Facilities
62
2 campuses
Power online
70 MW
1 sites reporting
Under construction
0 MW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
2
70 MW online · 0 MW pipeline
AI compute
0.06M
H100-equivalents (est.)
Capital (reported + est.)
$1.9B

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 15.63¢/kWh (EIA).

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW18 MW35 MW53 MW70 MW202720282029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

No dated pipeline yet.

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced70 MW
  • Interconnection requests—
  • Contracted / approved—
  • Under construction—
  • Operational70 MW
Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented

No large gaps in this scope.

Verified operating: 1Announced only: 1Unverified: 60

Interconnection queues

Active requests to connect to the grid (NYISO, PJM). Requests are applications, not commitments — most never get built.

Generation seeking interconnection39.47 GW · 159 requests
Offshore wind 28.41 GWStorage 4.97 GWGas 2.27 GWSolar 1.69 GWWind 1.34 GWHydro 450 MW

30 MW of data-center load across 1 project-level load requests (NYISO publishes these individually; most ISOs don't).

Markets

Click through to drill down

Online Under construction + planned
NameFacilitiesOnlinePipeline
New York / New Jersey49——

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • PJM70 MW + 0 MW · 61 sites
  • NYISO— · 1 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
Microsoft-Nebius New JerseyOperating70 MW—

Facilities by status

  • Operating61
  • Unknown1