Modesto Junior College West Data Center
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityModesto Junior College West Data Center
- →substationUnnamed substation[1]Proximity onlyUnverifiedNearest mapped substation, 0.39 km away. Proximity does not establish that it serves the site.
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →utilityModesto Irrigation District[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 37.66515, -121.04004
- County
- Stanislaus County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- State avg. industrial price
California statewide average, July 2026.
- State avg. commercial price
California statewide average, July 2026.
- Generation within 50 km
43 EIA-reported plants within 50 km.
- Generation queued in county
3 active generation interconnection requests in Stanislaus County: Storage 400 MW, Solar + storage 20 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Woodland · Modesto Irrigation District | Power plant (Natural Gas) | 2.2 km | 177 MW | [6] |
| Ripon Generation Station · Modesto Irrigation District | Power plant (Natural Gas) | 10 km | 100 MW | [6] |
| Mcclure · Modesto Irrigation District | Power plant (Natural Gas) | 10.4 km | 107 MW | [6] |
| Almond Power Plant · Turlock Irrigation District | Power plant (Natural Gas) | 11.2 km | 200 MW | [6] |
| Walnut Energy Center · Turlock Irrigation District | Power plant (Natural Gas) | 23.5 km | 269 MW | [6] |
| Proxima · Proxima Solar, LLC | Power plant (Solar) | 31.4 km | 352 MW | [6] |
| North Central Valley · North Central Valley Energy Storage, LLC | Power plant (Batteries) | 39 km | 132 MW | [6] |
| Tracy Combined Cycle Power Plant · MRP San Joaquin Energy LLC. | Power plant (Natural Gas) | 40 km | 320 MW | [6] |
| Unnamed substation | Substation | 0.39 km | — | [1] |
| Prescott Station · Modesto Irrigation District | Substation | 1.33 km | — | [1] |
| Unnamed substation | Substation | 2.24 km | — | [1] |
| Unnamed substation | Substation | 2.42 km | — | [1] |
| Rosemore Substation · Modesto Irrigation District | Substation | 2.55 km | 230 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| GOLDEN FLATSCAISO 1903 | Storage | IA signed · proposed 2031-09 | 300 MW | [4] |
| OAKDALE STORAGECAISO 1895 | Storage | IA signed · proposed 2031-11 | 100 MW | [4] |
| CROW CREEK SOLAR 1 (FKA: FRONTIER SOLAR 1) (FKA AS SCATEC WESTSIDE SOLAR RANCH I AND STANISLAUS PV - PHASE 1)CAISO 539 | Solar + storage | IA signed · proposed 2025-04 | 20 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
13| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Modesto Junior College West Data Centerway/1296163129 name=Modesto Junior College West Data Center | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Operator | Yosemite Community College Districtoperator=Yosemite Community College District | [1] | Likely | 2026-09-27 | Shown |
| Utility | Modesto Irrigation Districtterritory 12745: MODESTO IRRIGATION DISTRICT (POLITICAL SUBDIVISION, MODESTO IRR | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | BANC | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substationway/850492504 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.4 km | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 420 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 25.11¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 30.56¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 2.12 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 6,000 sq ft | [1] derived | Likely | 2026-09-27 | Shown |