Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityCyberNAP Glen Burnie
- →substationLipins Corner Substation (115 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 1.81 km away. Proximity does not establish that it serves the site.
- →transmissionBrandon Shores & Wagner to Waugh Chapel (230 kV)[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.53 km away). Not confirmed as the supply path.
- →utilityNot identifiedUnknownUnverified
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
ApproximateLocation is approximate (approximate); the marker does not identify the exact site.
- Coordinates
- 39.14023, -76.60643
- County
- Anne Arundel County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Maryland statewide average, July 2026.
- State avg. commercial price
Maryland statewide average, July 2026.
- Generation within 50 km
124 EIA-reported plants within 50 km.
- Generation queued in county
6 active generation interconnection requests in Anne Arundel County: Storage 860 MW, Solar 75 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Brandon Shores & Wagner to Waugh Chapel · Baltimore Gas and Electric | Transmission line | 0.53 km | 230 kV | [1] |
| 115 kV line · Baltimore Gas and Electric | Transmission line | 1.76 km | 115 kV | [1] |
| Brandon Shores · Brandon Shores LLC | Power plant (Coal) | 7.6 km | 1.27 GW | [6] |
| Herbert A Wagner · H.A. Wagner LLC | Power plant (Petroleum) | 8.1 km | 841 MW | [6] |
| Wheelabrator Baltimore Refuse · Wheelabrator Environmental Systems | Power plant (Biomass) | 14.1 km | 61 MW | [6] |
| Philadelphia · Constellation Power Source Generation, LLC | Power plant (Petroleum) | 18 km | 60 MW | [6] |
| Umcp Chp Plant · Trigen-Cinergy Solutions College Park | Power plant (Natural Gas) | 33.2 km | 21 MW | [6] |
| Central Utility Plant At White Oak · GSA Metropolitan Service Center | Power plant (Natural Gas) | 34.3 km | 54 MW | [6] |
| Nih Cogeneration Facility · National Institutes of Health | Power plant (Natural Gas) | 44.9 km | 28 MW | [6] |
| Perryman · Constellation Power Source Generation, LLC | Power plant (Natural Gas) | 47.2 km | 404 MW | [6] |
| Lipins Corner Substation · Baltimore Gas and Electric | Substation | 1.81 km | 115 kV | [1] |
| Glen Burnie Substation | Substation | 2.19 km | — | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Chapel Energy Storage FacilityPJM AG1-104 | Storage | In study · proposed 2024-06 | 300 MW | [4] |
| Brandon Shores 230 kVPJM AG2-207 | Storage | In study · proposed 2023-03 | 275 MW | [4] |
| Brandon Shores 230 kVPJM AG2-319 | Storage | In study · proposed 2025-12 | 150 MW | [4] |
| Wagner 115 kVPJM AG2-225 | Storage | In study · proposed 2022-12 | 135 MW | [4] |
| Waugh Chapel 115 kVPJM AG2-617 | Solar | In study · proposed 2023-12 | 55 MW | [4] |
| Columbia-Geisinger Tap #1 69 kVPJM AF2-434 | Solar | In study · proposed 2022-06 | 20 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
12| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | CyberNAP Glen Burnierelation/16282459 name=CyberNAP Glen Burnie | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Operator | AiNEToperator=AiNET | [1] | Likely | 2026-09-27 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [2] derived | Likely | — | Shown |
| Balancing authority | PJM | [3] derived | Likely | — | Shown |
| Nearest mapped substation | Lipins Corner Substation (115 kV)way/54571787 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1.8 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 935 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 16.21¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 17.51¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 3.01 GW | [6] derived | Confirmed | 202502 | Shown |