Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 11.87¢/kWh (EIA).
Construction pipeline by expected completion
MW from phases with a projected completion date
No dated pipeline yet.
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
- Announced1 GW
- Interconnection requests—
- Contracted / approved—
- Under construction—
- Operational—
1 GW announced at 1 site has no grid, construction or operating record yet.
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
Interconnection queues
Active requests to connect to the grid (MISO, PJM). Requests are applications, not commitments — most never get built.
Markets
Click through to drill down
| Name | Facilities | Online | Pipeline | |
|---|---|---|---|---|
| Chicago | 50 | — | — |
Largest operators & owners
Online + pipeline MW at linked facilities
- Digital Realty— · 6 sites
- CyrusOne— · 4 sites
- NTT Global Data Centers— · 4 sites
- Centersquare— · 3 sites
- Equinix— · 3 sites
- Meta— · 3 sites
- CoreSite— · 2 sites
- EdgeConneX— · 2 sites
- Element Critical— · 2 sites
- Microsoft— · 2 sites
- Stream Data Centers— · 2 sites
- Aligned Data Centers— · 2 sites
Largest customers & end users
Tenants and workload owners, where sourced
None identified.
Utility exposure
Most likely retail utility by location (approximate)
- Commonwealth Edison (ComEd)— · 54 sites
- Ameren Illinois Company— · 2 sites
Grid operators (ISO / RTO)
By facility location
- PJM— · 54 sites
- MISO— · 2 sites
Largest facilities
By online + pipeline MW
| Facility | Status | Online | Pipeline |
|---|
Facilities by status
- Operating55
- Unknown1