Lumen Technologies data center
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityLumen Technologies data center
- →substationUnnamed substation[1]Proximity onlyUnverifiedNearest mapped substation, 0.1 km away. Proximity does not establish that it serves the site.
- →transmission66 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.55 km away). Not confirmed as the supply path.
- →utilityCity of Burbank Water and Power[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 34.19987, -118.34379
- County
- Los Angeles County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developer
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Owner
- Operator
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
California statewide average, July 2026.
- State avg. commercial price
California statewide average, July 2026.
- Generation within 50 km
140 EIA-reported plants within 50 km.
- Generation queued in county
20 active generation interconnection requests in Los Angeles County: Storage 4,550 MW, Solar + storage 2,336 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 66 kV line | Transmission line | 1.55 km | 66 kV | [1] |
| 34.5 kV line | Transmission line | 1.57 km | 34.5 kV | [1] |
| Magnolia Power Project · City of Burbank Water and Power | Power plant (Natural Gas) | 3.5 km | 301 MW | [6] |
| Valley (Ca) · Los Angeles Department of Water & Power | Power plant (Natural Gas) | 6.7 km | 563 MW | [6] |
| Scattergood · Los Angeles Department of Water & Power | Power plant (Natural Gas) | 32.3 km | 778 MW | [6] |
| El Segundo Energy Center LLC · NRG Energy Services LLC | Power plant (Natural Gas) | 33 km | 510 MW | [6] |
| Walnut Creek Energy Park · Walnut Creek LLC | Power plant (Natural Gas) | 42.4 km | 501 MW | [6] |
| Watson Cogeneration · ARCO Products Co-Watson | Power plant (Natural Gas) | 43.6 km | 398 MW | [6] |
| Harbor · Los Angeles Department of Water & Power | Power plant (Natural Gas) | 48.3 km | 428 MW | [6] |
| Long Beach Generation LLC · Long Beach Generation LLC | Power plant (Natural Gas) | 49.7 km | 260 MW | [6] |
| Unnamed substation | Substation | 0.1 km | — | [1] |
| Unnamed substation | Substation | 1.32 km | — | [1] |
| Unnamed substation | Substation | 1.48 km | — | [1] |
| City of Burbank substation · City of Burbank | Substation | 1.58 km | 66 kV | [1] |
| Unnamed substation | Substation | 1.64 km | — | [1] |
| Unnamed substation | Substation | 1.88 km | — | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| ANGELENO SOLAR FARMCAISO 1625 | Solar + storage | IA signed · proposed 2028-12 | 1.15 GW | [4] |
| ANTELOPE SOLAR 2CAISO 1208 | Solar + storage | IA signed · proposed 2025-11 | 650 MW | [4] |
| FLEETWOODCAISO 2111 | Storage | In study · proposed 2032-04 | 400 MW | [4] |
| GABRIEL STORAGECAISO 2113 | Storage | IA signed · proposed 2033-05 | 400 MW | [4] |
| SIMONCAISO 2115 | Storage | In study · proposed 2032-04 | 400 MW | [4] |
| MARICICAISO 2116 | Storage | IA signed · proposed 2031-02 | 400 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational1990[1]
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
All claims (provenance audit)
16| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Enterprise | [1] derived | Unverified | 2026-09-27 | Shown |
| Owner | Digital Realtyowner=Digital Realty | [1] | Likely | 2026-09-27 | Shown |
| Operator | Lumen Technologiesoperator=Centurylink | [1] | Likely | 2026-09-27 | Shown |
| Utility | City of Burbank Water and Powerterritory 2507: CITY OF BURBANK WATER AND POWER (MUNICIPAL, BURBANK WATER & POWE | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | LDWP | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substationway/912547121 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.1 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 66 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 6.89 GW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 25.11¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 30.56¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 6.03 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 43,200 sq ft | [1] derived | Likely | 2026-09-27 | Shown |
| First operational | 1990start_date=1990 | [1] | Likely | 2026-09-27 | Shown |