DC
/

Microsoft SAT14

OperatingAI campusCampusSan Antonio, Bexar County, Texas
60% profile completeness
40 claims from 12 sources
Current facility power
66 MW[1]
Likelyestimated
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Likelyderived
Capital cost / investment
$1.8B[1]
Likelyestimated
First operational
Jul 1, 2024[1]
Likelyderived

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Energized — operating
High confidence
Project verification
Verified operating
Operation documented by satellite imagery.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
CPS Energy (City of San Antonio) · ERCOT
Substation: On-site substation (likely Verde Circle Substation)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
66 MW[1]
Estimated from buildings observed operational
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionFeb 18, 2022
    Model estimate · Satellite imagery
    • Feb 18, 2022 · Reported status: under construction[1]
    • Feb 18, 2022 · Construction start[1]
    • Feb 18, 2022 · Land clearing for the site is almost complete. Informed using imagery on [Google Earth](https://earth.google.com/web/@29.476115,-98.68118,277.21295794a,724.52967601d,35y,0h,0t,0r/)[1]
    • Jul 1, 2024 · Reported status: expanding[1]
  3. EnergizationJul 1, 2024
    Satellite imagery
    • Jul 1, 2024 · Building 1 operational. The first 2 data halls of Building 1 (with chillers already installed) are likely to be already operational. Although construction was completed prior, the [1]
    • Mar 31, 2026 · Building 2 fully operational, Building 1 expanded. Construction is already visibly complete. Additionally, construction phases [Phase 2](https://www.tdlr.texas.gov/TABS/Search/Proj[1]
  4. OperationalJul 1, 2024
    Satellite imagery
    • Jul 1, 2024 · Building 1 operational. The first 2 data halls of Building 1 (with chillers already installed) are likely to be already operational. Although construction was completed prior, the [1]
    • Mar 31, 2026 · Building 2 fully operational, Building 1 expanded. Construction is already visibly complete. Additionally, construction phases [Phase 2](https://www.tdlr.texas.gov/TABS/Search/Proj[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.

Grid path

  1. facility
    Microsoft SAT14
  2. substation
    On-site substation (likely Verde Circle Substation)[1][5]
    Satellite imageryLikely
    1 substation outline traced inside the campus on satellite imagery; OSM maps Verde Circle Substation 0.27 km away
  3. transmission
    138 kV line[5]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.23 km away). Not confirmed as the supply path.
  4. utility
    CPS Energy (City of San Antonio)[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    ERCOT[4]
    Service territoryLikely
    Balancing authority: ERCO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
29.47624, -98.68107
Address
3545 Wiseman Boulevard, San Antonio, TX 78251[1]Likely
County
Bexar County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Owner
Microsoft[1]Confirmed
Utility

Most likely retail provider among 5 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Pedernales Electric Coop, INC, Guadalupe Valley Elec Coop INC, Karnes Electric Coop INC, Bandera Electric Coop, INC.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
66 MW[1]Likelyestimated

Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.

Current IT capacity
47 MW[1]Likelyestimated

Estimated IT load currently online, based on buildings observed operational.

Estimated annual consumption
405 GWh/yr[3]Speculativeestimated

66 MW × 8,760 h × 70% utilization.

Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
ERCOT[4]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
ERCO[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Verde Circle Substation (138 kV)[5]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.3 km[5]Likelyderived
Highest-voltage line nearby
138 kV[5]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
7.07¢/kWh[7]Confirmed

Texas statewide average, July 2026.

State avg. commercial price
8.47¢/kWh[7]Confirmed

Texas statewide average, July 2026.

