DC
/

IT

OperatingUnclassifiedSiteRiverside County, California
10% profile completeness
12 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
City of Riverside - (Ca) · CAISO
Substation: Harvey Lynn Substation (66 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    IT
  2. substation
    Harvey Lynn Substation (66 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 1.59 km away. Proximity does not establish that it serves the site.
  3. transmission
    66 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (1.54 km away). Not confirmed as the supply path.
  4. utility
    City of Riverside - (Ca)[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    CAISO[3]
    Service territoryLikely
    Balancing authority: CISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Street address
Coordinates
33.91029, -117.50302
County
Riverside County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Wapa-- Western Area Power Administration.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
CAISO[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
CISO[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Harvey Lynn Substation (66 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
1.6 km[1]Likelyderived
Highest-voltage line nearby
66 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
25.11¢/kWh[5]Confirmed

California statewide average, July 2026.

State avg. commercial price
30.56¢/kWh[5]Confirmed

California statewide average, July 2026.

Generation within 50 km
4.61 GW[6]Confirmedderived

146 EIA-reported plants within 50 km.

Generation queued in county
6.03 GW[4]Confirmedderived

17 active generation interconnection requests in Riverside County: Solar + storage 3,797 MW, Storage 2,085 MW, Wind 150 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
66 kV lineTransmission line1.54 km66 kV[1]
Riverside Energy Resource Center · City of Riverside - (CA)Power plant (Natural Gas)7.5 km196 MW[6]
Condor Energy Storage LLC · Condor Energy Storage LLCPower plant (Batteries)19.9 km200 MW[6]
Mountainview Generating Station · Southern California Edison CoPower plant (Natural Gas)30.7 km1.02 GW[6]
Canyon Power Plant · City of Anaheim - (CA)Power plant (Natural Gas)33.6 km195 MW[6]
Menifee Power Bank · Nova Power, LLCPower plant (Batteries)36.2 km620 MW[6]
Devil Canyon · California Dept. of Water ResourcesPower plant (Hydroelectric)36.3 km262 MW[6]
Walnut Creek Energy Park · Walnut Creek LLCPower plant (Natural Gas)42.2 km501 MW[6]
Stanton Energy Reliability Center Hybrid · Wellhead Services, IncPower plant (Natural Gas)46 km161 MW[6]
Harvey Lynn SubstationSubstation1.59 km66 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
EASLEYCAISO 2042Solar + storageIA signed · proposed 2028-03650 MW[4]
BLUEWATER RENEWABLE ENERGY STORAGECAISO 72StorageIA signed · proposed 2028-12500 MW[4]
OBERONCAISO 1642Solar + storageIA signed · proposed 2026-04500 MW[4]
DOUBLE BUTTE STORAGECAISO 1646StorageIA signed · proposed 2030-07500 MW[4]
GRACE ENERGY CENTERCAISO 1761Solar + storageIA signed · proposed 2027-01500 MW[4]
ATHOS POWER PLANTCAISO 1405Solar + storageIA signed · proposed 2027-05450 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

12
FieldValueSourceConfidenceAs ofStatus
NameITnode/11924506303 name=IT[1] Likely2026-09-27Shown
StatusOperating[1] derivedUnverified2026-09-27Shown
UtilityCity of Riverside - (Ca)territory 16088: CITY OF RIVERSIDE - (CA) (MUNICIPAL, CITY OF RIVERSIDE)[2] derivedUnverified2022Shown
ISO / RTOCAISOCALIFORNIA INDEPENDENT SYSTEM OPERATOR[3] derivedLikely—Shown
Balancing authorityCISO[2] derivedLikely—Shown
Nearest mapped substationHarvey Lynn Substation (66 kV)way/199582149[1] derivedLikely2026-09-28Shown
Distance to substation1.6 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby66 kV[1] derivedLikely2026-09-28Shown
Generation queued in county6.03 GW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price25.11¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price30.56¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km4.61 GW[6] derivedConfirmed202502Shown