Microsoft
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityMicrosoft
- →substationUnnamed substation[1]Proximity onlyUnverifiedNearest mapped substation, 0.05 km away. Proximity does not establish that it serves the site.
- →transmission115 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.7 km away). Not confirmed as the supply path.
- →utilityPuerto Rico Electric Pwr Authority[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
- Central San Juan Plant (Petroleum, 784 MW) is 1.2 km away[4]EIA plant within 1.5 km; proximity does not establish that it supplies the facilityUnknown typeCo-located784 MWUnverified
Location & imagery
Street address- Coordinates
- 18.41744, -66.10899
- Address
- County
- Guaynabo
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- Generation within 50 km
33 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 115 kV line · Puerto Rico Electric Power Authority | Transmission line | 0.7 km | 115 kV | [1] |
| 32 kV line | Transmission line | 1.72 km | 32 kV | [1] |
| 38 kV line · Puerto Rico Electric Power Authority | Transmission line | 1.74 km | 38 kV | [1] |
| Central San Juan Plant · Puerto Rico Electric Pwr Authority | Power plant (Petroleum) | 1.2 km | 784 MW | [4] |
| Palo Seco Plant · Puerto Rico Electric Pwr Authority | Power plant (Petroleum) | 6 km | 479 MW | [4] |
| Lilly Del Caribe Pr01 · Lilly del Caribe | Power plant (Petroleum) | 16.1 km | 30 MW | [4] |
| San Fermin Solar Farm Hybrid · San Fermin Solar Farm LLC | Power plant (Solar) | 21.6 km | 28 MW | [4] |
| Vega Baja · Puerto Rico Electric Pwr Authority | Power plant (Petroleum) | 29.9 km | 42 MW | [4] |
| Humacao Solar Project, LLC · Fonroche Energy America, Inc. | Power plant (Solar) | 43.6 km | 20 MW | [4] |
| Abbvie Ltd · AbbVie LTD | Power plant (Natural Gas) | 48.3 km | 31 MW | [4] |
| Yabucoa · Puerto Rico Electric Pwr Authority | Power plant (Petroleum) | 48.6 km | 42 MW | [4] |
| Unnamed substation | Substation | 0.05 km | — | [1] |
| Subestación Caparra · Puerto Rico Electric Power Authority | Substation | 0.88 km | — | [1] |
| Puerto Rico Electric Power Authority substation · Puerto Rico Electric Power Authority | Substation | 0.91 km | — | [1] |
| Puerto Rico Electric Power Authority substation · Puerto Rico Electric Power Authority | Substation | 1.14 km | — | [1] |
| Puerto Rico Electric Power Authority substation · Puerto Rico Electric Power Authority | Substation | 1.16 km | — | [1] |
| Unnamed substation | Substation | 1.26 km | — | [1] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
12| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Microsoftnode/10014176940 name=Microsoft | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Hyperscale | [1] derived | Unverified | 2026-09-27 | Shown |
| Website | www,microsoft.com/es-pr | [1] | Likely | 2026-09-27 | Shown |
| Address | 48 Avenida El Caño, Guaynabo, PR 00968 | [1] | Likely | 2026-09-27 | Shown |
| Operator | Microsoftoperator=Microsoft | [1] | Likely | 2026-09-27 | Shown |
| Utility | Puerto Rico Electric Pwr Authorityterritory 15497: PUERTO RICO ELECTRIC PWR AUTHORITY (STATE, PUERTO RICO ELECTRIC | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substationway/1208396628 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.1 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 115 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation within 50 km | 1.56 GW | [4] derived | Confirmed | 202502 | Shown |