PG&E Datacenter
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityPG&E Datacenter
- →substationUnnamed substation (115 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 1.83 km away. Proximity does not establish that it serves the site.
- →transmissionVaca-Suisun-Jameson (115 kV)[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.16 km away). Not confirmed as the supply path.
- →utilityPacific Gas and Electric[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 38.24615, -122.06711
- Address
- County
- Solano County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Wapa-- Western Area Power Administration.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
California statewide average, July 2026.
- State avg. commercial price
California statewide average, July 2026.
- Generation within 50 km
79 EIA-reported plants within 50 km.
- Generation queued in county
7 active generation interconnection requests in Solano County: Storage 1,200 MW, Wind 207 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Vaca-Suisun-Jameson · Pacific Gas and Electric Company | Transmission line | 1.16 km | 115 kV | [1] |
| 115 kV line · Pacific Gas and Electric | Transmission line | 1.72 km | 115 kV | [1] |
| Suisun-Jameson · Pacific Gas and Electric | Transmission line | 1.72 km | 115 kV | [1] |
| Vaca-Vacaville-Jameson-North Tower · Pacific Gas and Electric Company | Transmission line | 1.82 km | 115 kV | [1] |
| Crockett Cogen Project · Crockett Cogeneration | Power plant (Natural Gas) | 24.8 km | 247 MW | [6] |
| High Winds LLC · FPLE High Winds, LLC | Power plant (Wind) | 25.8 km | 162 MW | [6] |
| Diablo Energy Storage · Diablo Energy Storage, LLC | Power plant (Batteries) | 28.2 km | 200 MW | [6] |
| Los Medanos Energy Center · Los Medanos Energy Center LLC | Power plant (Natural Gas) | 29.4 km | 559 MW | [6] |
| Solano Wind · Sacramento Municipal Util Dist | Power plant (Wind) | 29.8 km | 301 MW | [6] |
| Delta Energy Center · Delta Energy Center LLC | Power plant (Natural Gas) | 32.1 km | 842 MW | [6] |
| Marsh Landing Generating Station · Marsh Landing LLC | Power plant (Natural Gas) | 36.7 km | 765 MW | [6] |
| Gateway Generating Station · Pacific Gas & Electric Co. | Power plant (Natural Gas) | 37.1 km | 563 MW | [6] |
| Unnamed substation | Substation | 1.83 km | 115 kV | [1] |
| Unnamed substation | Substation | 2.16 km | — | [1] |
| Suisun Substation · Pacific Gas and Electric Company | Substation | 2.26 km | 115 kV | [1] |
| Hale Substation · Pacific Gas and Electric Company | Substation | 2.81 km | — | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| TOLENASCAISO 1842 | Storage | In study · proposed 2031-02 | 400 MW | [4] |
| CORBY 2CAISO 1854 | Storage | In study · proposed 2031-03 | 400 MW | [4] |
| CORBYCAISO 1270 | Storage | IA signed · proposed 2027-06 | 300 MW | [4] |
| ARGES BESSCAISO 1856 | Storage | In study · proposed 2029-06 | 100 MW | [4] |
| SOLANO 4 WINDCAISO 1463 | Wind | IA signed · proposed 2025-05 | 91 MW | [4] |
| MONTEZUMA IICAISO 222 | Wind | IA signed · proposed 2012-01 | 78 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
14| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | PG&E Datacenterway/780063735 name=PG&E Datacenter | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 425 Beck Avenue, Fairfield, CA 94533 | [1] | Likely | 2026-09-27 | Shown |
| Utility | Pacific Gas and Electricterritory 14328: PACIFIC GAS & ELECTRIC CO. (INVESTOR OWNED, PACIFIC GAS & ELECT | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | CAISOCALIFORNIA INDEPENDENT SYSTEM OPERATOR | [3] derived | Likely | — | Shown |
| Balancing authority | CISO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substation (115 kV)way/436903528 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1.8 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 115 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.41 GW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 25.11¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 30.56¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 5.2 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 55,400 sq ft | [1] derived | Likely | 2026-09-27 | Shown |