DRT LAX10
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityDRT LAX10 (LAX6)
- →substationUnnamed substation[1]Proximity onlyUnverifiedNearest mapped substation, 0.53 km away. Proximity does not establish that it serves the site.
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →utilityLos Angeles Department of Water & Power[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 34.04743, -118.25736
- County
- Los Angeles County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- State avg. industrial price
California statewide average, July 2026.
- State avg. commercial price
California statewide average, July 2026.
- Generation within 50 km
172 EIA-reported plants within 50 km.
- Generation queued in county
20 active generation interconnection requests in Los Angeles County: Storage 4,550 MW, Solar + storage 2,336 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Scattergood · Los Angeles Department of Water & Power | Power plant (Natural Gas) | 21.3 km | 778 MW | [6] |
| El Segundo Energy Center LLC · NRG Energy Services LLC | Power plant (Natural Gas) | 21.7 km | 510 MW | [6] |
| Valley (Ca) · Los Angeles Department of Water & Power | Power plant (Natural Gas) | 25.2 km | 563 MW | [6] |
| Walnut Creek Energy Park · Walnut Creek LLC | Power plant (Natural Gas) | 29.1 km | 501 MW | [6] |
| Harbor · Los Angeles Department of Water & Power | Power plant (Natural Gas) | 30.8 km | 428 MW | [6] |
| Aes Alamitos LLC · AES Alamitos LLC | Power plant (Natural Gas) | 34.2 km | 1.14 GW | [6] |
| Aes Alamitos Energy Center · AES Alamitos Energy, LLC | Power plant (Natural Gas) | 34.4 km | 603 MW | [6] |
| Haynes · Los Angeles Department of Water & Power | Power plant (Natural Gas) | 34.7 km | 1.6 GW | [6] |
| Unnamed substation | Substation | 0.53 km | — | [1] |
| Los Angeles Department of Water and Power substation · Los Angeles Department of Water and Power | Substation | 0.71 km | 34.5 kV | [1] |
| Unnamed substation | Substation | 0.73 km | — | [1] |
| Los Angeles Department of Water and Power substation · Los Angeles Department of Water and Power | Substation | 0.97 km | 34.5 kV | [1] |
| Los Angeles Department of Water and Power substation · Los Angeles Department of Water and Power | Substation | 1.01 km | 34.5 kV | [1] |
| Unnamed substation | Substation | 1.1 km | — | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| ANGELENO SOLAR FARMCAISO 1625 | Solar + storage | IA signed · proposed 2028-12 | 1.15 GW | [4] |
| ANTELOPE SOLAR 2CAISO 1208 | Solar + storage | IA signed · proposed 2025-11 | 650 MW | [4] |
| FLEETWOODCAISO 2111 | Storage | In study · proposed 2032-04 | 400 MW | [4] |
| GABRIEL STORAGECAISO 2113 | Storage | IA signed · proposed 2033-05 | 400 MW | [4] |
| SIMONCAISO 2115 | Storage | In study · proposed 2032-04 | 400 MW | [4] |
| MARICICAISO 2116 | Storage | IA signed · proposed 2031-02 | 400 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
14| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | DRT LAX10way/428021796 name=DRT LAX10 | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Utility | Los Angeles Department of Water & Powerterritory 11208: LOS ANGELES DEPARTMENT OF WATER & POWER (MUNICIPAL, GLENDALE WA | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | LDWP | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substationway/323131255 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.5 km | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 6.89 GW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 25.11¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 30.56¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 10.08 GW | [6] derived | Confirmed | 202502 | Shown |
| Floor area | 469,700 sq ft | [1] estimated | Unverified | 2026-09-27 | Shown |
| Building footprint | 67,100 sq ft | [1] derived | Likely | 2026-09-27 | Shown |
| Floors | 7building:levels=7 | [1] | Likely | 2026-09-27 | Shown |