DC
/

West Virginia

Facilities
2
0 campuses
Power online
0 MW
0 sites reporting
Under construction
0 MW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
0
0 MW online · 0 MW pipeline
AI compute
—
H100-equivalents (est.)
Capital (reported + est.)
—

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 8.40¢/kWh (EIA).

Construction pipeline by expected completion

MW from phases with a projected completion date

No dated pipeline yet.

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced—
  • Interconnection requests—
  • Contracted / approved—
  • Under construction—
  • Operational—
Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented

No large gaps in this scope.

Unverified: 2

Interconnection queues

Active requests to connect to the grid (PJM). Requests are applications, not commitments — most never get built.

Generation seeking interconnection22.65 GW · 113 requests
Solar + storage 6.47 GWGas 5.22 GWSolar 4.45 GWStorage 2.69 GWWind 2.43 GWCoal 1.36 GW

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned

None identified.

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • PJM— · 2 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline

Facilities by status

  • Operating2