CyrusOne CHI3
Part of CyrusOne — Aurora, IL campus
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityCyrusOne CHI3
- →substationGFX Data Center Substation (138 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.32 km away. Proximity does not establish that it serves the site.
- →transmissionNelson - Junction 345 kV & Plano - Junction 345 kV & Junction - Sugar Grove 138 kV[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.13 km away). Not confirmed as the supply path.
- →utilityCommonwealth Edison (ComEd)[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 41.79541, -88.24687
- County
- DuPage County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Illinois statewide average, July 2026.
- State avg. commercial price
Illinois statewide average, July 2026.
- Generation within 50 km
60 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Nelson - Junction 345 kV & Plano - Junction 345 kV & Junction - Sugar Grove 138 kV · Commonwealth Edison | Transmission line | 0.13 km | 345 kV | [1] |
| Plano - Junction 345 kV & Junction - Sugar Grove 138 kV · Commonwealth Edison | Transmission line | 0.15 km | 345 kV | [1] |
| 345 kV line · Commonwealth Edison | Transmission line | 0.28 km | 345 kV | [1] |
| Wolfs Crossing - Junction 345 kV · Commonwealth Edison | Transmission line | 1.1 km | 345 kV | [1] |
| Lombard - Junction 345 kV · Commonwealth Edison | Transmission line | 1.18 km | 345 kV | [1] |
| Junction - Aurora 345 kV & Junction - Wayne 345 kV · Commonwealth Edison | Transmission line | 1.21 km | 345 kV | [1] |
| Aurora · Aurora Generation LLC | Power plant (Natural Gas) | 2.8 km | 991 MW | [5] |
| Mrp Elgin LLC · Lincoln Operating Services, LLC | Power plant (Natural Gas) | 22.8 km | 489 MW | [5] |
| Mrp Rocky Road LLC · Lincoln Operating Services, LLC | Power plant (Natural Gas) | 33.1 km | 336 MW | [5] |
| Kendall County Generation Facility · Dynegy Kendall Energy LLC | Power plant (Natural Gas) | 35.1 km | 1.14 GW | [5] |
| Elwood Energy LLC · Elwood Energy LLC | Power plant (Natural Gas) | 41 km | 1.35 GW | [5] |
| Jackson Generation, LLC · Jackson Generation, LLC | Power plant (Natural Gas) | 41.3 km | 1.19 GW | [5] |
| Dresden Generating Station · Constellation Nuclear | Power plant (Nuclear) | 45.1 km | 1.8 GW | [5] |
| Cpv Three Rivers Energy Center · CPV Three Rivers, LLC | Power plant (Natural Gas) | 47.2 km | 1.22 GW | [5] |
| GFX Data Center Substation · Commonwealth Edison | Substation | 0.32 km | 138 kV | [1] |
| Electric Junction Substation · Commonwealth Edison | Substation | 1.15 km | 345 kV | [1] |
| Commonwealth Edison substation · Commonwealth Edison | Substation | 2.65 km | 345 kV | [1] |
| Commonwealth Edison substation · Commonwealth Edison | Substation | 2.92 km | 34.5 kV | [1] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
3- CyrusOne CHI2Operating · 216,500 sq ft footprint
- CyrusOne CHI3Operating · 213,000 sq ft footprint
- CyrusOne CHI1Operating · 277,100 sq ft footprint
All claims (provenance audit)
14| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-09-27 | Shown |
| Website | https://www.cyrusone.com/data-centers/north-america/aurora-il | [1] | Likely | 2026-09-27 | Shown |
| Operator | CyrusOneoperator=CyrusOne | [1] | Likely | 2026-09-27 | Shown |
| Utility | Commonwealth Edison (ComEd)territory 4110: COMMONWEALTH EDISON CO (INVESTOR OWNED, EXELON CORP) | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | GFX Data Center Substation (138 kV)way/486721268 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.3 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 345 kV | [1] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 11.87¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 15.19¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 9.21 GW | [5] derived | Confirmed | 202502 | Shown |
| Building footprint | 169,400 sq ft | [1] derived | Likely | 2026-09-27 | Shown |