IT
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityIT
- →substationHarvey Lynn Substation (66 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 1.59 km away. Proximity does not establish that it serves the site.
- →transmission66 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.54 km away). Not confirmed as the supply path.
- →utilityCity of Riverside - (Ca)[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Street address- Coordinates
- 33.91029, -117.50302
- County
- Riverside County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Wapa-- Western Area Power Administration.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
California statewide average, July 2026.
- State avg. commercial price
California statewide average, July 2026.
- Generation within 50 km
146 EIA-reported plants within 50 km.
- Generation queued in county
17 active generation interconnection requests in Riverside County: Solar + storage 3,797 MW, Storage 2,085 MW, Wind 150 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 66 kV line | Transmission line | 1.54 km | 66 kV | [1] |
| Riverside Energy Resource Center · City of Riverside - (CA) | Power plant (Natural Gas) | 7.5 km | 196 MW | [6] |
| Condor Energy Storage LLC · Condor Energy Storage LLC | Power plant (Batteries) | 19.9 km | 200 MW | [6] |
| Mountainview Generating Station · Southern California Edison Co | Power plant (Natural Gas) | 30.7 km | 1.02 GW | [6] |
| Canyon Power Plant · City of Anaheim - (CA) | Power plant (Natural Gas) | 33.6 km | 195 MW | [6] |
| Menifee Power Bank · Nova Power, LLC | Power plant (Batteries) | 36.2 km | 620 MW | [6] |
| Devil Canyon · California Dept. of Water Resources | Power plant (Hydroelectric) | 36.3 km | 262 MW | [6] |
| Walnut Creek Energy Park · Walnut Creek LLC | Power plant (Natural Gas) | 42.2 km | 501 MW | [6] |
| Stanton Energy Reliability Center Hybrid · Wellhead Services, Inc | Power plant (Natural Gas) | 46 km | 161 MW | [6] |
| Harvey Lynn Substation | Substation | 1.59 km | 66 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| EASLEYCAISO 2042 | Solar + storage | IA signed · proposed 2028-03 | 650 MW | [4] |
| BLUEWATER RENEWABLE ENERGY STORAGECAISO 72 | Storage | IA signed · proposed 2028-12 | 500 MW | [4] |
| OBERONCAISO 1642 | Solar + storage | IA signed · proposed 2026-04 | 500 MW | [4] |
| DOUBLE BUTTE STORAGECAISO 1646 | Storage | IA signed · proposed 2030-07 | 500 MW | [4] |
| GRACE ENERGY CENTERCAISO 1761 | Solar + storage | IA signed · proposed 2027-01 | 500 MW | [4] |
| ATHOS POWER PLANTCAISO 1405 | Solar + storage | IA signed · proposed 2027-05 | 450 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
12| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | ITnode/11924506303 name=IT | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Utility | City of Riverside - (Ca)territory 16088: CITY OF RIVERSIDE - (CA) (MUNICIPAL, CITY OF RIVERSIDE) | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | CAISOCALIFORNIA INDEPENDENT SYSTEM OPERATOR | [3] derived | Likely | — | Shown |
| Balancing authority | CISO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Harvey Lynn Substation (66 kV)way/199582149 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1.6 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 66 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 6.03 GW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 25.11¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 30.56¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 4.61 GW | [6] derived | Confirmed | 202502 | Shown |