Generation within 50 km
4.3 GW[8]Confirmedderived

22 EIA-reported plants within 50 km.

Generation queued in county
4.96 GW[6]Confirmedderived

21 active generation interconnection requests in Bexar County: Storage 4,771 MW, Solar 152 MW, Gas 35 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
138 kV lineTransmission line0.23 km138 kV[5]
Leon Creek · City of San Antonio - (TX)Power plant (Natural Gas)17.1 km184 MW[8]
Oci Alamo Solar I Hybrid · OCI Energy LLCPower plant (Solar)32.3 km41 MW[8]
Oci Alamo 4, LLC · Consolidated Edison Development Inc.Power plant (Solar)37 km40 MW[8]
Ebony Energy Storage · Ebony Energy Storage, LLCPower plant (Batteries)37.1 km200 MW[8]
Arthur Von Rosenberg · City of San Antonio - (TX)Power plant (Natural Gas)37.7 km518 MW[8]
V H Braunig · City of San Antonio - (TX)Power plant (Natural Gas)37.9 km1.05 GW[8]
O W Sommers · City of San Antonio - (TX)Power plant (Natural Gas)39.3 km830 MW[8]
J K Spruce · City of San Antonio - (TX)Power plant (Coal)39.6 km1.35 GW[8]
Verde Circle Substation · CPS EnergySubstation0.27 km138 kV[5]
VLSI Substation · CPS EnergySubstation0.39 km138 kV[5]
Westover Hills Substation · CPS EnergySubstation1.4 km138 kV[5]
Largest queued generation in this countyFuelQueue statusMWSource
Howard Road BESSERCOT 29INR0173 · Project Fast Flow LLCStorageIn study · proposed 2028-04618 MW[6]
Orbit Energy StorageERCOT 27INR0082 · GCI Orbit Energy Storage, LLCStorageIn study · proposed 2027-06502 MW[6]
Bernice Energy StorageERCOT 27INR0294 · Bernice Energy Storage LLCStorageIn study · proposed 2029-02403 MW[6]
Mission Station Energy Storage IERCOT 28INR0474 · Mission Station LLCStorageIn study · proposed 2030-05375 MW[6]
Mission Station Energy Storage IIERCOT 28INR0475 · Mission Station LLCStorageIn study · proposed 2030-05375 MW[6]
Quela BESSERCOT 22INR0423 · BRP Quela BESS LLCStorageIn study · proposed 2027-12301 MW[6]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    Feb 18, 2022[1]
  5. First operational
    Jul 1, 2024[1]
  6. Expected completion
    —
Buildings (planned)
2[1]Likelyderived

Count of building outlines traced on satellite imagery.

Buildings operational
2[1]Likelyestimated
PhaseStatusAdded MWCompleted / expectedSource
Building 1operational26 MWJul 1, 2024[1]
Building 2operational40 MWMar 31, 2026[1]

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Capital cost / investment
$1.8B[1]Likelyestimated

Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

Compute

Chip types
H100, B300[1]Confirmed
Compute (H100-equivalents)
45,200[1]Likelyestimated

What changed (last 3 years)

Follow this facility (RSS)
  • Current IT capacity
    19 MWJul 1, 2024[1]→47 MWMar 31, 2026[1]
  • Current facility power
    26 MWJul 1, 2024[1]→66 MWMar 31, 2026[1]
  • Buildings operational
    0Feb 18, 2022[1]→1Jul 1, 2024[1]→2Mar 31, 2026[1]
  • Status
    Under constructionFeb 18, 2022[1]→Operating + expandingJul 1, 2024[1]→OperatingMar 31, 2026[1]

Timeline

Construction start: Feb 18, 2022[1]
First operational: Jul 1, 2024[1]
  1. Feb 18, 2022[1]

    Land clearing for the site is almost complete. Informed using imagery on Google Earth

  2. Jul 1, 202426 MW facility power· 1 buildings operational[1]

    Building 1 operational. The first 2 data halls of Building 1 (with chillers already installed) are likely to be already operational. Although construction was completed prior, the on-site substation was previously incomplete, so we believe it was only operational at this point.

  3. Aug 3, 202526 MW facility power· 1 buildings operational[1]

    Building 2 chiller installation is a little more than halfway complete, and chiller installation for the last data hall of Building 1 is also around halfway complete.

