  1. Mar 31, 2026
    Microsoft SAT14 · TX
    • Current IT capacity: 19 MW → 47 MW
    • Current facility power: 26 MW → 66 MW
    • Buildings operational: 1 → 2
    • Status: Operating + expanding → Operating
    • New capacity online: Building 2 fully operational, Building 1 expanded. Construction is already visibly complete. Additionally, construction phases Phase 2, Phase 3, and Phase 4 on TDLR that collectively represent the completion of the si…
    Source: Epoch AI
  2. Jul 1, 2024
    Microsoft SAT14 · TX
    • Buildings operational: 0 → 1
    • Status: Under construction → Operating + expanding
    • New capacity online: Building 1 operational. The first 2 data halls of Building 1 (with chillers already installed) are likely to be already operational. Although construction was completed prior, the on-site substation was previously inc…
    Source: Epoch AI