Sources & methodology
Every value on this site is a claim: one source asserting one value for one attribute of one facility, with a confidence level, a date, and — for hand-researched facts — a verbatim quote. Nothing is overwritten when a new source arrives; the displayed value is computed from all claims, and disagreements stay visible.
Data built 2026-09-29 · OpenStreetMap snapshot 2026-09-27 · Epoch AI snapshot 2026-09-27
Data layers
OpenStreetMap (ODbL) supplies broad coverage: features tagged telecom=data_center or building=data_center, with outlines, names, operators and addresses. Status is inferred (a mapped building is assumed to exist), footprints are measured from outlines, and floor area is only estimated when floors are tagged.
Epoch AI — AI data centers (CC BY 4.0) supplies campus-level records for frontier AI sites: owners, users, satellite-derived construction timelines, traced building outlines, and modeled power, compute and capital-cost estimates. Epoch’s confidence tags are carried through as-is.
Curated research adds facts from primary sources (company announcements, filings) and reputable reporting. Each curated claim carries a verbatim quote and outranks dataset claims of equal confidence.
County records (public record) add parcels, owners of record, tax-bill mailing names, zoning, building area, assessed values (land / improvements / total by tax year) and recorded sales. Loudoun County, VA also contributes its data-center parcel inventory and site-plan pipeline; other counties come from their assessor or auditor GIS layers: Fairfax and Prince William (VA), Maricopa (AZ), Franklin and Licking (OH), and Ellis (TX, via a third-party copy of appraisal-district data, rated “likely”). County-listed sites missing from other sources are added as their own records.
Interconnection queues (PJM, MISO, SPP, ERCOT, CAISO, NYISO) show what is waiting to connect to the grid around each site. NYISO also publishes individual large-load requests with a data-center end-use flag; those are matched to facilities (or added as planned sites) and give a site-specific interconnection status. Grid-operator statements about data-center load (e.g. ERCOT’s large-load queue) are shown with verbatim quotes.
Grid & electricity: utility service territories and ISO/RTO footprints (HIFLD, from EIA-861), EIA-860 power plants, EIA state retail prices, and substations and transmission lines mapped in OpenStreetMap. These are location-derived: they say what a site lies within or near, not what it is interconnected to.
Imagery & photos: Esri World Imagery (current) and its Wayback archive (historical releases for construction progress), plus openly licensed, geotagged photographs from Wikimedia Commons, each with its own author and license.
Building-level records that fall inside a known campus are linked to it; unnamed buildings inside an Epoch campus are folded into the campus record, and their total outline area is kept as a derived footprint claim.
Confidence levels
- Confirmed
- Stated by a primary source (the company, a filing) or strong evidence per the dataset.
- Likely
- Reported by a reputable secondary source or dataset, or estimated with a documented method.
- Unverified
- Inferred by our pipeline or community-contributed without corroboration.
- Speculative
- Some reason to believe it, but no direct record of it.
Values also carry a method: reported (stated by the source), derived (computed by our pipeline from source data, e.g. footprint from an outline) or estimated (a model estimate, e.g. Epoch’s power or capital cost).
How conflicts are resolved
- Within one source, only its most recent claim for a field counts.
- Across sources, the value backed by the highest-confidence claim wins.
- Ties go to the higher-priority source (curated research › research datasets › community maps), then the more recent claim, then the value more sources agree on.
- All other values are shown under the winning value as “Also reported”, with their sources.
- Ownership, customer and utility relationships are multi-valued: every asserted party is listed with its own confidence.
Three kinds of property values
- Official assessments: the county assessor's value for a tax year, shown with the tax year and parcel.
- Recorded transactions: sale prices and dates from deed records.
- Model estimates: our comparable-assessment model (median assessed $/sq ft of footprint among ≥5 assessed data-center facilities in the same county). Always labeled, rated speculative, and never an appraisal.
Time to power & project verification
Each facility gets a verification ladder, a power-reality comparison and, where evidence allows, a time-to-power window. All are computed by explicit rules in src/lib/pipeline/power from the facility's claims, queue records and timeline. Nothing is predicted by an AI model.
Stages and evidence
Stages: Announced → Land acquired → Planning / zoning → Permitting → Interconnection application → Feasibility study → System impact study → Facilities study → Interconnection agreement / service contract → Financing → Under construction → Energization → Operational. A stage counts as reached only with dated evidence. Projected milestones and speculative claims never count. Earlier development stages can be shown as implied by a later one, labeled as such. Grid-study stages are never implied. Evidence is classified as: Community map, Model estimate, News report, Company announcement, Utility filing / announcement, Government record, Permit / site plan, ISO/RTO queue, Interconnection agreement / service contract, Satellite imagery, Construction evidence.
- Verified operating: Operation documented by imagery, government records or the operator.
- Grid-backed: A documented interconnection agreement or utility service commitment, or construction together with a grid record.
- Under construction: Construction documented; no public grid agreement found yet.
- Documented development: Land, zoning, permits or an interconnection application on record; no construction yet.
- Announced only: Only announcements or news reports; no filings, permits or grid records found.
- Unverified: Only community-mapped or modeled data.
Power reality
Announced is the largest MW reported by a company, utility, government or press source. Interconnection is MW in active load requests. Contracted / approved covers requests past an executed interconnection agreement, or a reported utility or power contract. Under construction is phases observed under construction. Operational is capacity online. On-site and dedicated generation is listed separately and never added to grid capacity. A nearby EIA plant counts only as unverified co-location.
Grid path
Facility → substation → transmission → utility → ISO. Each hop states how it is known. Documented means named in a source. Queue POI means the point of interconnection on the site's own load request. Satellite imagery means an on-site substation outline. Proximity means nearest mapped asset, always unverified. Service territory is based on utility or ISO polygons. Substation capacity and congestion are not yet sourced and are shown as such.
Time-to-power window
The window starts from the furthest documented stage. It then uses editorial ranges for how long large loads (roughly 100 MW and up) have typically taken to reach first power from that stage. These are judgments drawn from public reporting on large-load interconnection and hyperscale construction, not a fitted statistical model:
| Announced | 2–5 years |
| Land acquired | 2–4.5 years |
| Planning / zoning | 1.75–4 years |
| Permitting | 1.5–4 years |
| Interconnection application | 2–4 years |
| Feasibility study | 2–4 years |
| System impact study | 1.5–3.5 years |
| Facilities study | 1–3 years |
| Interconnection agreement / service contract | 0.75–2.5 years |
| Financing | 1–3 years |
| Under construction | 0.5–2 years |
- Under construction with a known start date: the remainder of a 1.25–2.5 year build. Expansions are timed from the current phase's start.
- No public grid record before construction: one year is added to the upper bound.
- A stated date (energization, the queue's requested in-service date, or expected completion) anchors the window. It allows slippage of 2 years before an interconnection agreement, 1.25 years after one, and 0.75 years once under construction. Passed dates without confirmation are flagged. Modeled dates only widen the window.
