Insurance Exchange Building
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityInsurance Exchange Building
- →substationElati Substation (230 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 1.04 km away. Proximity does not establish that it serves the site.
- →transmission230 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.4 km away). Not confirmed as the supply path.
- →utilityPublic Service CO of Colorado[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outlineOwnership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Colorado statewide average, July 2026.
- State avg. commercial price
Colorado statewide average, July 2026.
- Generation within 50 km
82 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 230 kV line · Public Service Company of Colorado | Transmission line | 1.4 km | 230 kV | [1] |
| Arapahoe & Dakota to Denver Terminal · Public Service Company of Colorado | Transmission line | 1.8 km | 230 kV | [1] |
| 115 kV line | Transmission line | 1.82 km | 115 kV | [1] |
| Cherokee · Public Service Co of Colorado | Power plant (Natural Gas) | 7.4 km | 886 MW | [5] |
| Arapahoe Combustion Turbine Project · SWG Arapahoe, LLC | Power plant (Natural Gas) | 8.5 km | 123 MW | [5] |
| Plains End II LLC · Plains End Operating Services LLC | Power plant (Natural Gas) | 23.3 km | 111 MW | [5] |
| Plains End · Plains End Operating Services LLC | Power plant (Natural Gas) | 23.3 km | 110 MW | [5] |
| Blue Spruce Energy Center · Public Service Co of Colorado | Power plant (Natural Gas) | 26.9 km | 264 MW | [5] |
| Frank Knutson · Tri-State G & T Assn, Inc | Power plant (Natural Gas) | 34.5 km | 134 MW | [5] |
| Spindle Hill Energy Center · Invenergy Services LLC | Power plant (Natural Gas) | 39.6 km | 270 MW | [5] |
| Jm Shafer Generating Station · Tri-State G & T Assn, Inc | Power plant (Natural Gas) | 43.6 km | 272 MW | [5] |
| Elati Substation · Public Service Company of Colorado | Substation | 1.04 km | 230 kV | [1] |
| California Substation · Public Service Company of Colorado | Substation | 1.32 km | 115 kV | [1] |
| Lacombe Substation · Public Service Company of Colorado | Substation | 1.44 km | 230 kV | [1] |
| Unnamed substation | Substation | 1.53 km | — | [1] |
| Capitol Hill Substation · Public Service Company of Colorado | Substation | 1.68 km | 115 kV | [1] |
| Denver Health Central Power Plant · Denver Health & Hospital Authority | Substation | 2.06 km | — | [1] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
16| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Insurance Exchange Buildingway/89784186 name=Insurance Exchange Building | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 910 15th Street, Denver, CO 80202 | [1] | Likely | 2026-09-27 | Shown |
| CLLI code | DNVRCO26 | [1] | Likely | 2026-09-27 | Shown |
| Utility | Public Service CO of Coloradoterritory 15466: PUBLIC SERVICE CO OF COLORADO (INVESTOR OWNED, XCEL ENERGY) | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | PSCO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Elati Substation (230 kV)way/332389318 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 9.54¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 13.81¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 2.86 GW | [5] derived | Confirmed | 202502 | Shown |
| Floor area | 158,400 sq ft | [1] estimated | Unverified | 2026-09-27 | Shown |
| Building footprint | 19,800 sq ft | [1] derived | Likely | 2026-09-27 | Shown |
| Floors | 8building:levels=8 | [1] | Likely | 2026-09-27 | Shown |