North Carolina

Facilities
27
1 campuses
Power online
91 MW
1 sites reporting
Under construction
0 MW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
1
91 MW online · 0 MW pipeline
AI compute
0.08M
H100-equivalents (est.)
Capital (reported + est.)
$2.5B

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 8.37¢/kWh (EIA).

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW25 MW50 MW75 MW100 MW2026202720282029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

No dated pipeline yet.

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced—
  • Interconnection requests—
  • Contracted / approved—
  • Under construction—
  • Operational91 MW
Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented

No large gaps in this scope.

Verified operating: 1Unverified: 26

Interconnection queues

Active requests to connect to the grid (PJM). Requests are applications, not commitments — most never get built.

Generation seeking interconnection6.76 GW · 65 requests
Solar 4.84 GWStorage 1.22 GWWind 528 MWSolar + storage 170 MW

Markets

Click through to drill down

Online Under construction + planned
NameFacilitiesOnlinePipeline
Charlotte & Western Carolinas16——

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned

None identified.

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • None (non-RTO region)91 MW + 0 MW · 27 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
CoreWeave Marble NCOperating91 MW—

Facilities by status

  • Operating27