DC
/

Oklahoma

Facilities
13
2 campuses
Power online
442 MW
1 sites reporting
Under construction
181 MW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
2
442 MW online · 181 MW pipeline
AI compute
0.64M
H100-equivalents (est.)
Capital (reported + est.)
$13.9B

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 8.16¢/kWh (EIA).

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW175 MW350 MW525 MW700 MW20252026202720282029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

2026
2027

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced181 MW
  • Interconnection requests—
  • Contracted / approved—
  • Under construction181 MW
  • Operational442 MW
Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented

No large gaps in this scope.

Verified operating: 1Under construction: 1Unverified: 11

Interconnection queues

Active requests to connect to the grid (SPP). Requests are applications, not commitments — most never get built.

Generation seeking interconnection40.04 GW · 197 requests
Storage 10.15 GWGas 8.52 GWSolar 7.53 GWWind 6.28 GWSolar + storage 3.67 GWOther 2.55 GWHybrid 900 MWCoal 450 MW

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned

None identified.

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • SPP442 MW + 181 MW · 13 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
Google Pryor (North)Operating442 MW—
CoreWeave Muskogee OKUnder construction—181 MW

Facilities by status

  • Operating12
  • Under construction1