SC data center — 215 South Iliff Street
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilitySC data center — 215 South Iliff Street
- →substationMedicine Lodge Substation (115 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.8 km away. Proximity does not establish that it serves the site.
- →transmissionThistle - DeGrasse #1;Thistle - DeGrasse #2 (345 kV)[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.51 km away). Not confirmed as the supply path.
- →utilitySouthern Pioneer Electric Company[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 37.27841, -98.58846
- Address
- County
- Barber County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Most likely retail provider among 3 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Alfalfa Electric Coop, INC, Cms Electric Coop INC.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Kansas statewide average, July 2026.
- State avg. commercial price
Kansas statewide average, July 2026.
- Generation within 50 km
12 EIA-reported plants within 50 km.
- Generation queued in county
3 active generation interconnection requests in Barber County: Storage 215 MW, Solar 189 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Medicine Lodge | Transmission line | 0.79 km | 115 kV | [1] |
| Barber-Medicine Lodge · Sunflower Electric Power Corporation | Transmission line | 0.8 km | 115 kV | [1] |
| 138 kV line · Mid-Kansas Electric Company | Transmission line | 0.81 km | 138 kV | [1] |
| 115 kV line · Southern Pioneer Electric Company | Transmission line | 0.81 km | 115 kV | [1] |
| Flat Ridge - Barber · Sunflower Electric Power Corporation | Transmission line | 1.18 km | 138 kV | [1] |
| Thistle - DeGrasse #1;Thistle - DeGrasse #2 · Oklahoma Gas & Electric | Transmission line | 1.51 km | 345 kV | [1] |
| Flat Ridge Wind Farm · Evergy Kansas Central, Inc | Power plant (Wind) | 15.2 km | 50 MW | [6] |
| Flat Ridge Wind Energy LLC · AE Power Services LLC | Power plant (Wind) | 15.8 km | 44 MW | [6] |
| Flat Ridge 3 · Invenergy Services LLC | Power plant (Wind) | 25.1 km | 128 MW | [6] |
| Flat Ridge 2 Wind Energy LLC · AE Power Services LLC | Power plant (Wind) | 30.6 km | 470 MW | [6] |
| Ninnescah Wind Energy, LLC · Ninnescah Wind Energy LLC | Power plant (Wind) | 34.3 km | 208 MW | [6] |
| Kingman Wind · Kingman Wind Energy, LLC | Power plant (Wind) | 34.3 km | 200 MW | [6] |
| Pratt Wind, LLC · Pratt Wind, LLC | Power plant (Wind) | 35.5 km | 244 MW | [6] |
| Kingman Municipal Power and Light Plant · City of Kingman - (KS) | Power plant (Natural Gas) | 47.3 km | 18 MW | [6] |
| Medicine Lodge Substation · Southern Pioneer Electric Company | Substation | 0.8 km | 115 kV | [1] |
| Barber Substation · Sunflower Electric Power Corporation | Substation | 1.22 km | 138 kV | [1] |
| Unnamed substation | Substation | 2.03 km | — | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| GEN-2017-018 at Thistle 345 kV subSPP GEN-2017-018 | Solar | IA signed · proposed 2025-04 | 189 MW | [4] |
| GEN-2026-SR24 at Thistle 345kV SubstationSPP GEN-2026-SR24 | Storage | In study · proposed 2028-09 | 120 MW | [4] |
| GEN-2018-108 at Thistle 345kV substationSPP GEN-2018-108 | Storage | IA signed · proposed 2028-12 | 95 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
14| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 215 South Iliff Street, Medicine Lodge, KS 67104 | [1] | Likely | 2026-09-27 | Shown |
| Operator | SCoperator=SC | [1] | Likely | 2026-09-27 | Shown |
| Utility | Southern Pioneer Electric Companyterritory 60839: SOUTHERN PIONEER ELECTRIC COMPANY (COOPERATIVE, SUNFLOWER ELECT | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | SPPSOUTHWEST POWER POOL | [3] derived | Likely | — | Shown |
| Balancing authority | SWPP | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Medicine Lodge Substation (115 kV)way/170512067 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.8 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 345 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 404 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 8.52¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 12.04¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.4 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 500 sq ft | [1] derived | Likely | 2026-09-27 | Shown |