- Confidence is High only for sites under construction with a grid record and a consistent stated date. It is Low for announced-only or unverified projects.
- The map and dashboard bucket sites by the window's midpoint. Expansions show the timing of their remaining capacity.
How AI is used
The language model sits on top of the database; it is never a source of facts. We use free models via OpenRouter for:
- Source extraction: proposing facts and relationships from a document. A fact is kept only if its supporting quote appears verbatim in the stored document text, and its facility is matched with ≥75% confidence (or a human accepts it). Such claims are marked AI-extracted, rated “likely” at most, and cite the document.
- Entity resolution: judging whether records from different sources are the same site; decisions are stored with confidence and reasoning and can be overridden.
- Routing explanations: rephrasing our routing estimate; rejected if it mentions a region or facility not in the estimate.
- Research assistant: planning database queries; the answer may cite only rows the queries returned, and figures are checked against them.
- Power evidence briefs: summarizing a facility's evidence and explaining its time-to-power window. The model sees only a numbered evidence pack. The brief is rejected if it cites an id not in the pack, uses a number, year or window not in the pack, names a substation or facility not in the pack, or claims certainty. The model explains the window; it never sets it.
- Grid and power extraction (queue IDs, serving substation, expected energization, on-site generation, financing) also requires the extracted MW, date or queue ID to appear in the fact's own quote.
History
Every build appends tracked values (capacity, status, size, assessments, permits…) to an append-only ledger with first- and last-seen dates, and dated claims (e.g. each observed construction milestone) are kept rather than overwritten. Facility pages show what changed over the last three years.
Known limitations
- Coverage follows what’s mapped or researched; many enterprise and smaller colocation sites are missing, and some OSM entries are small server rooms.
- Most facilities don’t disclose power; totals only sum facilities with a figure, and most figures for AI campuses are modeled estimates.
- Tenants of colocation facilities are rarely public; the tenant field is empty unless a source states it.
- Company names from OSM that couldn’t be matched to a reviewed company appear as “unreviewed” records.
- County parcel and assessor data covers seven counties so far (Loudoun, Fairfax, Prince William, Maricopa, Franklin, Licking, Ellis); Tarrant and Dallas (TX) were tried but lack reliable public parcel services.
- Interconnection queues list applications, not commitments; only NYISO publishes project-level large-load requests, so most data centers have no site-specific queue record.
- Utility territory polygons are approximate and overlap; the utility shown is the most likely retail provider and is marked unverified when territories overlap.
- Photos are matched by camera location and title keywords and may show a neighboring building.
Source registry
Sources that contribute claims, followed by documents cited as supporting references.
| Source | Type | License | Claims | Facilities |
|---|---|---|---|---|
| OpenStreetMap — features tagged telecom=data_center or building=data_center OpenStreetMap contributors · Community-mapped. Locations and outlines are generally accurate; names/operators are volunteer-entered and occasionally stale. Each OSM element is also cited individually. | Dataset | ODbL 1.0 | 14,331 | 1,876 |
| Electric Power Monthly, Table 5.6.A — Average price of electricity to ultimate customers by state (July 2026) U.S. Energy Information Administration · State-level averages across all customers in the sector; large-load contracts are often priced differently. | Government | Public domain | 3,856 | 1,928 |
| Electric Retail Service Territories (HIFLD, from EIA-861) DHS HIFLD / U.S. EIA (via Esri Living Atlas) · Approximate service-area polygons. Overlapping territories (e.g. co-ops) are all listed. | Government | Public domain | 3,789 | 1,927 |
| Existing Data Center Parcels Loudoun County, VA — Department of Planning & Zoning GIS · County inventory of parcels with existing data-center use: record owner, permitted building square footage, permits, zoning and build status. | Government | Public record | 2,378 | 241 |
| AI data centers (Frontier Data Centers Hub) Epoch AI · Campus-level research dataset. Construction timelines come primarily from satellite imagery; power, compute (H100e) and capital cost are Epoch's modeled estimates. Future-dated timeline entries are projections. | Research | CC BY 4.0 | 2,087 | 77 |
| Independent System Operators (HIFLD) DHS HIFLD (via PNNL ArcGIS) | Government | Public domain | 1,929 | 1,929 |
| Power Plants in the U.S. (EIA-860) U.S. Energy Information Administration | Government | Public domain | 1,929 | 1,929 |
| PJM New Services Queue (planning queues) PJM Interconnection · Requests to connect to the transmission grid. Queue position is not a commitment to build; most requests never reach operation. | Regulatory filing | Public | 722 | 722 |
| Pipeline Data Center Areas (site plans under review or approved) Loudoun County, VA — Department of Planning & Zoning GIS | Government | Public record | 556 | 82 |
| Assessor Parcels Maricopa County Assessor's Office, AZ · Full cash value (FCV) is the assessor's market-value estimate for the tax year; sale price/date come from recorded deeds. | Government | Public record | 448 | 64 |
| Parcel CAMA (Public) Prince William County, VA — GIS / Real Estate Assessments · Owner of record, acreage, use code, above-grade building area and deed recording; assessed values are not in this layer. | Government | Public record | 329 | 68 |
| Central Ohio Parcels (Franklin County Auditor data) City of Columbus GIS / Franklin County Auditor · Auditor land/building/total values, owner of record and the name on the tax mailing address, class description and last sale. | Government | Public record | 263 | 33 |
