DC
/

Unnamed data center

OperatingUnclassifiedBuildingFrederick County, Maryland
10% profile completeness
12 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
64,100 sq ft[1]
Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Potomac Edison · PJM
Substation: Unnamed substation (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Unnamed data center
  2. substation
    Unnamed substation[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.87 km away. Proximity does not establish that it serves the site.
  3. transmission
    230 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.93 km away). Not confirmed as the supply path.
  4. utility
    Potomac Edison[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[3]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
39.37780, -77.41168
County
Frederick County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.9 km[1]Likelyderived
Highest-voltage line nearby
230 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
16.21¢/kWh[5]Confirmed

Maryland statewide average, July 2026.

State avg. commercial price
17.51¢/kWh[5]Confirmed

Maryland statewide average, July 2026.

Generation within 50 km
1.37 GW[6]Confirmedderived

53 EIA-reported plants within 50 km.

Generation queued in county
152 MW[4]Confirmedderived

4 active generation interconnection requests in Frederick County: Solar 135 MW, Solar + storage 17 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
230 kV lineTransmission line0.93 km230 kV[1]
Fort Detrick Solar PV · Montevue Lane Solar, LLCPower plant (Solar)7.7 km22 MW[6]
Dickerson Power · Dickerson Power, LLCPower plant (Natural Gas)19.2 km299 MW[6]
Montgomery County Resource Recovery · Covanta Montgomery, Inc.Power plant (Biomass)20.1 km54 MW[6]
Baker Point · Cypress Creek RenewablesPower plant (Solar)21.8 km9 MW[6]
Mount Saint Mary'S · Constellation Solar Horizons LLCPower plant (Solar)33.5 km14 MW[6]
Maryland Solar · Arevon Energy, Inc.Power plant (Solar)33.6 km21 MW[6]
Potomac Energy Center, LLC · Potomac Energy Center LLCPower plant (Natural Gas)37.4 km766 MW[6]
Blake Solar Plant · Horus West Virginia 1, LLCPower plant (Solar)38.4 km80 MW[6]
Unnamed substationSubstation0.87 km—[1]
Unnamed substationSubstation0.98 km—[1]
Unnamed substationSubstation1.37 km—[1]
Lime Kiln SubstationSubstation2.7 km230 kV[1]
Unnamed substationSubstation2.8 km—[1]
Largest queued generation in this countyFuelQueue statusMWSource
Bedington Energy FacilityPJM AE2-333SolarIA signed · proposed 2025-10100 MW[4]
Legore Bridge Solar Center FacilityPJM AB1-124SolarIn study · proposed 2025-0920 MW[4]
Catoctin-Carroll 138 kVPJM AH2-262Solar + storageIn study · proposed 2026-0317 MW[4]
Biggs Ford Solar FacilityPJM AB1-125SolarIn study · proposed 2025-0915 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
64,100 sq ft[1]Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

12
FieldValueSourceConfidenceAs ofStatus
StatusOperating[1] derivedUnverified2026-09-27Shown
UtilityPotomac Edisonterritory 15263: THE POTOMAC EDISON COMPANY (INVESTOR OWNED, FIRSTENERGY CORP)[2] derivedLikely2022Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[3] derivedLikely—Shown
Balancing authorityPJM[2] derivedLikely—Shown
Nearest mapped substationUnnamed substationway/239525424[1] derivedLikely2026-09-28Shown
Distance to substation0.9 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby230 kV[1] derivedLikely2026-09-28Shown
Generation queued in county152 MW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price16.21¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price17.51¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km1.37 GW[6] derivedConfirmed202502Shown
Building footprint64,100 sq ft[1] derivedLikely2026-09-27Shown