DC
/

CyberNAP Glen Burnie

OperatingUnclassifiedBuildingAnne Arundel County, Maryland
20% profile completeness
12 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Not identified · PJM
Substation: Lipins Corner Substation (115 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    CyberNAP Glen Burnie
  2. substation
    Lipins Corner Substation (115 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 1.81 km away. Proximity does not establish that it serves the site.
  3. transmission
    Brandon Shores & Wagner to Waugh Chapel (230 kV)[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.53 km away). Not confirmed as the supply path.
  4. utility
    Not identified
    UnknownUnverified
  5. ISO / RTO
    PJM[2]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Approximate

Location is approximate (approximate); the marker does not identify the exact site.

Coordinates
39.14023, -76.60643
County
Anne Arundel County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Not identified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Operator

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[2]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[3]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Lipins Corner Substation (115 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
1.8 km[1]Likelyderived
Highest-voltage line nearby
230 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
16.21¢/kWh[5]Confirmed

Maryland statewide average, July 2026.

State avg. commercial price
17.51¢/kWh[5]Confirmed

Maryland statewide average, July 2026.

Generation within 50 km
3.01 GW[6]Confirmedderived

124 EIA-reported plants within 50 km.

Generation queued in county
935 MW[4]Confirmedderived

6 active generation interconnection requests in Anne Arundel County: Storage 860 MW, Solar 75 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Brandon Shores & Wagner to Waugh Chapel · Baltimore Gas and ElectricTransmission line0.53 km230 kV[1]
115 kV line · Baltimore Gas and ElectricTransmission line1.76 km115 kV[1]
Brandon Shores · Brandon Shores LLCPower plant (Coal)7.6 km1.27 GW[6]
Herbert A Wagner · H.A. Wagner LLCPower plant (Petroleum)8.1 km841 MW[6]
Wheelabrator Baltimore Refuse · Wheelabrator Environmental SystemsPower plant (Biomass)14.1 km61 MW[6]
Philadelphia · Constellation Power Source Generation, LLCPower plant (Petroleum)18 km60 MW[6]
Umcp Chp Plant · Trigen-Cinergy Solutions College ParkPower plant (Natural Gas)33.2 km21 MW[6]
Central Utility Plant At White Oak · GSA Metropolitan Service CenterPower plant (Natural Gas)34.3 km54 MW[6]
Nih Cogeneration Facility · National Institutes of HealthPower plant (Natural Gas)44.9 km28 MW[6]
Perryman · Constellation Power Source Generation, LLCPower plant (Natural Gas)47.2 km404 MW[6]
Lipins Corner Substation · Baltimore Gas and ElectricSubstation1.81 km115 kV[1]
Glen Burnie SubstationSubstation2.19 km—[1]
Largest queued generation in this countyFuelQueue statusMWSource
Chapel Energy Storage FacilityPJM AG1-104StorageIn study · proposed 2024-06300 MW[4]
Brandon Shores 230 kVPJM AG2-207StorageIn study · proposed 2023-03275 MW[4]
Brandon Shores 230 kVPJM AG2-319StorageIn study · proposed 2025-12150 MW[4]
Wagner 115 kVPJM AG2-225StorageIn study · proposed 2022-12135 MW[4]
Waugh Chapel 115 kVPJM AG2-617SolarIn study · proposed 2023-1255 MW[4]
Columbia-Geisinger Tap #1 69 kVPJM AF2-434SolarIn study · proposed 2022-0620 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

12
FieldValueSourceConfidenceAs ofStatus
NameCyberNAP Glen Burnierelation/16282459 name=CyberNAP Glen Burnie[1] Likely2026-09-27Shown
StatusOperating[1] derivedUnverified2026-09-27Shown
OperatorAiNEToperator=AiNET[1] Likely2026-09-27Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[2] derivedLikely—Shown
Balancing authorityPJM[3] derivedLikely—Shown
Nearest mapped substationLipins Corner Substation (115 kV)way/54571787[1] derivedLikely2026-09-28Shown
Distance to substation1.8 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby230 kV[1] derivedLikely2026-09-28Shown
Generation queued in county935 MW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price16.21¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price17.51¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km3.01 GW[6] derivedConfirmed202502Shown