| NYISO Interconnection Queue (generation and load projects) New York ISO · Requests to connect to the transmission grid. Queue position is not a commitment to build; most requests never reach operation. | Regulatory filing | Public | 260 | 57 |
| Auditor Parcels Licking County, OH — Auditor · Market land/improvement/total value, owner of record, land use and the last two recorded transfers. | Government | Public record | 217 | 32 |
| CAISO Public Queue Report California ISO · Requests to connect to the transmission grid. Queue position is not a commitment to build; most requests never reach operation. | Regulatory filing | Public | 205 | 205 |
| ERCOT Generator Interconnection Status (GIS) Report ERCOT · Requests to connect to the transmission grid. Queue position is not a commitment to build; most requests never reach operation. | Regulatory filing | Public | 191 | 191 |
| ParcelPLUS Assessed Values Fairfax County, VA — Department of Tax Administration · Assessed land, building and total values by tax year; prior-year values included. Owner names are not published in this layer. | Government | Public record | 187 | 34 |
| Annual energy estimate Datacenter Source (this site) · Online facility power (or IT power × 1.3 when only IT load is known) × 8,760 h × 70% average utilization. Epoch AI notes actual consumption typically runs 60–80% of capacity; 70% is the midpoint. Not metered data. | Research | — | 122 | 122 |
| Large Load Projects and Tariffs (September 2026) Edison Electric Institute · 2026-09-11 · Compilation by the utilities' trade association of publicly announced large-load projects in member utilities' service territories. Reviewed and transcribed by Claude (AI assistant, not a human) on 2026-09-28; each claim quotes the document verbatim. | Research | — | 116 | 35 |
| MISO Generator Interconnection Queue Midcontinent ISO · Requests to connect to the transmission grid. Queue position is not a commitment to build; most requests never reach operation. | Regulatory filing | Public | 111 | 111 |
| SPP Generation Interconnection Active Requests Southwest Power Pool · Requests to connect to the transmission grid. Queue position is not a commitment to build; most requests never reach operation. | Regulatory filing | Public | 85 | 85 |
| Ellis County Parcel Ownership Data (ArcGIS Online copy of appraisal district data) Ellis Appraisal District data, hosted by a third party on ArcGIS Online · Not published by the county itself — values match the appraisal district's fields but should be checked against esearch.elliscad.com. | Government | Public record | 48 | 8 |
| Amazon opens $11 billion AI data center Project Rainier in Indiana CNBC · 2025-10-29 | News | — | 20 | 1 |
| Deepening our investment in Richland Parish, Louisiana Meta · 2026-07-13 | Company | — | 16 | 1 |
| Comparable-assessment value model Datacenter Source (this site) · Median assessed value per square foot of building footprint across assessed data-center parcels in the same county, times this facility's footprint. Only produced with ≥5 comparables. Not an appraisal. | Research | — | 14 | 14 |
| Port Washington data center campus will be $15B hub for OpenAI, Oracle 'Stargate' program - WPR WPR · 2025-10-23 · Facts extracted by nvidia/nemotron-3-ultra-550b-a55b:free; each quote verified against the retrieved text. | News | — | 11 | 1 |
| Galaxy Completes Phase I of Its Helios Data Center Campus, Delivering 133 Megawatts of Critical IT Load to CoreWeave prnewswire.com · 2026-07-06 · Facts extracted by nvidia/nemotron-3-super-120b-a12b:free; each quote verified against the retrieved text. | News | — | 9 | 1 |
| Crusoe expands Abilene AI campus to 1.2 GW | Crusoe Crusoe · 2025-03-18 · Facts extracted by nvidia/nemotron-3-super-120b-a12b:free; each quote verified against the retrieved text. | Company | — | 8 | 1 |
| OpenAI, Oracle and Vantage Data Centers Announce Stargate Data Center Site in Wisconsin - Vantage Data Centers Vantage Data Centers · Facts extracted by nvidia/nemotron-3-super-120b-a12b:free; each quote verified against the retrieved text. | News | — | 7 | 2 |
| Crusoe Announces Flagship Abilene Data Center is Live Crusoe · 2025-09-30 | Press release | — | 7 | 1 |
| Data center officials share timeline « The VW independent thevwindependent.com · Facts extracted by nvidia/nemotron-3-super-120b-a12b:free; each quote verified against the retrieved text. | News | — | 7 | 1 |
| Related Digital | Data Centers Done Right RELATED DIGITAL · 2025-10-30 · Facts extracted by nvidia/nemotron-3-super-120b-a12b:free; each quote verified against the retrieved text. | News | — | 7 | 1 |
| Entergy Louisiana to power Meta’s data center in Richland Parish - Entergy Entergy · 2024-12-06 · Facts extracted by nvidia/nemotron-3-super-120b-a12b:free; each quote verified against the retrieved text. | Company | — | 6 | 1 |
| Inside the power deal behind Meta’s El Paso data center now at $10 billion - El Paso Matters El Paso Matters · 2026-03-29 · Facts extracted by nvidia/nemotron-3-super-120b-a12b:free; each quote verified against the retrieved text. | News | — | 6 | 1 |
| Meta signs nuclear energy deals to power Prometheus AI supercluster CNBC · 2026-01-09 | News | — | 5 | 1 |
| Regulators approve DTE contracts for Michigan’s first hyperscale data center - Bridge Michigan Bridge Michigan · 2025-12-18 · Facts extracted by nvidia/nemotron-3-super-120b-a12b:free; each quote verified against the retrieved text. | News | — | 5 | 1 |
| Inside the world's most powerful AI datacenter Microsoft · 2025-09-18 | Company | — | 4 | 1 |
| Microsoft completes construction on first datacenter facility in Mount Pleasant, Wisconsin Microsoft · 2026-06-23 | Press release | — | 3 | 1 |
| MPSC approves DTE Electric energy contracts for data center with conditions to strengthen protections for other customers Michigan Public Service Commission · 2025-12-18 · Utility commission order (Case U-21990). Reviewed and transcribed by Claude (AI assistant, not a human) on 2026-09-28. | Government | — | 3 | 1 |
| Talen to sell Amazon 1.9 GW from Susquehanna nuclear plant | Utility Dive utilitydive.com · 2025-06-11 · Facts extracted by nvidia/nemotron-3-super-120b-a12b:free; each quote verified against the retrieved text. | News | — | 3 | 1 |
