Cloud Storage Corp
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityCloud Storage Corp
- →substationUnnamed substation[1]Proximity onlyUnverifiedNearest mapped substation, 0.71 km away. Proximity does not establish that it serves the site.
- →transmission115 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.96 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 38.87213, -99.30019
- Address
- County
- Ellis County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Western Coop Electric Assn INC.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Kansas statewide average, July 2026.
- State avg. commercial price
Kansas statewide average, July 2026.
- Generation within 50 km
7 EIA-reported plants within 50 km.
- Generation queued in county
2 active generation interconnection requests in Ellis County: Solar 175 MW, Storage 20 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 115 kV line | Transmission line | 0.96 km | 115 kV | [1] |
| Goodman Energy Center · Midwest Energy Inc - (KS) | Power plant (Natural Gas) | 8.4 km | 101 MW | [6] |
| Fort Hays State University Wind Farm · Fort Hays State University | Power plant (Wind) | 9.1 km | 4 MW | [6] |
| Buckeye Wind Energy Center · Invenergy Services LLC | Power plant (Wind) | 17.7 km | 201 MW | [6] |
| La Crosse · City of La Crosse - (KS) | Power plant (Petroleum) | 37.9 km | 8 MW | [6] |
| Russell Downtown · City of Russell - (KS) | Power plant (Natural Gas) | 38.4 km | 14 MW | [6] |
| Russell Energy Center · City of Russell - (KS) | Power plant (Natural Gas) | 40 km | 12 MW | [6] |
| Cedar Bluff Wind, LLC · Cedar Bluff Wind, LLC | Power plant (Wind) | 42 km | 199 MW | [6] |
| Unnamed substation | Substation | 0.71 km | — | [1] |
| Unnamed substation | Substation | 0.94 km | — | [1] |
| Unnamed substation | Substation | 1.03 km | 115 kV | [1] |
| Midwest Energy substation · Midwest Energy | Substation | 1.42 km | — | [1] |
| Unnamed substation | Substation | 1.79 km | — | [1] |
| Unnamed substation | Substation | 1.81 km | — | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| GEN-2022-075 at Tap on the Spearville - Post Rock 345kV lineSPP GEN-2022-075 | Solar | In study · proposed 2027-11 | 175 MW | [4] |
| GEN-2016-160 at Post Rock 230kVSPP GEN-2016-160 | Storage | IA signed · proposed 2026-12 | 20 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
- $12M[7]Comparable-assessment model · Sep 29, 2026$1037/sq ft × 11,578 sq ft (n=8 comps)
- Annual property tax
- Not yet sourced
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
16| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Cloud Storage Corpway/581234765 name=Cloud Storage Corp | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Website | https://www.cloudstoragecorp.com/ | [1] | Likely | 2026-09-27 | Shown |
| Address | 1305 Canterbury Drive, Hays, KS 67601 | [1] | Likely | 2026-09-27 | Shown |
| Utility | Midwest Energy INCterritory 12524: MIDWEST ENERGY INC (COOPERATIVE, MIDWEST ENERGY INC) | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | SPPSOUTHWEST POWER POOL | [3] derived | Likely | — | Shown |
| Balancing authority | SWPP | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substationway/1485091512 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.7 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 115 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 195 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 8.52¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 12.04¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 538 MW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 11,600 sq ft | [1] derived | Likely | 2026-09-27 | Shown |
| Model estimate of property value | $12M | [7] estimated | Speculative | 2026-09-29 | Shown |