Brandaleone Lab for Data and Visualization
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityBrandaleone Lab for Data and Visualization
- →substationSub 2 (100 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.55 km away. Proximity does not establish that it serves the site.
- →transmission100 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.97 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Street address- Coordinates
- 36.00310, -78.93853
- County
- Durham County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Duke Energy Progress - (Nc).
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
North Carolina statewide average, July 2026.
- State avg. commercial price
North Carolina statewide average, July 2026.
- Generation within 50 km
40 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 100 kV line | Transmission line | 0.97 km | 100 kV | [1] |
| Univ of Nc Chapel Hill Cogen Facility · University of North Carolina | Power plant (Natural Gas) | 15.4 km | 32 MW | [5] |
| White Cross Farm · Strata Manager, LLC | Power plant (Solar) | 24.9 km | 5 MW | [5] |
| Mile Farm · Palmetto Power Management LLC | Power plant (Solar) | 25.3 km | 5 MW | [5] |
| Ncsu Cates Cogeneration Plant · NC State University, Energy Systems | Power plant (Natural Gas) | 34 km | 9 MW | [5] |
| Ncsu Ccup Cogeneration Plant · NC State University, Energy Systems | Power plant (Natural Gas) | 34.8 km | 6 MW | [5] |
| Harris · Duke Energy Progress - (NC) | Power plant (Nuclear) | 41.1 km | 964 MW | [5] |
| Currin Solar, LLC · Cypress Creek Renewables | Power plant (Solar) | 42 km | 5 MW | [5] |
| Snow Camp Solar, LLC · Cypress Creek Renewables | Power plant (Solar) | 46.4 km | 5 MW | [5] |
| Sub 2 | Substation | 0.55 km | 100 kV | [1] |
| Sub 1 | Substation | 0.63 km | — | [1] |
| Sub 5 · Duke University | Substation | 0.64 km | 100 kV | [1] |
| Sub 4 | Substation | 0.7 km | 100 kV | [1] |
| Sub 3 | Substation | 0.83 km | 100 kV | [1] |
| Unnamed substation | Substation | 0.99 km | 100 kV | [1] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
13| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Brandaleone Lab for Data and Visualizationnode/10567817971 name=Brandaleone Lab for Data and Visualization | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Description | The Brandaleone Lab for Data and Visualization Services (https://library.duke.edu/data/about/lab) provides research computing for projects involving data analytics, data visualization, digital mapping and statistics. Computers in the lab are available for | [1] | Likely | 2026-09-27 | Shown |
| Operator | Duke Librariesoperator=Duke Libraries | [1] | Likely | 2026-09-27 | Shown |
| Utility | Duke Energyterritory 5416: DUKE ENERGY CAROLINAS, LLC (INVESTOR OWNED, DUKE ENERGY CORP) | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | DUK | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Sub 2 (100 kV)way/1111754511 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.6 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 100 kV | [1] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 8.37¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 10.73¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.14 GW | [5] derived | Confirmed | 202502 | Shown |