| New supply agreement expands Talen-Amazon partnership - World Nuclear News World Nuclear News · 2025-06-12 · Facts extracted by nvidia/nemotron-3-super-120b-a12b:free; each quote verified against the retrieved text. | News | — | 2 | 1 |
| Big things are happening, El Paso! - Meta Data Centers Meta Data Centers · 2026-03-26 · Facts extracted by nvidia/nemotron-3-super-120b-a12b:free; each quote verified against the retrieved text. | Company | — | 1 | 1 |
Cited references (217)
| Source | Type | License | Claims | Facilities |
|---|---|---|---|---|
| Google 2025 Environmental Report sustainability.google · Cited by Epoch AI for Google Pryor (North). | Company | — | 0 | 4 |
| Backup diesel generator referenced in the permit cat.com · Cited by Epoch AI for Anthropic-Amazon New Carlisle. | News | — | 0 | 3 |
| Environmental permit detailing power generation deq.virginia.gov · Cited by Epoch AI for QTS Richmond 1. | Government | — | 0 | 3 |
| New York Times article on Project Rainier nytimes.com · Cited by Epoch AI for Amazon Madison Mega Site. | News | — | 0 | 3 |
| MISO Announcement reporting power for newest buildings, likely an overestimate cdn.misoenergy.org · Cited by Epoch AI for Microsoft Project Osmium. | News | — | 0 | 3 |
| Announcement of Anthropic-Fluidstack partnership, including data center(s) in New York Anthropic · Cited by Epoch AI for Core42 Lake Mariner. | Company | — | 0 | 3 |
| OpenAI article mentioning they use Microsoft's Fairwater supercomputers OpenAI · Cited by Epoch AI for Microsoft Fairwater Atlanta. | Company | — | 0 | 2 |
| Draft basis of air permit for Google Omaha, a similar data center Document mirror (Google Drive) · Cited by Epoch AI for Google New Albany. | Research | — | 0 | 2 |
| Richmond 1 factsheet qtsdatacenters.com · Cited by Epoch AI for QTS Richmond 1. | News | — | 0 | 2 |
| SemiAnalysis article SemiAnalysis · Cited by Epoch AI for Microsoft Goodyear. | News | — | 0 | 2 |
| Google PUE data listing the "3rd facility" from Q3 2025 datacenters.google · Cited by Epoch AI for Google The Dalles. | Company | — | 0 | 2 |
| Core Scientific - June 2024 Investor and Analyst Day U.S. SEC · Cited by Epoch AI for CoreWeave Marble NC. | Regulatory filing | — | 0 | 2 |
| Terawulf press release with details and timeline for Buildings 1-5 investors.terawulf.com · Cited by Epoch AI for Core42 Lake Mariner. | News | — | 0 | 2 |
| DCD article suggesting that Fluidstack will deploy Google TPUs at Lake Mariner DCD · Cited by Epoch AI for Core42 Lake Mariner. | News | — | 0 | 2 |
| WSJ profile of the Colossus data centers wsj.com · Cited by Epoch AI for Colossus 2. | News | — | 0 | 1 |
| Final GPU count reported by Elon Musk X (Twitter) · Cited by Epoch AI for Colossus 2. | Company | — | 0 | 1 |
| MLGW update mentioning power requests for Colossus 2 mlgw.com · Cited by Epoch AI for Colossus 2. | News | — | 0 | 1 |
| SpaceX-Cursor partnership to use Colossus X (Twitter) · Cited by Epoch AI for Colossus 2. | Company | — | 0 | 1 |
| Anthropic to use Colossus 2 from June 2026 X (Twitter) · Cited by Epoch AI for Colossus 2. | Company | — | 0 | 1 |
| SpaceX S-1 filing, mentioning exact compute and power for Colossus 2 U.S. SEC · Cited by Epoch AI for Colossus 2. | Regulatory filing | — | 0 | 1 |
| 2023 Air Permit application Document mirror (Google Drive) · Cited by Epoch AI for Microsoft Fairwater Atlanta. | Research | — | 0 | 1 |
| YouTube video with aerial views youtube.com · Cited by Epoch AI for Microsoft Fairwater Atlanta. | News | — | 0 | 1 |
| Bloomberg article Bloomberg · Cited by Epoch AI for Microsoft Fairwater Atlanta. | News | — | 0 | 1 |
| Air Construction Permit application for the northern portion Document mirror (Google Drive) · Cited by Epoch AI for Anthropic-Amazon New Carlisle. | Research | — | 0 | 1 |
| Announcement of Project Rainier coming online aboutamazon.com · Cited by Epoch AI for Anthropic-Amazon New Carlisle. | Company | — | 0 | 1 |
| Air permit for Buildings 19-32, suggesting expansion to 2.3 GW total facility power t.co · Cited by Epoch AI for Anthropic-Amazon New Carlisle. | News | — | 0 | 1 |
| Google announces expansion of Pryor facility blog.google · Cited by Epoch AI for Google Pryor (North). | Company | — | 0 | 1 |
| News of a 9 exaflop TPUv4 cluster in the Pryor data center, launched in 2022 techcrunch.com · Cited by Epoch AI for Google Pryor (North). | News | — | 0 | 1 |
| Meta blog post with details on Prometheus Meta · Cited by Epoch AI for Meta Prometheus. | Company | — | 0 | 1 |
| New Albany Business Park land use map Document mirror (Google Drive) · Cited by Epoch AI for Meta Prometheus. | Research | — | 0 | 1 |
| Letter on Socrates South Power Generation Project Document mirror (Google Drive) · Cited by Epoch AI for Meta Prometheus. | Research | — | 0 | 1 |
| Crusoe 2024 Impact Report, with details on Abilene Document mirror (Google Drive) · Cited by Epoch AI for OpenAI Stargate Abilene. | Research | — | 0 | 1 |
| Air Permit Application for buildings 1-2, featuring blueprints on p.157 Document mirror (Google Drive) · Cited by Epoch AI for OpenAI Stargate Abilene. | Research | — | 0 | 1 |
| Mortensen’s profile of the project, with details of substations mortenson.com · Cited by Epoch AI for OpenAI Stargate Abilene. | News | — | 0 | 1 |
| Microsoft blog with more general information Microsoft · Cited by Epoch AI for Microsoft Fairwater Wisconsin. | Company | — | 0 | 1 |
| Construction Permit Application for building 1 Document mirror (Google Drive) · Cited by Epoch AI for Microsoft Fairwater Wisconsin. | Research | — | 0 | 1 |
| Plan for 9-building and 6-building expansions Document mirror (Google Drive) · Cited by Epoch AI for Microsoft Fairwater Wisconsin. | Research | — | 0 | 1 |
| DCD article detailing early work beginning on the site DCD · Cited by Epoch AI for Google Columbus. | News | — | 0 | 1 |
| Transmission line construction notice; details current site capacity, expansion, and maximum future site capacity aeptransmission.com · Cited by Epoch AI for Google Columbus. | News | — | 0 | 1 |
