T5@Colorado Springs
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityT5@Colorado Springs
- →substationHancock Substation (34.5 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 1.43 km away. Proximity does not establish that it serves the site.
- →transmissionNixon to Kelker (230 kV)[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.48 km away). Not confirmed as the supply path.
- →utilityCity of Colorado Springs - (CO)[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 38.78611, -104.78840
- Address
- County
- El Paso County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Wapa-- Western Area Power Administration.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Colorado statewide average, July 2026.
- State avg. commercial price
Colorado statewide average, July 2026.
- Generation within 50 km
15 EIA-reported plants within 50 km.
- Generation queued in county
5 active generation interconnection requests in El Paso County: Gas 412 MW, Storage 200 MW, Solar + storage 200 MW, Solar 100 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 34.5 kV line · Colorado Springs Utilities | Transmission line | 0.53 km | 34.5 kV | [1] |
| 115 kV line · Colorado Springs Utilities | Transmission line | 0.84 km | 115 kV | [1] |
| Nixon to Kelker · Colorado Springs Utilities | Transmission line | 1.48 km | 230 kV | [1] |
| South Plant · City of Colorado Springs - (CO) | Power plant (Natural Gas) | 5.8 km | 150 MW | [6] |
| George Birdsall · City of Colorado Springs - (CO) | Power plant (Natural Gas) | 10.9 km | 54 MW | [6] |
| Ray D Nixon · City of Colorado Springs - (CO) | Power plant (Coal) | 18.4 km | 255 MW | [6] |
| Front Range Power Plant · City of Colorado Springs - (CO) | Power plant (Natural Gas) | 18.9 km | 460 MW | [6] |
| Palmer Solar · Duke Energy Renewables Services | Power plant (Solar) | 21 km | 60 MW | [6] |
| Tesla · City of Colorado Springs - (CO) | Power plant (Hydroelectric) | 23 km | 28 MW | [6] |
| Pike Solar Hybrid · Duke Energy Renewables Services | Power plant (Solar) | 25.6 km | 175 MW | [6] |
| Fountain Valley Power Facility · Fountain Valley Power LLC | Power plant (Natural Gas) | 27 km | 234 MW | [6] |
| Hancock Substation · Colorado Springs Utilities | Substation | 1.43 km | 34.5 kV | [1] |
| Atmel Substation · Colorado Springs Utilities | Substation | 1.52 km | 115 kV | [1] |
| Colorado Springs Utilities substation · Colorado Springs Utilities | Substation | 2.12 km | 34.5 kV | [1] |
| Kelker Substation · Colorado Springs Utilities | Substation | 2.89 km | 230 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| CSUT-2025-7 at Horizon Substation 230SPP CSUT-2025-7 | Gas | In study · proposed 2028-03 | 412 MW | [4] |
| CSU-2020-3 at Williams Creek Substation 230SPP CSU-2020-3 | Solar + storage | In study · proposed 2025-09 | 200 MW | [4] |
| CSUT-2025-8 at Horizon Substation 230SPP CSUT-2025-8 | Storage | IA signed · proposed 2028-01 | 100 MW | [4] |
| CSUT-2025-6 at South Plant Substation 115 via 34.5 FeedersSPP CSUT-2025-6 | Storage | In study · proposed 2027-12 | 100 MW | [4] |
| CSUT-2025-2 at Nixon Substation 230SPP CSUT-2025-2 | Solar | In study · proposed 2028-12 | 100 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
15| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | T5@Colorado Springsway/1083841125 name=T5@Colorado Springs | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Website | https://t5datacenters.com/locations/t5-colorado/ | [1] | Likely | 2026-09-27 | Shown |
| Address | 3323 Janitell Road, Colorado Springs, CO 80906 | [1] | Likely | 2026-09-27 | Shown |
| Utility | City of Colorado Springs - (CO)territory 3989: CITY OF COLORADO SPRINGS - (CO) (MUNICIPAL, CITY OF COLORADO SPR | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | WACM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Hancock Substation (34.5 kV)way/191650870 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1.4 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 912 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 9.54¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 13.81¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.45 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 74,400 sq ft | [1] derived | Likely | 2026-09-27 | Shown |