RSS / Atom feed for this viewCapacity, status, permit, grid-request and construction changes over the last three years, each with its source. A change means the same source reported a new value later; two sources disagreeing is not a change. Subscribe to the feed in any RSS reader to follow a facility, state or company.
- Aug 2, 2026Meta Sarpy · NE
- Buildings operational: 0 → 1
- Status: Under construction → Operating
- New capacity online: Building 1 is operational (estimate).
Source: Epoch AI - Jun 30, 2026Google Omaha · NE
- Current IT capacity: 158 MW → 237 MW
- Current facility power: 189 MW → 284 MW
- Buildings operational: 2 → 3
- New capacity online: Building 3 is operational (estimate). Based on there being minimal construction work as of May 15.
Source: Epoch AI - May 4, 2026
- Nov 19, 2024Google Omaha · NE
- Current IT capacity: 79 MW → 158 MW
- Current facility power: 95 MW → 189 MW
- Buildings operational: 1 → 2
- New capacity online: Building 2 is operational, based on it being 8 months since the roof was complete, and surrounding infrastructure looks just completed (finishing the cooling towers).
Source: Epoch AI - Aug 3, 2024Google Papillion · NE
- Current IT capacity: 79 MW → 237 MW
- Current facility power: 95 MW → 284 MW
- Buildings operational: 1 → 3
- New capacity online: Building 3 looks operational.
Source: Epoch AI - Aug 1, 2024
- Apr 8, 2024Google Omaha · NE
- Buildings operational: 0 → 1
- Status: Under construction → Operating + expanding
- New capacity online: Building 1 operational, based on it being 6 months after roof was complete, infrastructure looked complete for 5 months.
Source: Epoch AI