POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilitySearcy Information Technologies
- →substationSearcy South Substation (161 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.73 km away. Proximity does not establish that it serves the site.
- →transmission161 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.62 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 35.24923, -91.74093
- Address
- County
- White County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Arkansas statewide average, July 2026.
- State avg. commercial price
Arkansas statewide average, July 2026.
- Generation within 50 km
6 EIA-reported plants within 50 km.
- Generation queued in county
2 active generation interconnection requests in White County: Hybrid 100 MW, Solar 100 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 161 kV line · Entergy Arkansas | Transmission line | 0.62 km | 161 kV | [1] |
| Searcy Water I · Entegrity Solar SWU, LLC | Power plant (Solar) | 2.9 km | 1 MW | [6] |
| Searcy Water II · Entegrity Solar SWU 2, LLC | Power plant (Solar) | 4.9 km | 3 MW | [6] |
| Searcy Solar Hybrid · Searcy Solar, LLC | Power plant (Solar) | 5 km | 110 MW | [6] |
| Happy Solar 1 · Lightsource Renewable Energy Asset Management, LLC | Power plant (Solar) | 11.7 km | 95 MW | [6] |
| Woodruff County Solar · Arkansas Electric Coop Corp | Power plant (Solar) | 36.4 km | 122 MW | [6] |
| Greers Ferry Lake · USCE-Little Rock District | Power plant (Hydroelectric) | 38 km | 90 MW | [6] |
| Searcy South Substation · Entergy Arkansas | Substation | 0.73 km | 161 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| J2133 at Garner 115 kV SubstationMISO J2133 | Hybrid | IA signed · proposed 2024-04 | 100 MW | [4] |
| J2742 at BEEBE - GARNER SS 115.0kVMISO J2742 | Solar | In study · proposed 2026-09 | 100 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
15| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Searcy Information Technologiesway/1020721870 name=Searcy Information Technologies | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 101 North Elm Street, Searcy, AR 72143 | [1] | Likely | 2026-09-27 | Shown |
| Operator | City of Searcyoperator=City of Searcy | [1] | Likely | 2026-09-27 | Shown |
| Utility | Entergyterritory 814: ENTERGY ARKANSAS LLC (INVESTOR OWNED, ENTERGY CORP) | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | MISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC.. | [3] derived | Likely | — | Shown |
| Balancing authority | MISO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Searcy South Substation (161 kV)way/204611793 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.7 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 161 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 200 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 7.84¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.76¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 421 MW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 4,600 sq ft | [1] derived | Likely | 2026-09-27 | Shown |