Cherokee Data Center
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityCherokee Data Center
- →substationCherokee Data Center Substation (138 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.41 km away. Proximity does not establish that it serves the site.
- →transmissionIgloo Valley-Tulsa North (345 kV)[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.59 km away). Not confirmed as the supply path.
- →utilityPublic Service CO of Oklahoma[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 36.26251, -95.91031
- Address
- County
- Tulsa County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Verdigris Valley Elec Coop INC.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Oklahoma statewide average, July 2026.
- State avg. commercial price
Oklahoma statewide average, July 2026.
- Generation within 50 km
8 EIA-reported plants within 50 km.
- Generation queued in county
5 active generation interconnection requests in Tulsa County: Storage 749 MW, Other 100 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 138 kV line · Public Service Company of Oklahoma | Transmission line | 0.42 km | 138 kV | [1] |
| Igloo Valley-Tulsa North · Grand River Dam Authority | Transmission line | 0.59 km | 345 kV | [1] |
| Covanta Tulsa Renewable Energy LLC · Covanta Tulsa Renewable Energy LLC | Power plant (Biomass) | 17.4 km | 16 MW | [6] |
| Tulsa · Public Service Co of Oklahoma | Power plant (Natural Gas) | 17.8 km | 330 MW | [6] |
| Northeastern · Public Service Co of Oklahoma | Power plant (Natural Gas) | 26.6 km | 1.34 GW | [6] |
| Tulsa Lfg LLC · Tulsa LFG LLC | Power plant (Biomass) | 27.2 km | 3 MW | [6] |
| Riverside (Ok) · Public Service Co of Oklahoma | Power plant (Natural Gas) | 29.7 km | 1.07 GW | [6] |
| Green Country Energy LLC · Green Country OP Services LLC | Power plant (Natural Gas) | 31.1 km | 783 MW | [6] |
| Keystone Dam · USCE-Tulsa District | Power plant (Hydroelectric) | 33.1 km | 80 MW | [6] |
| Oneta Energy Center · Oneta Power LLC | Power plant (Natural Gas) | 33.8 km | 1.09 GW | [6] |
| Cherokee Data Center Substation | Substation | 0.41 km | 138 kV | [1] |
| Cherokee Industrial Park Substation | Substation | 0.51 km | 138 kV | [1] |
| Whirpool Substation | Substation | 0.66 km | 138 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| GEN-2024-171 at Tulsa North - Grand River Energy Center 345 kV LineSPP GEN-2024-171 | Storage | In study · proposed 2028-05 | 250 MW | [4] |
| GEN-2018-028 at Tulsa North 138kV SubstationSPP GEN-2018-028 | Storage | IA signed · proposed 2028-11 | 200 MW | [4] |
| GEN-2024-318 at Tulsa North - American Airlines 138 kV LineSPP GEN-2024-318 | Storage | In study · proposed 2028-12 | 199 MW | [4] |
| GEN-2025-SR21 at Tulsa Power Station 138kV SubstationSPP GEN-2025-SR21 | Other | In study · proposed 2028-05 | 100 MW | [4] |
| GEN-2018-027 at Tulsa Power Station 138kV SubstationSPP GEN-2018-027 | Storage | IA signed · proposed 2028-05 | 100 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
14| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Cherokee Data Centerway/195664350 name=Cherokee Data Center | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 7400 North Lakewood Avenue, Tulsa, OK 74073 | [1] | Likely | 2026-09-27 | Shown |
| Utility | Public Service CO of Oklahomaterritory 15474: PUBLIC SERVICE CO OF OKLAHOMA (INVESTOR OWNED, AMERICAN ELECTRI | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | SPPSOUTHWEST POWER POOL | [3] derived | Likely | — | Shown |
| Balancing authority | SWPP | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Cherokee Data Center Substation (138 kV)way/725194842 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.4 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 345 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 849 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 8.16¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 10.32¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 4.71 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 415,700 sq ft | [1] derived | Likely | 2026-09-27 | Shown |