Meta Sarpy
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.
Grid path
- →facilityMeta Sarpy
- →substationOn-site substation[1]Satellite imageryLikely1 substation outline traced inside the campus on satellite imagery
- →transmission161 kV line[5]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.27 km away). Not confirmed as the supply path.
- →utilityOmaha Public Power District[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 41.10625, -96.14434
- Address
- County
- Sarpy County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developer
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workload
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
Power (all fields)
- Current facility power
Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.
- Current IT capacity
Estimated IT load currently online, based on buildings observed operational.
- Estimated annual consumption
105 MW × 8,760 h × 70% utilization.
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Nebraska statewide average, July 2026.
- State avg. commercial price
Nebraska statewide average, July 2026.
- Generation within 50 km
16 EIA-reported plants within 50 km.
- Generation queued in county
1 active generation interconnection requests in Sarpy County: Other 258 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 161 kV line | Transmission line | 0.27 km | 161 kV | [5] |
| 69 kV line | Transmission line | 0.49 km | 69 kV | [5] |
| Sarpy County · Omaha Public Power District | Power plant (Natural Gas) | 16.2 km | 316 MW | [8] |
| Platteview Solar LLC · AES Distributed Energy | Power plant (Solar) | 21.8 km | 81 MW | [8] |
| Cass County · Omaha Public Power District | Power plant (Natural Gas) | 23.2 km | 324 MW | [8] |
| Jones Street · Omaha Public Power District | Power plant (Petroleum) | 24.6 km | 124 MW | [8] |
| Walter Scott Jr Energy Center · MidAmerican Energy Co | Power plant (Coal) | 26.7 km | 1.51 GW | [8] |
| North Omaha · Omaha Public Power District | Power plant (Coal) | 29.9 km | 564 MW | [8] |
| Lon Wright · City of Fremont - (NE) | Power plant (Coal) | 44.6 km | 159 MW | [8] |
| Terry Bundy Generating Station · Lincoln Electric System | Power plant (Natural Gas) | 45 km | 171 MW | [8] |
| 150th St & Capehart Rd Substation · Omaha Public Power District | Substation | 1.19 km | 161 kV | [5] |
| Hwy 50 Substation · Omaha Public Power District | Substation | 2.16 km | 161 kV | [5] |
| Unnamed substation | Substation | 2.25 km | 161 kV | [5] |
| Unnamed substation | Substation | 2.33 km | 161 kV | [5] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| GEN-2020-031 at Substation 1363; 161kV SubstationSPP GEN-2020-031 | Other | IA signed · proposed 2028-02 | 258 MW | [6] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
Real estate
None sourced yet
None sourced yet
None sourced yet
- Capital cost / investment
Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
Compute
What changed (last 3 years)
Follow this facility (RSS)Timeline
Buildings on this campus
2- Meta Sarpy Data centerOperating · 625,900 sq ft footprint
- Meta Sarpy Data centerOperating · 286,500 sq ft footprint
All claims (provenance audit)
30| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Meta Sarpy | [1] | Likely | 2026-08-02 | Shown |
| Status | Under construction | [1] derived | Likely | 2024-08-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2026-05-04 | Superseded / alternative |
| Status | Operating | [1] derived | Likely | 2026-08-02 | Shown |
| Facility type | AI campus | [1] derived | Likely | 2026-08-02 | Shown |
| Address | 14436-14998 Fairview Rd, Springfield, NE 68059, USA | [1] | Likely | 2026-08-02 | Shown |
| Owner | MetaOwner: Meta | [1] | Confirmed | 2026-08-02 | Shown |
| End users | MetaUsers: Meta | [1] | Confirmed | 2026-08-02 | Shown |
| Utility | Omaha Public Power Districtterritory 14127: OMAHA PUBLIC POWER DISTRICT (POLITICAL SUBDIVISION, OMAHA PUBLI | [2] derived | Likely | 2022 | Shown |
| Current facility power | 105 MW | [1] estimated | Likely | 2026-08-02 | Shown |
| Current IT capacity | 80 MW | [1] estimated | Likely | 2026-08-02 | Shown |
| Estimated annual consumption | 644 GWh/yr | [3] estimated | Speculative | 2026-09-29 | Shown |
| ISO / RTO | SPPSOUTHWEST POWER POOL | [4] derived | Likely | — | Shown |
| Balancing authority | SWPP | [2] derived | Likely | — | Shown |
| Nearest mapped substation | 150th St & Capehart Rd Substation (161 kV)way/1204409596 | [5] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1.2 km | [5] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 161 kV | [5] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 258 MW | [6] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 10.00¢/kWh | [7] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 9.39¢/kWh | [7] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 3.29 GW | [8] derived | Confirmed | 202502 | Shown |
| Buildings (planned) | 1 | [1] derived | Likely | 2026-08-02 | Shown |
| Buildings operational | 1 | [1] estimated | Likely | 2026-08-02 | Shown |
| Buildings operational | 0 | [1] estimated | Likely | 2024-08-01 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2026-05-04 | Superseded / alternative |
| Capital cost / investment | $3B | [1] estimated | Likely | 2026-08-02 | Shown |
| Compute (H100-equivalents) | 92,000 | [1] estimated | Likely | 2026-08-02 | Shown |
| Chip types | B300 | [1] | Confirmed | 2026-08-02 | Shown |
| Construction start | Aug 1, 2024 | [1] derived | Likely | 2026-08-02 | Shown |
| First operational | Aug 2, 2026 | [1] derived | Likely | 2026-08-02 | Shown |