RagingWire CA2
Part of NTT Global Data Centers — Sacramento, CA campus
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityRagingWire CA2
- →substationUnnamed substation[1]Proximity onlyUnverifiedNearest mapped substation, 0.09 km away. Proximity does not establish that it serves the site.
- →transmission230 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.44 km away). Not confirmed as the supply path.
- →utilitySacramento Municipal Util Dist[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outlineOwnership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Wapa-- Western Area Power Administration.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
California statewide average, July 2026.
- State avg. commercial price
California statewide average, July 2026.
- Generation within 50 km
95 EIA-reported plants within 50 km.
- Generation queued in county
1 active generation interconnection requests in Sacramento County: Storage 50 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 230 kV line · Sacramento Municipal Utility District | Transmission line | 0.44 km | 230 kV | [1] |
| O'Banion-Natomas · Sacramento Municipal Utility District | Transmission line | 0.54 km | 230 kV | [1] |
| O'Banion-Natomas/Elverta-Station E · Sacramento Municipal Utility District | Transmission line | 0.54 km | 230 kV | [1] |
| Natomas-Hurley · Sacramento Municipal Utility District | Transmission line | 0.55 km | 230 kV | [1] |
| Natomas-Hurley/Elverta-Station E · Sacramento Municipal Utility District | Transmission line | 0.57 km | 230 kV | [1] |
| Elverta-Hurley · Western Area Power Administration | Transmission line | 0.57 km | 230 kV | [1] |
| Sca Cogen 2 · Sacramento Municipal Util Dist | Power plant (Natural Gas) | 15.5 km | 177 MW | [6] |
| Spa Cogen 3 · Sacramento Municipal Util Dist | Power plant (Natural Gas) | 15.6 km | 178 MW | [6] |
| Roseville Energy Park · City of Roseville - (CA) | Power plant (Natural Gas) | 18.5 km | 212 MW | [6] |
| Carson Ice-Gen Project · Sacramento Municipal Util Dist | Power plant (Natural Gas) | 22.9 km | 109 MW | [6] |
| Folsom · U S Bureau of Reclamation | Power plant (Hydroelectric) | 29.6 km | 215 MW | [6] |
| Rancho Seco Solar II, LLC · Rancho Seco Solar II, LLC | Power plant (Solar) | 46.8 km | 160 MW | [6] |
| Cosumnes · Sacramento Municipal Util Dist | Power plant (Natural Gas) | 47.2 km | 545 MW | [6] |
| Sutter Energy Center · Calpine Corp-Sutter | Power plant (Natural Gas) | 48.2 km | 528 MW | [6] |
| Unnamed substation | Substation | 0.09 km | — | [1] |
| Unnamed substation | Substation | 0.14 km | — | [1] |
| Natomas Substation · Sacramento Municipal Utility District | Substation | 0.47 km | 230 kV | [1] |
| Sacramento Municipal Utility District substation · Sacramento Municipal Utility District | Substation | 0.74 km | 69 kV | [1] |
| Sacramento Municipal Utility District substation · Sacramento Municipal Utility District | Substation | 0.92 km | 69 kV | [1] |
| Sacramento Municipal Utility District substation · Sacramento Municipal Utility District | Substation | 1.3 km | 69 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| PROSPECT ENERGY STORAGECAISO 1507 | Storage | Suspended · proposed 2028-06 | 50 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
2- RagingWire CA1Operating · 192,600 sq ft footprint
- RagingWire CA3Operating · 151,600 sq ft footprint
All claims (provenance audit)
17| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | RagingWire CA2way/32560290 name=RagingWire CA2 | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 1312 Striker Avenue, Sacramento, CA 95834 | [1] | Likely | 2026-09-27 | Shown |
| CLLI code | NSCRCA11 | [1] | Likely | 2026-09-27 | Shown |
| Operator | NTT Global Data Centersoperator=NTT | [1] | Likely | 2026-09-27 | Shown |
| Utility | Sacramento Municipal Util Distterritory 16534: SACRAMENTO MUNICIPAL UTIL DIST (POLITICAL SUBDIVISION, SACRAMEN | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | BANC | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substationway/734333441 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.1 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 50 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 25.11¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 30.56¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 2.72 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 205,000 sq ft | [1] derived | Likely | 2026-09-27 | Shown |