Equinix SV5

OperatingColocationBuildingSan Jose, Santa Clara County, California

Part of Equinix — San Jose, CA campus

30% profile completeness
17 claims from 7 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
166,600 sq ft[1]
Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Pacific Gas and Electric · CAISO
Substation: Humminbird Substation (115 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Equinix SV5
  2. substation
    Humminbird Substation (115 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.35 km away. Proximity does not establish that it serves the site.
  3. transmission
    115 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.87 km away). Not confirmed as the supply path.
  4. utility
    Pacific Gas and Electric[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    CAISO[3]
    Service territoryLikely
    Balancing authority: CISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
37.24187, -121.78162
Address
9 Great Oaks Boulevard, San Jose, CA 95119[1]Likely
County
Santa Clara County
Photographs
Equinix San Jose Campus
Equinix San Jose Campus
Cristiano Tomás · CC BY-SA 4.0 · 2021-04-16 [7]
Geotagged ~75 m from this location; title/description mentions a data center or this facility's operator. May show a neighboring building.
Equinix San Jose Campus
Equinix San Jose Campus
Cristiano Tomás · CC BY-SA 4.0 · 2021-04-16 [7]
Geotagged ~107 m from this location; title/description mentions a data center or this facility's operator. May show a neighboring building.
Equinix San Jose Campus
Equinix San Jose Campus
Cristiano Tomás · CC BY-SA 4.0 · 2021-04-16 [7]
Geotagged ~107 m from this location; title/description mentions a data center or this facility's operator. May show a neighboring building.
Equinix San Jose Campus
Equinix San Jose Campus
Cristiano Tomás · CC BY-SA 4.0 · 2021-04-16 [7]
Geotagged ~108 m from this location; title/description mentions a data center or this facility's operator. May show a neighboring building.
Equinix San Jose Campus
Equinix San Jose Campus
Cristiano Tomás · CC BY-SA 4.0 · 2021-04-16 [7]
Geotagged ~139 m from this location; title/description mentions a data center or this facility's operator. May show a neighboring building.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Operator
Utility

Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Wapa-- Western Area Power Administration.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
CAISO[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
CISO[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Humminbird Substation (115 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.4 km[1]Likelyderived
Highest-voltage line nearby
115 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
25.11¢/kWh[5]Confirmed

California statewide average, July 2026.

State avg. commercial price
30.56¢/kWh[5]Confirmed

California statewide average, July 2026.

Generation within 50 km
3.6 GW[6]Confirmedderived

65 EIA-reported plants within 50 km.

Generation queued in county
823 MW[4]Confirmedderived

6 active generation interconnection requests in Santa Clara County: Storage 823 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
115 kV line · Pacific Gas and Electric CompanyTransmission line0.87 km115 kV[1]
Piercy - Metcalf 115 kV transmission line · Pacific Gas and Electric CompanyTransmission line1.86 km115 kV[1]
Metcalf Energy Center · Calpine Corp - Metcalf Energy CenterPower plant (Natural Gas)4 km557 MW[6]
Sc 1 Data Center, Phase 2 · Xeres Ventures LLCPower plant (Petroleum)19.6 km100 MW[6]
Donald Von Raesfeld Power Plant · City of Santa Clara - (CA)Power plant (Natural Gas)21.2 km148 MW[6]
Los Esteros Critical Energy Center · Los Esteros Critical Energy Facility LLCPower plant (Natural Gas)24.3 km300 MW[6]
Gilroy Power Plant · Calpine Gilroy Cogen LPPower plant (Natural Gas)34.6 km101 MW[6]
Gilroy Peaking Energy Center · Calpine Gilroy Cogen LPPower plant (Natural Gas)34.7 km144 MW[6]
Elkhorn Battery Energy Storage System · Pacific Gas & Electric Co.Power plant (Batteries)48.2 km183 MW[6]
Dynegy Moss Landing Power Plant Hybrid · Dynegy -Moss Landing LLCPower plant (Natural Gas)48.6 km1.77 GW[6]
Humminbird SubstationSubstation0.35 km115 kV[1]
Santa Teresa Substation · Pacific Gas and Electric CompanySubstation0.89 km115 kV[1]
Edenvale · Pacific Gas and Electric CompanySubstation1.29 km115 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
JEWELFLOWER STORAGECAISO 1553StorageIA signed · proposed 2029-03350 MW[4]
TANAGER STORAGECAISO 1550StorageIA signed · proposed 2027-12200 MW[4]
LOS ESTEROS CRITICAL ENERGY FACILITY EXPANSIONCAISO 378StorageIA signed · proposed 2023-09120 MW[4]
TOKAY STORAGECAISO 1866StorageIA signed · proposed 2030-03100 MW[4]
KIFER BESS 1CAISO 1918StorageIn study · proposed 2025-1250 MW[4]
MILPA POWER BANKCAISO 1457StorageIn study · proposed 2025-043 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
166,600 sq ft[1]Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

Other buildings on this campus

3

All claims (provenance audit)

17
FieldValueSourceConfidenceAs ofStatus
NameEquinix SV5way/161126131 name=Equinix SV5[1] Likely2026-09-27Shown
StatusOperating[1] derivedUnverified2026-09-27Shown
Facility typeColocation[1] derivedUnverified2026-09-27Shown
Websitehttps://www.equinix.com/data-centers/americas-colocation/united-states-colocation/silicon-valley-data-centers/sv5[1] Likely2026-09-27Shown
Address9 Great Oaks Boulevard, San Jose, CA 95119[1] Likely2026-09-27Shown
OperatorEquinixoperator=Equinix[1] Likely2026-09-27Shown
UtilityPacific Gas and Electricterritory 14328: PACIFIC GAS & ELECTRIC CO. (INVESTOR OWNED, PACIFIC GAS & ELECT[2] derivedUnverified2022Shown
ISO / RTOCAISOCALIFORNIA INDEPENDENT SYSTEM OPERATOR[3] derivedLikely—Shown
Balancing authorityCISO[2] derivedLikely—Shown
Nearest mapped substationHumminbird Substation (115 kV)way/1474290842[1] derivedLikely2026-09-28Shown
Distance to substation0.4 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby115 kV[1] derivedLikely2026-09-28Shown
Generation queued in county823 MW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price25.11¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price30.56¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km3.6 GW[6] derivedConfirmed202502Shown
Building footprint166,600 sq ft[1] derivedLikely2026-09-27Shown