DC
/

SC data center — 215 South Iliff Street

OperatingUnclassifiedBuildingMedicine Lodge, Barber County, Kansas
30% profile completeness
14 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
500 sq ft[1]
Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Southern Pioneer Electric Company · SPP
Substation: Medicine Lodge Substation (115 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    SC data center — 215 South Iliff Street
  2. substation
    Medicine Lodge Substation (115 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.8 km away. Proximity does not establish that it serves the site.
  3. transmission
    Thistle - DeGrasse #1;Thistle - DeGrasse #2 (345 kV)[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (1.51 km away). Not confirmed as the supply path.
  4. utility
    Southern Pioneer Electric Company[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    SPP[3]
    Service territoryLikely
    Balancing authority: SWPP
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
37.27841, -98.58846
Address
215 South Iliff Street, Medicine Lodge, KS 67104[1]Likely
County
Barber County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Operator
Utility

Most likely retail provider among 3 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Alfalfa Electric Coop, INC, Cms Electric Coop INC.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
SPP[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
SWPP[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Medicine Lodge Substation (115 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.8 km[1]Likelyderived
Highest-voltage line nearby
345 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
8.52¢/kWh[5]Confirmed

Kansas statewide average, July 2026.

State avg. commercial price
12.04¢/kWh[5]Confirmed

Kansas statewide average, July 2026.

Generation within 50 km
1.4 GW[6]Confirmedderived

12 EIA-reported plants within 50 km.

Generation queued in county
404 MW[4]Confirmedderived

3 active generation interconnection requests in Barber County: Storage 215 MW, Solar 189 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Medicine LodgeTransmission line0.79 km115 kV[1]
Barber-Medicine Lodge · Sunflower Electric Power CorporationTransmission line0.8 km115 kV[1]
138 kV line · Mid-Kansas Electric CompanyTransmission line0.81 km138 kV[1]
115 kV line · Southern Pioneer Electric CompanyTransmission line0.81 km115 kV[1]
Flat Ridge - Barber · Sunflower Electric Power CorporationTransmission line1.18 km138 kV[1]
Thistle - DeGrasse #1;Thistle - DeGrasse #2 · Oklahoma Gas & ElectricTransmission line1.51 km345 kV[1]
Flat Ridge Wind Farm · Evergy Kansas Central, IncPower plant (Wind)15.2 km50 MW[6]
Flat Ridge Wind Energy LLC · AE Power Services LLCPower plant (Wind)15.8 km44 MW[6]
Flat Ridge 3 · Invenergy Services LLCPower plant (Wind)25.1 km128 MW[6]
Flat Ridge 2 Wind Energy LLC · AE Power Services LLCPower plant (Wind)30.6 km470 MW[6]
Ninnescah Wind Energy, LLC · Ninnescah Wind Energy LLCPower plant (Wind)34.3 km208 MW[6]
Kingman Wind · Kingman Wind Energy, LLCPower plant (Wind)34.3 km200 MW[6]
Pratt Wind, LLC · Pratt Wind, LLCPower plant (Wind)35.5 km244 MW[6]
Kingman Municipal Power and Light Plant · City of Kingman - (KS)Power plant (Natural Gas)47.3 km18 MW[6]
Medicine Lodge Substation · Southern Pioneer Electric CompanySubstation0.8 km115 kV[1]
Barber Substation · Sunflower Electric Power CorporationSubstation1.22 km138 kV[1]
Unnamed substationSubstation2.03 km—[1]
Largest queued generation in this countyFuelQueue statusMWSource
GEN-2017-018 at Thistle 345 kV subSPP GEN-2017-018SolarIA signed · proposed 2025-04189 MW[4]
GEN-2026-SR24 at Thistle 345kV SubstationSPP GEN-2026-SR24StorageIn study · proposed 2028-09120 MW[4]
GEN-2018-108 at Thistle 345kV substationSPP GEN-2018-108StorageIA signed · proposed 2028-1295 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
500 sq ft[1]Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

14
FieldValueSourceConfidenceAs ofStatus
StatusOperating[1] derivedUnverified2026-09-27Shown
Address215 South Iliff Street, Medicine Lodge, KS 67104[1] Likely2026-09-27Shown
OperatorSCoperator=SC[1] Likely2026-09-27Shown
UtilitySouthern Pioneer Electric Companyterritory 60839: SOUTHERN PIONEER ELECTRIC COMPANY (COOPERATIVE, SUNFLOWER ELECT[2] derivedUnverified2022Shown
ISO / RTOSPPSOUTHWEST POWER POOL[3] derivedLikely—Shown
Balancing authoritySWPP[2] derivedLikely—Shown
Nearest mapped substationMedicine Lodge Substation (115 kV)way/170512067[1] derivedLikely2026-09-28Shown
Distance to substation0.8 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby345 kV[1] derivedLikely2026-09-28Shown
Generation queued in county404 MW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price8.52¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price12.04¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km1.4 GW[6] derivedConfirmed202502Shown
Building footprint500 sq ft[1] derivedLikely2026-09-27Shown