AT&T
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityAT&T
- →substationNot identifiedUnknownUnverifiedNo substation mapped within 3 km and none named in filings.
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →utilitySouthern California Edison[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 34.57988, -118.11398
- Address
- County
- Los Angeles County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- State avg. industrial price
California statewide average, July 2026.
- State avg. commercial price
California statewide average, July 2026.
- Generation within 50 km
161 EIA-reported plants within 50 km.
- Generation queued in county
20 active generation interconnection requests in Los Angeles County: Storage 4,550 MW, Solar + storage 2,336 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Solar Star 2 · Solar Star California XX, LLC | Power plant (Solar) | 37 km | 275 MW | [6] |
| Solar Star 1 · Solar Star California XIX, LLC | Power plant (Solar) | 37.5 km | 310 MW | [6] |
| Golden Field Solar III, LLC · Golden Fields Solar III, LLC | Power plant (Solar) | 39.3 km | 339 MW | [6] |
| Edwards Sanborn E1a · Terra-Gen Operating Co-Hybrid | Power plant (Solar) | 42.5 km | 293 MW | [6] |
| Edwards Sanborn E1b · Terra-Gen Operating Co-Hybrid | Power plant (Solar) | 42.8 km | 290 MW | [6] |
| Valley (Ca) · Los Angeles Department of Water & Power | Power plant (Natural Gas) | 45.1 km | 563 MW | [6] |
| Magnolia Power Project · City of Burbank Water and Power | Power plant (Natural Gas) | 48.3 km | 301 MW | [6] |
| Castaic · Los Angeles Department of Water & Power | Power plant (Pumped Storage) | 49.7 km | 1.68 GW | [6] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| ANGELENO SOLAR FARMCAISO 1625 | Solar + storage | IA signed · proposed 2028-12 | 1.15 GW | [4] |
| ANTELOPE SOLAR 2CAISO 1208 | Solar + storage | IA signed · proposed 2025-11 | 650 MW | [4] |
| FLEETWOODCAISO 2111 | Storage | In study · proposed 2032-04 | 400 MW | [4] |
| GABRIEL STORAGECAISO 2113 | Storage | IA signed · proposed 2033-05 | 400 MW | [4] |
| SIMONCAISO 2115 | Storage | In study · proposed 2032-04 | 400 MW | [4] |
| MARICICAISO 2116 | Storage | IA signed · proposed 2031-02 | 400 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational1974[1]
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
All claims (provenance audit)
12| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | AT&Tway/472954201 name=AT&T | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 901 East Palmdale Boulevard, Palmdale, CA 93550 | [1] | Likely | 2026-09-27 | Shown |
| Utility | Southern California Edisonterritory 17609: SOUTHERN CALIFORNIA EDISON CO (INVESTOR OWNED, SOUTHERN CALIFOR | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | CAISOCALIFORNIA INDEPENDENT SYSTEM OPERATOR | [3] derived | Likely | — | Shown |
| Balancing authority | CISO | [2] derived | Likely | — | Shown |
| Generation queued in county | 6.89 GW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 25.11¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 30.56¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 9.85 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 17,400 sq ft | [1] derived | Likely | 2026-09-27 | Shown |
| First operational | 1974start_date=1974 | [1] | Likely | 2026-09-27 | Shown |