Unnamed data center — 16182 Commonwealth Avenue North
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityUnnamed data center — 16182 Commonwealth Avenue North
- →substationNot identifiedUnknownUnverifiedNo substation mapped within 3 km and none named in filings.
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 28.29402, -81.83484
- Address
- County
- Polk County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Tampa Electric CO.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
Control area of the containing utility territory.
- State avg. industrial price
Florida statewide average, July 2026.
- State avg. commercial price
Florida statewide average, July 2026.
- Generation within 50 km
29 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| C D Mcintosh Jr · City of Lakeland - (FL) | Power plant (Natural Gas) | 25.3 km | 614 MW | [5] |
| Osprey Energy Center Power Plant · Duke Energy Florida, LLC | Power plant (Natural Gas) | 27 km | 616 MW | [5] |
| Intercession City · Duke Energy Florida, LLC | Power plant (Natural Gas) | 28.2 km | 940 MW | [5] |
| Larsen Memorial · City of Lakeland - (FL) | Power plant (Natural Gas) | 28.6 km | 163 MW | [5] |
| Cane Island · Kissimmee Utility Authority | Power plant (Natural Gas) | 29.6 km | 679 MW | [5] |
| Orlando Cogen LP · Florida Municipal Power Agency | Power plant (Natural Gas) | 44.5 km | 120 MW | [5] |
| Orange Cogeneration Facility · Northern Star Generation Services Co LLC | Power plant (Natural Gas) | 47.1 km | 111 MW | [5] |
| Mulberry Cogeneration Facility · Florida Municipal Power Agency | Power plant (Natural Gas) | 49.7 km | 115 MW | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
9| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 16182 Commonwealth Avenue North, Polk City, FL 33868 | [1] | Likely | 2026-09-27 | Shown |
| Utility | Duke Energyterritory 6455: DUKE ENERGY FLORIDA, LLC (INVESTOR OWNED, DUKE ENERGY CORP) | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | FPC | [2] derived | Likely | — | Shown |
| State avg. industrial price | 9.17¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.37¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 4.05 GW | [5] derived | Confirmed | 202502 | Shown |
| Building footprint | 22,700 sq ft | [1] derived | Likely | 2026-09-27 | Shown |