North Carolina
Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 8.37¢/kWh (EIA).
AI data center capacity over time
Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly
Construction pipeline by expected completion
MW from phases with a projected completion date
No dated pipeline yet.
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
- Announced—
- Interconnection requests—
- Contracted / approved—
- Under construction—
- Operational91 MW
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
No large gaps in this scope.
Interconnection queues
Active requests to connect to the grid (PJM). Requests are applications, not commitments — most never get built.
Markets
Click through to drill down
| Name | Facilities | Online | Pipeline | |
|---|---|---|---|---|
| Charlotte & Western Carolinas | 16 | — | — |
Largest operators & owners
Online + pipeline MW at linked facilities
- CoreWeave91 MW + 0 MW · 1 sites
- Meta— · 4 sites
- Flexential— · 3 sites
- CyrusOne— · 2 sites
- Duke Libraries— · 1 sites
- TierPoint— · 1 sites
Largest customers & end users
Tenants and workload owners, where sourced
None identified.
Utility exposure
Most likely retail utility by location (approximate)
- Duke Energy91 MW + 0 MW · 27 sites
Grid operators (ISO / RTO)
By facility location
- None (non-RTO region)91 MW + 0 MW · 27 sites
Largest facilities
By online + pipeline MW
| Facility | Status | Online | Pipeline |
|---|---|---|---|
| CoreWeave Marble NC | Operating | 91 MW | — |
Facilities by status
- Operating27