| DCD article on the site breaking ground DCD · Cited by Epoch AI for Google Mesa. | News | — | 0 | 1 |
| DCD article on announcement to build Building 2 DCD · Cited by Epoch AI for Google Mesa. | News | — | 0 | 1 |
| May 2025 Electricity Provider Disclosure Document mirror (Google Drive) · Cited by Epoch AI for Colossus 1. | Research | — | 0 | 1 |
| July 2025 Permit for Gas Turbines scribd.com · Cited by Epoch AI for Colossus 1. | News | — | 0 | 1 |
| Southern Environmental Law Center Gas Permit Appeal, with additional satellite images cdn.arstechnica.net · Cited by Epoch AI for Colossus 1. | News | — | 0 | 1 |
| Disclosure on X (formerly Twitter) by Elon Musk of the breakdown of GPUs archive.is · Cited by Epoch AI for Colossus 1. | News | — | 0 | 1 |
| Anthropic announcement Anthropic · Cited by Epoch AI for Colossus 1. | Company | — | 0 | 1 |
| Construction permit application form with site address programs.iowadnr.gov · Cited by Epoch AI for Google Council Bluffs (East). | Government | — | 0 | 1 |
| Core Scientific - CoreWeave Announce 1.2B expansion in Denton, TX investors.corescientific.com · Cited by Epoch AI for CoreWeave Denton TX. | News | — | 0 | 1 |
| Core Scientific - Denton Datacenter Official Site corescientific.com · Cited by Epoch AI for CoreWeave Denton TX. | News | — | 0 | 1 |
| TMF - Core Scientific Q4 2025 Earnings Transcript fool.com · Cited by Epoch AI for CoreWeave Denton TX. | News | — | 0 | 1 |
| WSJ - plans to rent to OpenAI wsj.com · Cited by Epoch AI for CoreWeave Denton TX. | News | — | 0 | 1 |
| Official Meta announcement. Meta · Cited by Epoch AI for Meta Rosemount. | Company | — | 0 | 1 |
| Air quality permit for initial buildout. Document mirror (Google Drive) · Cited by Epoch AI for Meta Rosemount. | Research | — | 0 | 1 |
| Air Construction Permit Document mirror (Google Drive) · Cited by Epoch AI for Amazon Madison Mega Site. | Research | — | 0 | 1 |
| SemiAnalysis article with imagery of Canton they have labeled as being an Amazon-Anthropic collaboration SemiAnalysis · Cited by Epoch AI for Amazon Madison Mega Site. | News | — | 0 | 1 |
| Google Environmental Report sustainability.google · Cited by Epoch AI for Google Bristow. | Company | — | 0 | 1 |
| Maricopa County map gis.maricopa.gov · Cited by Epoch AI for Microsoft Goodyear. | Government | — | 0 | 1 |
| Dust control permit edms.maricopa.gov · Cited by Epoch AI for Microsoft Goodyear. | Government | — | 0 | 1 |
| Official Meta Fact Sheet Meta · Cited by Epoch AI for Meta Jeffersonville. | Company | — | 0 | 1 |
| Turner Construction contractor presenting their involvement in the project. turnerconstruction.com · Cited by Epoch AI for Meta Jeffersonville. | News | — | 0 | 1 |
| Air Quality Permit for initial buildout Document mirror (Google Drive) · Cited by Epoch AI for Meta Jeffersonville. | Research | — | 0 | 1 |
| Hunt Midwest Business Center press release linking data center with Google huntmidwest.com · Cited by Epoch AI for Google Kansas City East. | News | — | 0 | 1 |
| DCD article on the site DCD · Cited by Epoch AI for Google Kansas City East. | News | — | 0 | 1 |
| City of New Albany Project Updates newalbanyohio.org · Cited by Epoch AI for AWS New Albany. | News | — | 0 | 1 |
| New Albany Community Development Report - Dec. 2024 newalbanyohio.org · Cited by Epoch AI for AWS New Albany. | News | — | 0 | 1 |
| New Albany Community Development Report - Aug. 2025 newalbanyohio.org · Cited by Epoch AI for AWS New Albany. | News | — | 0 | 1 |
| Article reporting first signing of the project wosu.org · Cited by Epoch AI for AWS New Albany. | News | — | 0 | 1 |
| Army corps land use application with a useful construction plan diagram, split across 7 phases upload.wikimedia.org · Cited by Epoch AI for Google Lincoln. | News | — | 0 | 1 |
| DCD article on the start of site construction DCD · Cited by Epoch AI for Google Lincoln. | News | — | 0 | 1 |
| Rezoning approval, stating 75 ft building height lnklan.granicus.com · Cited by Epoch AI for Google Lincoln. | News | — | 0 | 1 |
| Permit confirming this is a data center and the internal square footage static1.squarespace.com · Cited by Epoch AI for Google The Dalles. | News | — | 0 | 1 |
| Richmond 3 factsheet q.com · Cited by Epoch AI for QTS Richmond 3. | News | — | 0 | 1 |
| Meta Introduction to the Montgomery Project Meta · Cited by Epoch AI for Meta Montgomery. | Company | — | 0 | 1 |
| Meta expansion announcement Meta · Cited by Epoch AI for Meta Montgomery. | Company | — | 0 | 1 |
| Contractor announcement henselphelps.com · Cited by Epoch AI for Meta Montgomery. | News | — | 0 | 1 |
| Official Pamphlet from Meta Meta · Cited by Epoch AI for Meta Kuna. | Company | — | 0 | 1 |
| Application for Power Purchase Agreement, Pleasant Valley Solar 1 puc.idaho.gov · Cited by Epoch AI for Meta Kuna. | Government | — | 0 | 1 |
| Application for Power Purchase Agreement, Pleasant Valley Solar 2 lf-puc.idaho.gov · Cited by Epoch AI for Meta Kuna. | Government | — | 0 | 1 |
| Approval to move start date of Solar 2 to May 31, 2026 puc.idaho.gov · Cited by Epoch AI for Meta Kuna. | Government | — | 0 | 1 |
| Notice of Application for 3rd PPA (Blacks Creek Energy Center) puc.idaho.gov · Cited by Epoch AI for Meta Kuna. | Government | — | 0 | 1 |
| Idaho Statesman: Peak construction reached in March 2025 idahostatesman.com · Cited by Epoch AI for Meta Kuna. | News | — | 0 | 1 |
| Idaho Statesman: Expected water usage reported in 2022 idahostatesman.com · Cited by Epoch AI for Meta Kuna. | News | — | 0 | 1 |
| JE Dunn project page jedunn.com · Cited by Epoch AI for Meta Temple. | News | — | 0 | 1 |
| TDLR filing Texas Dept. of Licensing & Regulation · Cited by Epoch AI for Meta Temple. | Regulatory filing | — | 0 | 1 |
| TDLR filing Texas Dept. of Licensing & Regulation · Cited by Epoch AI for Meta Temple. | Regulatory filing | — | 0 | 1 |
| Meta Introduction to the Cheyenne Project Meta · Cited by Epoch AI for Meta Cheyenne. | Company | — | 0 | 1 |
| Fortis Construction announcement fortisconstruction.com · Cited by Epoch AI for Meta Cheyenne. | News | — | 0 | 1 |
| Press announcement suggesting a 2027 operational date cheyenneleads.org · Cited by Epoch AI for Meta Cheyenne. | News | — | 0 | 1 |
