Meta Aiken
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- EnergizationAug 7, 2026
Satellite imagery
- Aug 7, 2026 · Building 1 is confirmed operational via drone imagery with 8/9 group of coolers with spinning fans. Imagery also confirms all cooling and power infrastructure in place for Building[1]
- OperationalAug 7, 2026
Satellite imagery
- Aug 7, 2026 · Building 1 is confirmed operational via drone imagery with 8/9 group of coolers with spinning fans. Imagery also confirms all cooling and power infrastructure in place for Building[1]
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.
Grid path
- →facilityMeta Aiken
- →substationOn-site substation[1]Satellite imageryLikely2 substation outlines traced inside the campus on satellite imagery
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →utilityDominion Energy South Carolina, INC[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 33.64238, -81.84303
- Address
- County
- Aiken County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developer
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workload
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
Power (all fields)
- Current facility power
Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.
- Current IT capacity
Estimated IT load currently online, based on buildings observed operational.
- Estimated annual consumption
90 MW × 8,760 h × 70% utilization.
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
Control area of the containing utility territory.
- State avg. industrial price
South Carolina statewide average, July 2026.
- State avg. commercial price
South Carolina statewide average, July 2026.
- Generation within 50 km
19 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Shaw Creek Solar, LLC · Shaw Creek Solar | Power plant (Solar) | 9 km | 75 MW | [6] |
| Urquhart · Dominion Energy South Carolina, Inc | Power plant (Natural Gas) | 23.9 km | 640 MW | [6] |
| J Strom Thurmond · USCE-Savannah District | Power plant (Hydroelectric) | 32.7 km | 336 MW | [6] |
| Graphic Packaging International Augusta · Graphic Packaging International - Augusta | Power plant (Biomass) | 36.4 km | 79 MW | [6] |
| Fort Gordon Solar Facility · Georgia Power Co | Power plant (Solar) | 39.6 km | 30 MW | [6] |
| Beulah Solar · Beulah Solar, LLC | Power plant (Solar) | 42 km | 75 MW | [6] |
| Savannah River Site Biomass Cogen · Ameresco | Power plant (Biomass) | 43.1 km | 19 MW | [6] |
| Allora Solar, LLC · Allora Solar, LLC | Power plant (Solar) | 49.9 km | 75 MW | [6] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
Real estate
None sourced yet
None sourced yet
None sourced yet
- Capital cost / investment
Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
Compute
What changed (last 3 years)
Follow this facility (RSS)Timeline
- May 30, 2024[1]
Land clearing begins
- Apr 8, 2026[1]
Buildings 1 and 2 are nearly complete, but there's still some equipment strewn around the site. We expect around 3 more months needed for commissioning and server installation.
Building 1 is confirmed operational via drone imagery with 8/9 group of coolers with spinning fans. Imagery also confirms all cooling and power infrastructure in place for Building 2.
All claims (provenance audit)
26| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Meta Aiken | [1] | Likely | 2026-08-07 | Shown |
| Status | Under construction | [1] derived | Likely | 2024-05-30 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2026-04-08 | Superseded / alternative |
| Status | Operating | [1] derived | Likely | 2026-08-07 | Shown |
| Facility type | AI campus | [1] derived | Likely | 2026-08-07 | Shown |
| Address | 7601 State Hwy 105, Trenton, SC 29847, USA | [1] | Likely | 2026-08-07 | Shown |
| Owner | MetaOwner: Meta | [1] | Confirmed | 2026-08-07 | Shown |
| End users | MetaUsers: Meta | [1] | Confirmed | 2026-08-07 | Shown |
| Utility | Dominion Energy South Carolina, INCterritory 17539: DOMINION ENERGY SOUTH CAROLINA, INC (INVESTOR OWNED, SCANA CORP | [2] derived | Unverified | 2022 | Shown |
| Current facility power | 90 MW | [1] estimated | Likely | 2026-08-07 | Shown |
| Current IT capacity | 69 MW | [1] estimated | Likely | 2026-08-07 | Shown |
| Estimated annual consumption | 552 GWh/yr | [3] estimated | Speculative | 2026-09-29 | Shown |
| ISO / RTO | None (non-RTO region) | [4] derived | Likely | — | Shown |
| Balancing authority | SCEG | [2] derived | Likely | — | Shown |
| State avg. industrial price | 7.84¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.61¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.37 GW | [6] derived | Confirmed | 202502 | Shown |
| Buildings (planned) | 2 | [1] derived | Likely | 2026-08-07 | Shown |
| Buildings operational | 1 | [1] estimated | Likely | 2026-08-07 | Shown |
| Buildings operational | 0 | [1] estimated | Likely | 2024-05-30 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2026-04-08 | Superseded / alternative |
| Capital cost / investment | $2.6B | [1] estimated | Likely | 2026-08-07 | Shown |
| Compute (H100-equivalents) | 78,300 | [1] estimated | Likely | 2026-08-07 | Shown |
| Chip types | B300 | [1] | Confirmed | 2026-08-07 | Shown |
| Construction start | May 30, 2024 | [1] derived | Likely | 2026-08-07 | Shown |
| First operational | Aug 7, 2026 | [1] derived | Likely | 2026-08-07 | Shown |