NocRoom Miami IT Services
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityNocRoom Miami IT Services
- →substationFlorida Power & Light substation (138 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.62 km away. Proximity does not establish that it serves the site.
- →transmissionKrome Sub FPL to Davis Sub FPL 138KV[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.62 km away). Not confirmed as the supply path.
- →utilityFlorida Power & Light CO[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Street address- Coordinates
- 25.64656, -80.42343
- County
- Miami-Dade County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Florida statewide average, July 2026.
- State avg. commercial price
Florida statewide average, July 2026.
- Generation within 50 km
11 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Krome Sub FPL to Davis Sub FPL 138KV · Florida Power & Light | Transmission line | 0.62 km | 138 kV | [1] |
| Miami Dade Solar Energy Center · Florida Power & Light Co | Power plant (Solar) | 6.7 km | 75 MW | [5] |
| South District Wastewater Treatment Plt · Miami Dade Water & Sewer Dept | Power plant (Biomass) | 13.9 km | 8 MW | [5] |
| Redlands · Florida Power & Light Co | Power plant (Solar) | 16.9 km | 75 MW | [5] |
| Everglades Solar Energy Center · Florida Power & Light Co | Power plant (Solar) | 17.5 km | 75 MW | [5] |
| G W Ivey · City of Homestead - (FL) | Power plant (Natural Gas) | 19.6 km | 33 MW | [5] |
| Turkey Point · Florida Power & Light Co | Power plant (Nuclear) | 25.2 km | 2.95 GW | [5] |
| Wynwood Energy Storage · Florida Power & Light Co | Power plant (Batteries) | 28.3 km | 10 MW | [5] |
| Central District Wastewater Treat Plant · Miami Dade Water & Sewer Dept | Power plant (Biomass) | 29.4 km | 5 MW | [5] |
| Florida Power & Light substation · Florida Power & Light | Substation | 0.62 km | 138 kV | [1] |
| Florida Power & Light substation · Florida Power & Light | Substation | 0.85 km | 138 kV | [1] |
| Davis Substation · Florida Power & Light | Substation | 2.77 km | 230 kV | [1] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
12| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | NocRoom Miami IT Servicesnode/3406476814 name=NocRoom Miami IT Services | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Website | https://nocroom.com | [1] | Likely | 2026-09-27 | Shown |
| Utility | Florida Power & Light COterritory 6452: FLORIDA POWER & LIGHT CO (INVESTOR OWNED, NEXTERA ENERGY INC) | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | FPL | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Florida Power & Light substation (138 kV)way/1312173877 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.6 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 138 kV | [1] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 9.17¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.37¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 3.23 GW | [5] derived | Confirmed | 202502 | Shown |