| Air Construction Permit Document mirror (Google Drive) · Cited by Epoch AI for Amazon Ridgeland. | Research | — | 0 | 1 |
| Permit review document Document mirror (Google Drive) · Cited by Epoch AI for Amazon Ridgeland. | Research | — | 0 | 1 |
| Announcement of expansion completing in 2026 plateauexcavation.com · Cited by Epoch AI for Meta Huntsville. | News | — | 0 | 1 |
| TVA solar installation announcements prnewswire.com · Cited by Epoch AI for Meta Huntsville. | News | — | 0 | 1 |
| Galaxy Q3 financial results with power capacity timeline investor.galaxy.com · Cited by Epoch AI for Coreweave Helios. | News | — | 0 | 1 |
| Permit review with details on backup generators and power capacity records.tceq.texas.gov · Cited by Epoch AI for Coreweave Helios. | Government | — | 0 | 1 |
| 3D renderings of Helios Building 1 on Galaxy's website, showing generators and chillers galaxy.com · Cited by Epoch AI for Coreweave Helios. | News | — | 0 | 1 |
| TDLR record with Building 1 construction costs and end date Texas Dept. of Licensing & Regulation · Cited by Epoch AI for Coreweave Helios. | Regulatory filing | — | 0 | 1 |
| DCD Article on site expansion DCD · Cited by Epoch AI for Microsoft Project Osmium. | News | — | 0 | 1 |
| Microsoft article on data centers in Iowa used by OpenAI Microsoft · Cited by Epoch AI for Microsoft Project Osmium. | Company | — | 0 | 1 |
| Expansion announcement by Meta facebook.com · Cited by Epoch AI for Meta Eagle Mountain. | News | — | 0 | 1 |
| Report on Williams Company gas-fired plant under construction adjacent to data cente ukozvhzgrcnkcatjqfoo.supabase.co · Cited by Epoch AI for Meta Eagle Mountain. | News | — | 0 | 1 |
| Site Map and Permit ecode360.com · Cited by Epoch AI for Google Midlothian. | News | — | 0 | 1 |
| City Council Presentation archive-stream.granicus.com · Cited by Epoch AI for Google Midlothian. | News | — | 0 | 1 |
| Air quality permit application listing emergency generators and a small "R&D" fuel cell plant ndep-onbase.nv.gov · Cited by Epoch AI for Google Storey County. | Government | — | 0 | 1 |
| Aterio aterio.io · Cited by Epoch AI for Google Storey County. | News | — | 0 | 1 |
| Google data center page datacenters.google · Cited by Epoch AI for Google Storey County. | Company | — | 0 | 1 |
| DCD article discussing the announcement of this site DCD · Cited by Epoch AI for Google Lancaster. | News | — | 0 | 1 |
| QTS Hillsboro 2 data center announcement q.com · Cited by Epoch AI for Meta-QTS Hillsboro 2. | News | — | 0 | 1 |
| QTS and Meta sign an agreement with PGE for a 120MWac solar installation q.com · Cited by Epoch AI for Meta-QTS Hillsboro 2. | News | — | 0 | 1 |
| Google Investing $1B To Improve Northern Virginia Data Centers (via Aterio) bisnow.com · Cited by Epoch AI for Google Arcola. | News | — | 0 | 1 |
| Media coverage confirming location, project name, investment size, and some timing mysanantonio.com · Cited by Epoch AI for Google Red Oak. | News | — | 0 | 1 |
| Draft basis of air permit with details of cooling towers Document mirror (Google Drive) · Cited by Epoch AI for Google Papillion. | Research | — | 0 | 1 |
| Meta fact sheet Meta · Cited by Epoch AI for Meta Gallatin. | Company | — | 0 | 1 |
| Campus extension announcement gallatingetsit.com · Cited by Epoch AI for Meta Gallatin. | News | — | 0 | 1 |
| Meta fact sheet Meta · Cited by Epoch AI for Meta Los Lunas. | Company | — | 0 | 1 |
| Air quality permit for expansion Document mirror (Google Drive) · Cited by Epoch AI for Meta Los Lunas. | Research | — | 0 | 1 |
| Construction contractor page for the site fortisconstruction.com · Cited by Epoch AI for Meta Los Lunas. | News | — | 0 | 1 |
| Applied Digital Announces 250MW AI Data Center Lease With CoreWeave ir.applieddigital.com · Cited by Epoch AI for CoreWeave Ellendale ND. | News | — | 0 | 1 |
| SEC 8k Filing with Applied Digital ir.applieddigital.com · Cited by Epoch AI for CoreWeave Ellendale ND. | News | — | 0 | 1 |
| Applied Digital Delivers Second Building at Polaris Forge 1 ir.applieddigital.com · Cited by Epoch AI for CoreWeave Ellendale ND. | News | — | 0 | 1 |
| Meta Sarpy info sheet (PDF) Meta · Cited by Epoch AI for Meta Sarpy. | Company | — | 0 | 1 |
| Chirisa secures $200 million loan to fit out VA Data center for CoreWeave DCD · Cited by Epoch AI for CoreWeave Chester VA. | News | — | 0 | 1 |
| Blue Owl-led JV secures $750m to build out data centers for CoreWeave DCD · Cited by Epoch AI for CoreWeave Chester VA. | News | — | 0 | 1 |
| Chirisa offers former Capital One data center in Virginia to hyperscalers DCD · Cited by Epoch AI for CoreWeave Chester VA. | News | — | 0 | 1 |
| Talen SEC filing detailing the $650M sale of the Cumulus data center campus to AWS U.S. SEC · Cited by Epoch AI for AWS Berwick. | Regulatory filing | — | 0 | 1 |
| Pennsylvania PUC filing describing the planned 16-building AWS data center development puc.pa.gov · Cited by Epoch AI for AWS Berwick. | Government | — | 0 | 1 |
| SRBC filing covering AWS campus expansion and water-use plans srbc.gov · Cited by Epoch AI for AWS Berwick. | Government | — | 0 | 1 |
| Core Scientific - Q1 2026 Fiscal Earnings Call investors.corescientific.com · Cited by Epoch AI for CoreWeave Marble NC. | News | — | 0 | 1 |
| Core Scientific - Official Marble, NC Datacenter page corescientific.com · Cited by Epoch AI for CoreWeave Marble NC. | News | — | 0 | 1 |
| Core Scientific - Q1 2025 Earnings Presentation investors.corescientific.com · Cited by Epoch AI for CoreWeave Marble NC. | News | — | 0 | 1 |
| Meta Introduction to the Aiken Project Meta · Cited by Epoch AI for Meta Aiken. | Company | — | 0 | 1 |
| DPR Construction project page dpr.com · Cited by Epoch AI for Meta Aiken. | News | — | 0 | 1 |
| Terawulf press release with details of Core42 lease for Buildings 1-2 investors.terawulf.com · Cited by Epoch AI for Core42 Lake Mariner. | News | — | 0 | 1 |
| TDLR for SAT40 (Building 2) Texas Dept. of Licensing & Regulation · Cited by Epoch AI for Microsoft SAT40. | Regulatory filing | — | 0 | 1 |
