Alpha Federal
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityAlpha Federal
- →substationUnnamed substation[1]Proximity onlyUnverifiedNearest mapped substation, 0.79 km away. Proximity does not establish that it serves the site.
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →utilityAmerican Electric Power[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Street address- Coordinates
- 38.35318, -81.69618
- Address
- County
- Kanawha County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Black Diamond Power CO.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- State avg. industrial price
West Virginia statewide average, July 2026.
- State avg. commercial price
West Virginia statewide average, July 2026.
- Generation within 50 km
5 EIA-reported plants within 50 km.
- Generation queued in county
5 active generation interconnection requests in Kanawha County: Solar + storage 495 MW, Solar 100 MW, Storage 100 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Marmet · Appalachian Power Co | Power plant (Hydroelectric) | 15.7 km | 14 MW | [6] |
| John E Amos · Appalachian Power Co | Power plant (Coal) | 17.3 km | 2.9 GW | [6] |
| Winfield · Appalachian Power Co | Power plant (Hydroelectric) | 27.1 km | 19 MW | [6] |
| London · Appalachian Power Co | Power plant (Hydroelectric) | 33.5 km | 14 MW | [6] |
| Glen Ferris Hydro · Hawks Nest Hydro LLC | Power plant (Hydroelectric) | 47.8 km | 6 MW | [6] |
| Unnamed substation | Substation | 0.79 km | — | [1] |
| Unnamed substation | Substation | 1.11 km | — | [1] |
| Unnamed substation | Substation | 1.69 km | — | [1] |
| Unnamed substation | Substation | 2.06 km | — | [1] |
| Unnamed substation | Substation | 2.5 km | — | [1] |
| Unnamed substation | Substation | 2.53 km | — | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Jones Branch 138 kVPJM AH1-426 | Solar + storage | In study · proposed 2023-12 | 200 MW | [4] |
| Cabin Creek 138 kVPJM AH2-043 | Solar + storage | In study · proposed 2025-12 | 200 MW | [4] |
| Kanawha River - Carbondale 138 kVPJM AG2-656 | Solar | In study · proposed 2024-12 | 100 MW | [4] |
| Cabin Creek 138 kVPJM AH2-278 | Storage | In study · proposed 2024-03 | 100 MW | [4] |
| Cabin Creek 138 kVPJM AH2-209 | Solar + storage | In study · proposed 2024-03 | 95 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
14| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Alpha Federalnode/13546262077 name=Alpha Federal | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Website | https://myalphainnovations.com/ | [1] | Likely | 2026-09-27 | Shown |
| Address | 2020 Union Carbide Drive, Unit 6000, South Charleston, WV 25303 | [1] | Likely | 2026-09-27 | Shown |
| Operator | Alpha Innovationsoperator=Alpha Innovations | [1] | Likely | 2026-09-27 | Shown |
| Utility | American Electric Powerterritory 733: APPALACHIAN POWER CO (INVESTOR OWNED, AMERICAN ELECTRIC POWER CO) | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substationway/441580336 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.8 km | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 695 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 8.40¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.44¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 2.95 GW | [6] derived | Confirmed | 202502 | Shown |