Csquare SFO2
Part of Centersquare — Santa Clara, CA campus
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityCsquare SFO2
- →substationUnnamed substation (60 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 1.14 km away. Proximity does not establish that it serves the site.
- →transmission230 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.42 km away). Not confirmed as the supply path.
- →utilitySilicon Valley Power (City of Santa Clara)[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 37.39873, -121.98135
- Address
- County
- Santa Clara County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Wapa-- Western Area Power Administration.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
California statewide average, July 2026.
- State avg. commercial price
California statewide average, July 2026.
- Generation within 50 km
80 EIA-reported plants within 50 km.
- Generation queued in county
6 active generation interconnection requests in Santa Clara County: Storage 823 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 60 kV line | Transmission line | 0.97 km | 60 kV | [1] |
| 115 kV line | Transmission line | 1.16 km | 115 kV | [1] |
| 230 kV line | Transmission line | 1.42 km | 230 kV | [1] |
| Donald Von Raesfeld Power Plant · City of Santa Clara - (CA) | Power plant (Natural Gas) | 3.6 km | 148 MW | [6] |
| Los Esteros Critical Energy Center · Los Esteros Critical Energy Facility LLC | Power plant (Natural Gas) | 5.3 km | 300 MW | [6] |
| Sc 1 Data Center, Phase 2 · Xeres Ventures LLC | Power plant (Petroleum) | 5.3 km | 100 MW | [6] |
| Metcalf Energy Center · Calpine Corp - Metcalf Energy Center | Power plant (Natural Gas) | 28.7 km | 557 MW | [6] |
| Russell City Energy Center · Russell City Energy Company LLC | Power plant (Natural Gas) | 29.5 km | 605 MW | [6] |
| Golden Hills Wind · Golden Hills Wind, LLC | Power plant (Wind) | 46.1 km | 86 MW | [6] |
| Summit Winds · Greenbacker Renewable Energy Corporation | Power plant (Wind) | 47.8 km | 56 MW | [6] |
| Vasco Winds · Vasco Winds, LLC | Power plant (Wind) | 49.4 km | 78 MW | [6] |
| Unnamed substation | Substation | 1.14 km | 60 kV | [1] |
| Northern Receiving Station · Silicon Valley Power | Substation | 1.38 km | 230 kV | [1] |
| Unnamed substation | Substation | 1.46 km | 60 kV | [1] |
| Unnamed substation | Substation | 1.57 km | — | [1] |
| Unnamed substation | Substation | 1.82 km | 60 kV | [1] |
| Unnamed substation | Substation | 1.91 km | — | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| JEWELFLOWER STORAGECAISO 1553 | Storage | IA signed · proposed 2029-03 | 350 MW | [4] |
| TANAGER STORAGECAISO 1550 | Storage | IA signed · proposed 2027-12 | 200 MW | [4] |
| LOS ESTEROS CRITICAL ENERGY FACILITY EXPANSIONCAISO 378 | Storage | IA signed · proposed 2023-09 | 120 MW | [4] |
| TOKAY STORAGECAISO 1866 | Storage | IA signed · proposed 2030-03 | 100 MW | [4] |
| KIFER BESS 1CAISO 1918 | Storage | In study · proposed 2025-12 | 50 MW | [4] |
| MILPA POWER BANKCAISO 1457 | Storage | In study · proposed 2025-04 | 3 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
1- Csquare SFO2Operating · 146,400 sq ft footprint
All claims (provenance audit)
16| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Csquare SFO2way/54119667 name=Csquare SFO2 | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 4700 Old Ironsides Drive, Santa Clara, CA 95054 | [1] | Likely | 2026-09-27 | Shown |
| Operator | Centersquareoperator=Csquare | [1] | Likely | 2026-09-27 | Shown |
| Utility | Silicon Valley Power (City of Santa Clara)territory 16655: CITY OF SANTA CLARA - (CA) (MUNICIPAL, SILICON VALLEY POWER) | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | CAISOCALIFORNIA INDEPENDENT SYSTEM OPERATOR | [3] derived | Likely | — | Shown |
| Balancing authority | CISO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substation (60 kV)way/1073230921 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1.1 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 823 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 25.11¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 30.56¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 2.26 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 115,900 sq ft | [1] derived | Likely | 2026-09-27 | Shown |