| TDLR for a set of three long buildings, which includes the first building we believe is for AI (Building 1) Texas Dept. of Licensing & Regulation · Cited by Epoch AI for Microsoft SAT40. | Regulatory filing | — | 0 | 1 |
| Official website for NVA02, showcasing their project. stackinfra.com · Cited by Epoch AI for STACK Infrastructure NVA02. | News | — | 0 | 1 |
| Most recent official schematic of the NVA02 campus. stackinfra.com · Cited by Epoch AI for STACK Infrastructure NVA02. | News | — | 0 | 1 |
| Air quality permit from the state of Virginia. deq.virginia.gov · Cited by Epoch AI for STACK Infrastructure NVA02. | Government | — | 0 | 1 |
| Nebius: up to 300 MW capacity at new New Jersey data center nebius.com · Cited by Epoch AI for Microsoft-Nebius New Jersey. | News | — | 0 | 1 |
| DataOne and Nebius partner for 300 MW AI data center (Data Centre Magazine) datacentremagazine.com · Cited by Epoch AI for Microsoft-Nebius New Jersey. | News | — | 0 | 1 |
| Microsoft secures 100,000 NVIDIA GB300 via Nebius deal (Tom's Hardware) tomshardware.com · Cited by Epoch AI for Microsoft-Nebius New Jersey. | News | — | 0 | 1 |
| DataOne CEO on first 50 MW delivery to Nebius (LinkedIn) linkedin.com · Cited by Epoch AI for Microsoft-Nebius New Jersey. | Company | — | 0 | 1 |
| Large data center nears completion in Vineland (Cape May County Herald) capemaycountyherald.com · Cited by Epoch AI for Microsoft-Nebius New Jersey. | News | — | 0 | 1 |
| SemiAnalysis: Stop Saying Half of 2026 US Datacenter Capacity Is Canceled SemiAnalysis · Cited by Epoch AI for Microsoft-Nebius New Jersey. | News | — | 0 | 1 |
| Official page for the data center. streamdatacenters.com · Cited by Epoch AI for Stream Phoenix. | News | — | 0 | 1 |
| Official pre-construction planning document. streamdatacenters.com · Cited by Epoch AI for Stream Phoenix. | News | — | 0 | 1 |
| Phase 1 TDLR Texas Dept. of Licensing & Regulation · Cited by Epoch AI for Microsoft SAT14. | Regulatory filing | — | 0 | 1 |
| Phase 2 TDLR Texas Dept. of Licensing & Regulation · Cited by Epoch AI for Microsoft SAT14. | Regulatory filing | — | 0 | 1 |
| Phase 3 TDLR Texas Dept. of Licensing & Regulation · Cited by Epoch AI for Microsoft SAT14. | Regulatory filing | — | 0 | 1 |
| Phase 4 TDLR Texas Dept. of Licensing & Regulation · Cited by Epoch AI for Microsoft SAT14. | Regulatory filing | — | 0 | 1 |
| Construction Permitting for TX11 Texas Dept. of Licensing & Regulation · Cited by Epoch AI for Vantage TX1. | Regulatory filing | — | 0 | 1 |
| Construction Permitting for TX12 Texas Dept. of Licensing & Regulation · Cited by Epoch AI for Vantage TX1. | Regulatory filing | — | 0 | 1 |
| Air quality permitting that references TX13 Document mirror (Google Drive) · Cited by Epoch AI for Vantage TX1. | Research | — | 0 | 1 |
| Core Scientific page corescientific.com · Cited by Epoch AI for CoreWeave Dalton 1 & 2. | News | — | 0 | 1 |
| SEC filing with power utility information investors.corescientific.com · Cited by Epoch AI for CoreWeave Dalton 1 & 2. | News | — | 0 | 1 |
| DCD article DCD · Cited by Epoch AI for CoreWeave Dalton 1 & 2. | News | — | 0 | 1 |
| Develop Fulton bond fact sheet: X Corp Generative AI Equipment Project (Jan 23, 2024) developfultoncounty.com · Cited by Epoch AI for xAI QTS Atlanta. | News | — | 0 | 1 |
| Business Insider: Elon Musk's new Atlanta data center for xAI has $700 million in AI equipment businessinsider.com · Cited by Epoch AI for xAI QTS Atlanta. | News | — | 0 | 1 |
| Fortune: Elon Musk's xAI is sharing X's equipment at its Atlanta data center (Jan 24, 2025) fortune.com · Cited by Epoch AI for xAI QTS Atlanta. | News | — | 0 | 1 |
| Cipher signs 168 MW AI hosting deal with Fluidstack, Google backs it (Sep 2025) globenewswire.com · Cited by Epoch AI for Anthropic Barber Lake. | News | — | 0 | 1 |
| Cipher adds 56 MW gross to reach 300 MW at Barber Lake (Nov 2025) globenewswire.com · Cited by Epoch AI for Anthropic Barber Lake. | News | — | 0 | 1 |
| Cipher 8-K exhibit: 207 MW total critical IT load (SEC, Nov 2025) U.S. SEC · Cited by Epoch AI for Anthropic Barber Lake. | Regulatory filing | — | 0 | 1 |
| Anthropic to expand use of Google Cloud TPUs (Oct 2025) googlecloudpresscorner.com · Cited by Epoch AI for Anthropic Barber Lake. | News | — | 0 | 1 |
| DCD: Cipher secures Fluidstack as customer, Google as investor DCD · Cited by Epoch AI for Anthropic Barber Lake. | News | — | 0 | 1 |
| Air quality permit listing 60 x 3 MW plus 60 x 3.1MW backup generators Document mirror (Google Drive) · Cited by Epoch AI for Anthropic Barber Lake. | Research | — | 0 | 1 |
| CoreWeave announces plans to spend $6 billion on Lancaster data centers investors.coreweave.com · Cited by Epoch AI for CoreWeave Lancaster Greenfield site. | Company | — | 0 | 1 |
| Machine Investment Group purchases two former printing press sites in Lancaster, Pennsylvania DCD · Cited by Epoch AI for CoreWeave Lancaster Greenfield site. | News | — | 0 | 1 |
| Core Scientific ground breaking announcement investors.corescientific.com · Cited by Epoch AI for CoreWeave Muskogee OK. | News | — | 0 | 1 |
| Port Muskogee ground breaking announcement portmuskogee.com · Cited by Epoch AI for CoreWeave Muskogee OK. | News | — | 0 | 1 |
| Air quality permit application applications.deq.ok.gov · Cited by Epoch AI for CoreWeave Muskogee OK. | Government | — | 0 | 1 |
| Bloomberg reporting that Oracle and OpenAI pulled out of expanding to these buildings, NVIDIA and Meta might replace them Bloomberg · Cited by Epoch AI for Crusoe Abilene Expansion. | News | — | 0 | 1 |
| Air Permit Application for the buildings, featuring blueprints on p.391 tceq.texas.gov · Cited by Epoch AI for Crusoe Abilene Expansion. | Government | — | 0 | 1 |
| Aterio aterio.io · Cited by Epoch AI for Crusoe Abilene Expansion. | News | — | 0 | 1 |
| Partnership Announcement with Microsoft X (Twitter) · Cited by Epoch AI for Crusoe Abilene Expansion. | Company | — | 0 | 1 |
| Amended tax abatement agreement, with updated blueprints on p.46 co.armstrong.tx.us · Cited by Epoch AI for Goodnight. | Government | — | 0 | 1 |
| Original tax abatement agreement, with original blueprints and specs on the last page Document mirror (Google Drive) · Cited by Epoch AI for Goodnight. | Research | — | 0 | 1 |
