  1. Jul 3, 2026
    CoreWeave Denton TX · TX
    • Current IT capacity: 131 MW → 262 MW
    • Current facility power: 183 MW → 367 MW
    • Buildings operational: 4 → 7
    • New capacity online: Buildings 1-7 are operational and running, with no construction work visible. This is based on both satellite imagery, and the Q2 2026 Earnings call stating the campus was operational by midyear 2026.
    Source: Epoch AI
  2. Feb 23, 2026
    CoreWeave Denton TX · TX
    • Current IT capacity: 67 MW → 131 MW
    • Current facility power: 94 MW → 183 MW
    • Buildings operational: 3 → 4
    • New capacity online: Buildings 1-3 (Denton North) are largely built out/operational, and Denton South has its first data hall plus support equipment substantially installed. Remaining Denton South buildings (4-7) still under construction.…
    Source: Epoch AI
  3. Dec 31, 2025
    CoreWeave Denton TX · TX
    • Current IT capacity: 8 MW → 67 MW
    • Current facility power: 11 MW → 94 MW
    • Buildings operational: 1 → 3
    • New capacity online: Half the campus energized. 67 billable MW are now dedicated to CoreWeave's GPUs across three buildings.
    Source: Epoch AI
  4. May 31, 2025
    CoreWeave Denton TX · TX
    • Buildings operational: 0 → 1
    • Status: Under construction → Operating + expanding
    • New capacity online: First 8 MW billable tranche dedicated to AI starts running at the site, with another 40 scheduled by the end of the quarter.
    Source: Epoch AI
  5. Nov 1, 2024
    CoreWeave Denton TX · TX
    • Construction started: Construction start - The Texas Department of Licensing and Regulation reports Core Scientific is converting existing Bitcoin mining buildings into AI data centers, planning to build AROUND the existing Denton Energy C…
    Source: Epoch AI