Barclays Datacenter
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityBarclays Datacenter
- →substationAldene Substation (230 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 1.39 km away. Proximity does not establish that it serves the site.
- →transmissionWestfield - Aldene 230 kV transmission line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.92 km away). Not confirmed as the supply path.
- →utilityNot identifiedUnknownUnverified
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
ApproximateLocation is approximate (approximate); the marker does not identify the exact site.
- Coordinates
- 40.64379, -74.28545
- County
- Union County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
New Jersey statewide average, July 2026.
- State avg. commercial price
New Jersey statewide average, July 2026.
- Generation within 50 km
289 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Westfield - Aldene 230 kV transmission line · Public Service Enterprise Group | Transmission line | 0.92 km | 230 kV | [1] |
| Aldene - Warinanco 230 kV transmission line · Public Service Enterprise Group | Transmission line | 1.16 km | 230 kV | [1] |
| Linden Cogen Plant · EFS Cogen Holdings I LLC | Power plant (Natural Gas) | 6 km | 904 MW | [5] |
| Pseg Linden Generating Station · Linden Combined Cycle | Power plant (Natural Gas) | 7 km | 1.64 GW | [5] |
| Arthur Kill Generating Station · NRG Arthur Kill Operations Inc | Power plant (Natural Gas) | 9.3 km | 896 MW | [5] |
| Woodbridge Energy Center · Woodbridge Energy Center | Power plant (Natural Gas) | 14.6 km | 727 MW | [5] |
| Red Oak Power LLC · Red Oak Operating Services LLC | Power plant (Natural Gas) | 22.3 km | 776 MW | [5] |
| Bergen Generating Station · Bergen Generating Station | Power plant (Natural Gas) | 30.8 km | 1.26 GW | [5] |
| Ravenswood · Ravenswood Operations LLC | Power plant (Natural Gas) | 31.4 km | 1.96 GW | [5] |
| Astoria Generating Station · U S Power Generating Company LLC | Power plant (Natural Gas) | 35.3 km | 1.32 GW | [5] |
| Aldene Substation · Public Service Enterprise Group | Substation | 1.39 km | 230 kV | [1] |
| Public Service Enterprise Group substation · Public Service Enterprise Group | Substation | 1.85 km | 26 kV | [1] |
| Roselle Substation · Public Service Enterprise Group | Substation | 2.24 km | 26 kV | [1] |
| Clark Substation · Public Service Enterprise Group | Substation | 2.39 km | 26 kV | [1] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
11| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Barclays Datacenterrelation/15884451 name=Barclays Datacenter | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Operator | Barclaysoperator=Barclays | [1] | Likely | 2026-09-27 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [2] derived | Likely | — | Shown |
| Balancing authority | PJM | [3] derived | Likely | — | Shown |
| Nearest mapped substation | Aldene Substation (230 kV)way/896271688 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1.4 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 15.63¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 19.17¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 17.52 GW | [5] derived | Confirmed | 202502 | Shown |