| TABS database, with "Llano" data centers in the city of Claude Texas Dept. of Licensing & Regulation · Cited by Epoch AI for Goodnight. | Regulatory filing | — | 0 | 1 |
| Press release reports Google investing in a new data center in Armstrong County Reuters · Cited by Epoch AI for Goodnight. | News | — | 0 | 1 |
| Clean Air Act Initial Prevention of Significant Deterioration permit application. Document mirror (Google Drive) · Cited by Epoch AI for Goodnight. | Research | — | 0 | 1 |
| Permit application govonlinesaas.com · Cited by Epoch AI for Google Cedar Rapids. | News | — | 0 | 1 |
| Google's plans for wetlands in Fort Wayne thelocalfw.com · Cited by Epoch AI for Google Fort Wayne. | News | — | 0 | 1 |
| Data center's diesel generators thelocalfw.com · Cited by Epoch AI for Google Fort Wayne. | News | — | 0 | 1 |
| Project's history and tax abatement thelocalfw.com · Cited by Epoch AI for Google Fort Wayne. | News | — | 0 | 1 |
| City Council approval citycouncildocuments.acfw.net · Cited by Epoch AI for Google Fort Wayne. | News | — | 0 | 1 |
| Meta letter to Middleton Township Document mirror (Google Drive) · Cited by Epoch AI for Meta Bowling Green. | Research | — | 0 | 1 |
| Construction notice for new transmission lines to data center substation Document mirror (Google Drive) · Cited by Epoch AI for Meta Bowling Green. | Research | — | 0 | 1 |
| Ohio Power Siting Board announcement archive.ph · Cited by Epoch AI for Meta Bowling Green. | News | — | 0 | 1 |
| Apollo Power Generation Project Letter of Notice Appendix A, with a project timeline Document mirror (Google Drive) · Cited by Epoch AI for Meta Bowling Green. | Research | — | 0 | 1 |
| Data center profile by Meta Meta · Cited by Epoch AI for Meta Hyperion. | Company | — | 0 | 1 |
| Entergy's application for generation and transmission resources Document mirror (Google Drive) · Cited by Epoch AI for Meta Hyperion. | Research | — | 0 | 1 |
| MISO update with 1.8 GW substation plan Document mirror (Google Drive) · Cited by Epoch AI for Meta Hyperion. | Research | — | 0 | 1 |
| S&P Global ratings research with 2.064 GW campus details spglobal.com · Cited by Epoch AI for Meta Hyperion. | News | — | 0 | 1 |
| Announcement of 5 new Stargate sites mentioning Lordstown DCD · Cited by Epoch AI for OpenAI Stargate Lordstown. | News | — | 0 | 1 |
| Water Quality Permitting stating that “manufacturing and assembly” is the main purpose of the construction Document mirror (Google Drive) · Cited by Epoch AI for OpenAI Stargate Lordstown. | Research | — | 0 | 1 |
| Stormwater Permitting Document mirror (Google Drive) · Cited by Epoch AI for OpenAI Stargate Lordstown. | Research | — | 0 | 1 |
| Related Digital website for this site related-digital.com · Cited by Epoch AI for OpenAI Stargate Michigan. | News | — | 0 | 1 |
| Air Permitting, calls the site Project Mitten, includes site map Document mirror (Google Drive) · Cited by Epoch AI for OpenAI Stargate Michigan. | Research | — | 0 | 1 |
| DTE Electric’s contract approval mi-psc.my.site.com · Cited by Epoch AI for OpenAI Stargate Michigan. | News | — | 0 | 1 |
| Website with more details for locals about the site thesalinebarn.com · Cited by Epoch AI for OpenAI Stargate Michigan. | News | — | 0 | 1 |
| Data Center Dynamics article on the site DCD · Cited by Epoch AI for OpenAI Stargate Milam. | News | — | 0 | 1 |
| SB Energy article, source for 1.2 GW capacity sbenergy.com · Cited by Epoch AI for OpenAI Stargate Milam. | News | — | 0 | 1 |
| TDLR page for the first building of the site, indicating construction completion date Texas Dept. of Licensing & Regulation · Cited by Epoch AI for OpenAI Stargate Milam. | Regulatory filing | — | 0 | 1 |
| Project Jupiter Website projectjupitertogether.com · Cited by Epoch AI for OpenAI Stargate New Mexico. | News | — | 0 | 1 |
| Stormwater Permitting Document mirror (Google Drive) · Cited by Epoch AI for OpenAI Stargate New Mexico. | Research | — | 0 | 1 |
| Oracle, BorderPlex and Bloom Energy to power Project Jupiter with fuel cell technology (Apr 27, 2026) oracle.com · Cited by Epoch AI for OpenAI Stargate New Mexico. | Company | — | 0 | 1 |
| Vantage data center page with power capacity, number of buildings, and first building timeline vantage-dc.com · Cited by Epoch AI for OpenAI Stargate Shackelford. | News | — | 0 | 1 |
| OpenAI Stargate expansion announcement mentioning Shackelford site OpenAI · Cited by Epoch AI for OpenAI Stargate Shackelford. | Company | — | 0 | 1 |
| Vantage LinkedIn post connecting the data center to OpenAI Stargate web.archive.org · Cited by Epoch AI for OpenAI Stargate Shackelford. | News | — | 0 | 1 |
| TDLR filing for first building (other buildings are also on TDLR) Texas Dept. of Licensing & Regulation · Cited by Epoch AI for OpenAI Stargate Shackelford. | Regulatory filing | — | 0 | 1 |
| Data center page on Vantage website vantage-dc.com · Cited by Epoch AI for OpenAI Stargate Wisconsin. | News | — | 0 | 1 |
| Environmental Analysis Summary Document mirror (Google Drive) · Cited by Epoch AI for OpenAI Stargate Wisconsin. | Research | — | 0 | 1 |
| Article by The Gazette thegazette.com · Cited by Epoch AI for QTS Cedar Rapids. | News | — | 0 | 1 |
| Article by Corridor Business Journal corridorbusiness.com · Cited by Epoch AI for QTS Cedar Rapids. | News | — | 0 | 1 |
| Post by GLD Commercial gldcommercial.com · Cited by Epoch AI for QTS Cedar Rapids. | News | — | 0 | 1 |
| QTS Eagle Mountain website q.com · Cited by Epoch AI for QTS Eagle Mountain. | News | — | 0 | 1 |
| DEQ Approval listing emergency generators daqpermitting.utah.gov · Cited by Epoch AI for QTS Eagle Mountain. | Government | — | 0 | 1 |
| Wikimedia Commons — geotagged photographs Wikimedia Commons contributors · Matched by camera location near the facility plus a data-center keyword or facility name in the file title. Each image keeps its own author and license. | Community | Per image (CC BY / CC BY-SA / public domain) | 0 | 0 |
| ERCOT Update — House Committee on State Affairs (Large Load Interconnection Requests) ERCOT · 2026-04-09 | Regulatory filing | — | 0 | 0 |