DC
/

E-Foam

OperatingUnclassifiedBuildingWinter Garden, Orange County, Florida
20% profile completeness
13 claims from 5 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
8,400 sq ft[1]
Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Duke Energy · None (non-RTO region)
Substation: Unnamed substation (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    E-Foam
  2. substation
    Unnamed substation[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.33 km away. Proximity does not establish that it serves the site.
  3. transmission
    69 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (1.6 km away). Not confirmed as the supply path.
  4. utility
    Duke Energy[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    None (non-RTO region)[3]
    Service territoryLikely
    Balancing authority: FPC
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
28.57795, -81.56460
Address
550 Susan B. Britt Court, Winter Garden, FL 34787[1]Likely
County
Orange County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:
Duke Energy[2]Unverified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility
Duke Energy[2]Unverified

Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Reedy Creek Improvement Dist.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
None (non-RTO region)[3]Likelyderived

Outside all ISO/RTO footprints; balancing authority shown separately.

Balancing authority
FPC[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.3 km[1]Likelyderived
Highest-voltage line nearby
69 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
9.17¢/kWh[4]Confirmed

Florida statewide average, July 2026.

State avg. commercial price
11.37¢/kWh[4]Confirmed

Florida statewide average, July 2026.

Generation within 50 km
6.66 GW[5]Confirmedderived

19 EIA-reported plants within 50 km.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
69 kV lineTransmission line1.6 km69 kV[1]
Orlando Cogen LP · Florida Municipal Power AgencyPower plant (Natural Gas)21.2 km120 MW[5]
Cane Island · Kissimmee Utility AuthorityPower plant (Natural Gas)33.7 km679 MW[5]
Intercession City · Duke Energy Florida, LLCPower plant (Natural Gas)35.1 km940 MW[5]
Sanford · Florida Power & Light CoPower plant (Natural Gas)37.5 km2.35 GW[5]
Curtis H Stanton Energy Center · Stanton Clean Energy LLCPower plant (Natural Gas)40.1 km657 MW[5]
Stanton Energy Center · Orlando Utilities CommPower plant (Coal)40.2 km1.22 GW[5]
Debary Solar Power Plant · Duke Energy Florida, LLCPower plant (Solar)42.4 km75 MW[5]
Debary · Duke Energy Florida, LLCPower plant (Petroleum)42.7 km524 MW[5]
Unnamed substationSubstation0.33 km—[1]
Unnamed substationSubstation1.67 km69 kV[1]
Winter Garden Substation · Duke EnergySubstation2.86 km69 kV[1]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
8,400 sq ft[1]Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

13
FieldValueSourceConfidenceAs ofStatus
NameE-Foamway/958728802 name=E-Foam[1] Likely2026-09-27Shown
StatusOperating[1] derivedUnverified2026-09-27Shown
Address550 Susan B. Britt Court, Winter Garden, FL 34787[1] Likely2026-09-27Shown
UtilityDuke Energyterritory 6455: DUKE ENERGY FLORIDA, LLC (INVESTOR OWNED, DUKE ENERGY CORP)[2] derivedUnverified2022Shown
ISO / RTONone (non-RTO region)[3] derivedLikely—Shown
Balancing authorityFPC[2] derivedLikely—Shown
Nearest mapped substationUnnamed substationway/1502701277[1] derivedLikely2026-09-28Shown
Distance to substation0.3 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby69 kV[1] derivedLikely2026-09-28Shown
State avg. industrial price9.17¢/kWh[4] Confirmed2026-07Shown
State avg. commercial price11.37¢/kWh[4] Confirmed2026-07Shown
Generation within 50 km6.66 GW[5] derivedConfirmed202502Shown
Building footprint8,400 sq ft[1] derivedLikely2026-09-27Shown