New Jersey
Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 15.63¢/kWh (EIA).
AI data center capacity over time
Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly
Construction pipeline by expected completion
MW from phases with a projected completion date
No dated pipeline yet.
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
- Announced70 MW
- Interconnection requests—
- Contracted / approved—
- Under construction—
- Operational70 MW
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
No large gaps in this scope.
Interconnection queues
Active requests to connect to the grid (NYISO, PJM). Requests are applications, not commitments — most never get built.
30 MW of data-center load across 1 project-level load requests (NYISO publishes these individually; most ISOs don't).
Markets
Click through to drill down
| Name | Facilities | Online | Pipeline | |
|---|---|---|---|---|
| New York / New Jersey | 49 | — | — |
Largest operators & owners
Online + pipeline MW at linked facilities
- Nebius70 MW + 0 MW · 2 sites
- Equinix— · 7 sites
- Digital Realty— · 6 sites
- Centersquare— · 2 sites
- Barclays— · 2 sites
- QTS Data Centers— · 2 sites
- CyrusOne— · 2 sites
- CoreSite— · 2 sites
- Verizon— · 2 sites
- H5 Data Centers— · 1 sites
- AT&T— · 1 sites
- Tishman— · 1 sites
Largest customers & end users
Tenants and workload owners, where sourced
- Microsoft70 MW + 0 MW · 1 sites
Utility exposure
Most likely retail utility by location (approximate)
- City of Vineland - (Nj)70 MW + 0 MW · 2 sites
- PSE&G— · 46 sites
- Jersey Central Power & Light— · 9 sites
- Atlantic City Electric CO— · 2 sites
- Orange & Rockland Utils INC— · 1 sites
Grid operators (ISO / RTO)
By facility location
- PJM70 MW + 0 MW · 61 sites
- NYISO— · 1 sites
Largest facilities
By online + pipeline MW
| Facility | Status | Online | Pipeline |
|---|---|---|---|
| Microsoft-Nebius New Jersey | Operating | 70 MW | — |
Facilities by status
- Operating61
- Unknown1