Westin Building
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityWestin Building (SEA10)
- →substationWaterfront Streetcar Rectifier Sub. No. 20[1]Proximity onlyUnverifiedNearest mapped substation, 0.66 km away. Proximity does not establish that it serves the site.
- →transmission115 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.91 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 47.61439, -122.33893
- Address
- County
- King County
- CLLI code

Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: City of Milton - (Wa).
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Washington statewide average, July 2026.
- State avg. commercial price
Washington statewide average, July 2026.
- Generation within 50 km
13 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 115 kV line | Transmission line | 0.91 km | 115 kV | [1] |
| University of Washington Power Plant · University of Washington | Power plant (Petroleum) | 5.1 km | 15 MW | [5] |
| Snoqualmie 2 · Puget Sound Energy Inc | Power plant (Hydroelectric) | 38.1 km | 34 MW | [5] |
| Snoqualmie · Puget Sound Energy Inc | Power plant (Hydroelectric) | 38.5 km | 12 MW | [5] |
| South Fork Tolt · City of Seattle - (WA) | Power plant (Hydroelectric) | 42.7 km | 17 MW | [5] |
| Youngs Creek Hydroelectric Project · PUD No 1 of Snohomish County | Power plant (Hydroelectric) | 44.9 km | 8 MW | [5] |
| Cedar Falls (Wa) · City of Seattle - (WA) | Power plant (Hydroelectric) | 47.1 km | 30 MW | [5] |
| Calligan Creek Hydroelectric Project · PUD No 1 of Snohomish County | Power plant (Hydroelectric) | 48.8 km | 7 MW | [5] |
| Hancock Creek Hydroelectric Project · PUD No 1 of Snohomish County | Power plant (Hydroelectric) | 48.9 km | 7 MW | [5] |
| Waterfront Streetcar Rectifier Sub. No. 20 · King County Metro | Substation | 0.66 km | — | [1] |
| Denny Substation · Seattle City Light | Substation | 0.74 km | — | [1] |
| Denny Substation | Substation | 0.74 km | — | [1] |
| Union Street Substation | Substation | 0.81 km | — | [1] |
| Broad Street Substation · Seattle City Light | Substation | 0.94 km | 115 kV | [1] |
| Broad Street Substation Annex · Seattle City Light | Substation | 0.96 km | — | [1] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational1981[1]
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
All claims (provenance audit)
20| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Westin Buildingway/223928497 name=Westin Building | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-09-27 | Shown |
| Website | https://www.westinbldg.com/ | [1] | Likely | 2026-09-27 | Shown |
| Address | 2001 6th Avenue, Seattle, WA 98121 | [1] | Likely | 2026-09-27 | Shown |
| CLLI code | STTLWAWB | [1] | Likely | 2026-09-27 | Shown |
| Operator | Digital Realtyoperator=Digital Realty | [1] | Likely | 2026-09-27 | Shown |
| Utility | City of Seattle - (Wa)territory 16868: CITY OF SEATTLE - (WA) (MUNICIPAL, SEATTLE PUBLIC UTILITIES) | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | SCL | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Waterfront Streetcar Rectifier Sub. No. 20way/231362091 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.7 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 115 kV | [1] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 7.51¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.78¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 145 MW | [5] derived | Confirmed | 202502 | Shown |
| Floor area | 445,400 sq ft | [1] estimated | Unverified | 2026-09-27 | Shown |
| Building footprint | 13,100 sq ft | [1] derived | Likely | 2026-09-27 | Shown |
| Floors | 34building:levels=34 | [1] | Likely | 2026-09-27 | Shown |
| First operational | 1981start_date=1981 | [1] | Likely | 2026-09-27 | Shown |