mw:epoch-ai-data-centers:2026-03-24","date":"2026-03-24","kind":"value","field":"power.it_mw","before":206,"after":211,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 206 MW → 211 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.facility_mw:epoch-ai-data-centers:2026-03-24","date":"2026-03-24","kind":"value","field":"power.facility_mw","before":288,"after":295,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 288 MW → 295 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.it_mw:epoch-ai-data-centers:2026-01-15","date":"2026-01-15","kind":"value","field":"power.it_mw","before":206,"after":211,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 206 MW → 211 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.facility_mw:epoch-ai-data-centers:2026-01-15","date":"2026-01-15","kind":"value","field":"power.facility_mw","before":288,"after":295,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 288 MW → 295 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.it_mw:epoch-ai-data-centers:2025-12-24","date":"2025-12-24","kind":"value","field":"power.it_mw","before":103,"after":211,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current IT capacity: 103 MW → 211 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:power.facility_mw:epoch-ai-data-centers:2025-12-24","date":"2025-12-24","kind":"value","field":"power.facility_mw","before":144,"after":295,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Current facility power: 144 MW → 295 MW","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:size.buildings_operational:epoch-ai-data-centers:2025-12-24","date":"2025-12-24","kind":"value","field":"size.buildings_operational","before":1,"after":2,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 1 → 2","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:phase_operational:2025-12-24:epoch-ai-data-centers","date":"2025-12-24","kind":"milestone","milestone":"phase_operational","description":"Building 2 is fully operational. This exact date corresponds to the expected completion date of \"Four (4) data hall spaces and an administrative office build-out\" according to a [TDLR filing](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2025007742), but this date is also consistent with satellite imagery. By January 15, Building 2 looked as finished as Building 1, whereas on September 26 it did not look finished.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 2 is fully operational. This exact date corresponds to the expected completion date of \"Four (4) data hall spaces and an administrative office build-out\" according to a TDLR filing, but this date is also cons…","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:size.buildings_operational:epoch-ai-data-centers:2025-09-26","date":"2025-09-26","kind":"value","field":"size.buildings_operational","before":0,"after":1,"sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Buildings operational: 0 → 1","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:status:epoch-ai-data-centers:2025-09-26","date":"2025-09-26","kind":"value","field":"status","before":"under_construction","after":"expanding","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Status: Under construction → Operating + expanding","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:phase_operational:2025-09-26:epoch-ai-data-centers","date":"2025-09-26","kind":"milestone","milestone":"phase_operational","description":"Building 1 is fully operational around this date. The first phase was \"live\" on September 30 according a Crusoe [announcement](https://www.crusoe.ai/resources/newsroom/crusoe-announces-flagship-abilene-data-center-is-live). While the first phase consists of Building 1 and 2, the language doesn't outright confirm that both buildings are fully operational. The announcement also stated that \"Oracle began delivering the first NVIDIA GB200 racks in June\", and we think 3 months is enough time to ram to 50,000 GB200s in Building 1. The satellite image also suggests that Building 1 is complete (shell and equipment done, many cars neatly parked) while Building 2 is ongoing (trucks and construction equipment still present). The 200 MW [substation](https://www.mortenson.com/projects/abilene-data-center-development) built in 2022 and expanded in 2024 is enough to power both buildings. To the right of Building 2, five gas turbines are in place with five more turbines still under construction. Chillers are partly installed for Building 3. Roof is complete for Building 4. The larger 1 GW substation is not complete yet.","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"New capacity online: Building 1 is fully operational around this date. The first phase was \"live\" on September 30 according a Crusoe announcement. While the first phase consists of Building 1 and 2, the language doesn't outright confirm t…","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}},{"facilityId":"epoch-openai-stargate-abilene","slug":"openai-stargate-abilene-abilene-tx","name":"OpenAI Stargate Abilene","state":"TX","county":"Taylor County","orgIds":["oracle","openai","softbank","mortenson","aep","crusoe","lancium"],"iso":"ERCOT","utilities":["aep"],"id":"epoch-openai-stargate-abilene:construction_start:2024-05-31:epoch-ai-data-centers","date":"2024-05-31","kind":"milestone","milestone":"construction_start","description":"Land clearing begins for northern two buildings (Building 1-2)","sourceId":"epoch-ai-data-centers","evidenceLevel":"estimated","text":"Construction started: Land clearing begins for northern two buildings (Building 1-2)","url":"https://datacenters.prithvidixit.com/facilities/openai-stargate-abilene-abilene-tx","source":{"id":"epoch-ai-data-centers","title":"AI data centers (Frontier Data Centers Hub)","publisher":"Epoch AI","url":"https://epoch.ai/data/ai-data-centers","license":"CC BY 4.0","retrievedAt":"2026-11-02"}}],"meta":{"total":29,"limit":100,"offset":0,"dataAsOf":"2026-11-09"},"attribution":{"license":"Open Database License (ODbL) 1.0 for the compiled database; individual sources keep their own terms (see sources[].license).","credit":["© OpenStreetMap contributors (ODbL 1.0) — https://www.openstreetmap.org/copyright","Epoch AI, 'AI data centers'. Published online at epoch.ai. Retrieved from 'https://epoch.ai/data/ai-data-centers' (CC BY 4.0)","Datacenter Source — https://datacenters.prithvidixit.com"],"terms":"/api#license","note":"Every figure links to its source. MW totals are floors (most facilities don't disclose power). Evidence levels: confirmed / announced / estimated — see /sources#evidence-levels."}}