  4. Feb 28, 202626 MW facility power· 1 buildings operational[1]

    No more visible construction around either building, just a little equipment. Roads fully built around buildings as well.

  5. Mar 31, 202666 MW facility power· 2 buildings operational[1]

    Building 2 fully operational, Building 1 expanded. Construction is already visibly complete. Additionally, construction phases Phase 2, Phase 3, and Phase 4 on TDLR that collectively represent the completion of the site have a completion date of 2026-03-31.

All claims (provenance audit)

40
FieldValueSourceConfidenceAs ofStatus
NameMicrosoft SAT14[1] Likely2026-03-31Shown
StatusUnder construction[1] derivedLikely2022-02-18Superseded / alternative
StatusOperating + expanding[1] derivedLikely2024-07-01Superseded / alternative
StatusOperating + expanding[1] derivedLikely2025-08-03Superseded / alternative
StatusOperating + expanding[1] derivedLikely2026-02-28Superseded / alternative
StatusOperating[1] derivedLikely2026-03-31Shown
Facility typeAI campus[1] derivedLikely2026-03-31Shown
Address3545 Wiseman Boulevard, San Antonio, TX 78251[1] Likely2026-03-31Shown
OwnerMicrosoftOwner: Microsoft[1] Confirmed2026-03-31Shown
UtilityCPS Energy (City of San Antonio)territory 16604: CITY OF SAN ANTONIO - (TX) (MUNICIPAL, CITY OF SAN ANTONIO - (T[2] derivedUnverified2022Shown
Current facility power66 MW[1] estimatedLikely2026-03-31Shown
Current facility power26 MW[1] estimatedLikely2024-07-01Superseded / alternative
Current facility power26 MW[1] estimatedLikely2025-08-03Superseded / alternative
Current facility power26 MW[1] estimatedLikely2026-02-28Superseded / alternative
Current IT capacity47 MW[1] estimatedLikely2026-03-31Shown
Current IT capacity19 MW[1] estimatedLikely2024-07-01Superseded / alternative
Current IT capacity19 MW[1] estimatedLikely2025-08-03Superseded / alternative
Current IT capacity19 MW[1] estimatedLikely2026-02-28Superseded / alternative
Estimated annual consumption405 GWh/yr[3] estimatedSpeculative2026-09-29Shown
ISO / RTOERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.[4] derivedLikely—Shown
Balancing authorityERCO[2] derivedLikely—Shown
Nearest mapped substationVerde Circle Substation (138 kV)way/1344369108[5] derivedLikely2026-09-28Shown
Distance to substation0.3 km[5] derivedLikely2026-09-28Shown
Highest-voltage line nearby138 kV[5] derivedLikely2026-09-28Shown
Generation queued in county4.96 GW[6] derivedConfirmed2026-09-01Shown
State avg. industrial price7.07¢/kWh[7] Confirmed2026-07Shown
State avg. commercial price8.47¢/kWh[7] Confirmed2026-07Shown
Generation within 50 km4.3 GW[8] derivedConfirmed202502Shown
Buildings (planned)2[1] derivedLikely2026-03-31Shown
Buildings operational2[1] estimatedLikely2026-03-31Shown
Buildings operational0[1] estimatedLikely2022-02-18Superseded / alternative
Buildings operational1[1] estimatedLikely2024-07-01Superseded / alternative
Buildings operational1[1] estimatedLikely2025-08-03Superseded / alternative
Buildings operational1[1] estimatedLikely2026-02-28Superseded / alternative
Capital cost / investment$1.8B[1] estimatedLikely2026-03-31Shown
Compute (H100-equivalents)45,200[1] estimatedLikely2026-03-31Shown
Chip typesH100[1] Confirmed2026-03-31Shown
Chip typesB300[1] Confirmed2026-03-31Shown
Construction startFeb 18, 2022[1] derivedLikely2026-03-31Shown
First operationalJul 1, 2024[1] derivedLikely2026-03-31Shown