DC
/

CyrusOne Cincinnati-Hamilton CIN4

OperatingColocationBuildingButler County, Ohio
20% profile completeness
15 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Duke Energy · PJM
Substation: Unnamed substation (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    CyrusOne Cincinnati-Hamilton CIN4
  2. substation
    Unnamed substation[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.67 km away. Proximity does not establish that it serves the site.
  3. transmission
    Not identified
    UnknownUnverified
    No transmission line mapped within 2 km.
  4. utility
    Duke Energy[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[3]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
39.38575, -84.56669
County
Butler County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:
Duke Energy[2]Unverified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Operator
Utility
Duke Energy[2]Unverified

Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: City of Hamilton - (Oh).

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.7 km[1]Likelyderived
State avg. industrial price
10.95¢/kWh[5]Confirmed

Ohio statewide average, July 2026.

State avg. commercial price
14.06¢/kWh[5]Confirmed

Ohio statewide average, July 2026.

Generation within 50 km
4.83 GW[6]Confirmedderived

21 EIA-reported plants within 50 km.

Generation queued in county
305 MW[4]Confirmedderived

7 active generation interconnection requests in Butler County: Solar 255 MW, Solar + storage 50 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Madison · Duke Energy Indiana, LLCPower plant (Natural Gas)11.5 km566 MW[6]
Woodsdale · Duke Energy Kentucky IncPower plant (Natural Gas)11.5 km476 MW[6]
Dick'S Creek · Luminant Dick's CreekPower plant (Natural Gas)18.5 km136 MW[6]
Middletown Energy Center · Ohio Power Partners, LLCPower plant (Natural Gas)20.8 km468 MW[6]
Miami Fort · Luminant Miami FortPower plant (Coal)36.6 km1.08 GW[6]
Yankee Street · Kimura Power LLCPower plant (Natural Gas)39.3 km128 MW[6]
Lawrenceburg Power, LLC · Lawrenceburg Power, LLCPower plant (Natural Gas)41.7 km1.19 GW[6]
Tait Electric Generating Station · Kimura Power LLCPower plant (Natural Gas)48.7 km607 MW[6]
Unnamed substationSubstation0.67 km—[1]
Unnamed substationSubstation1.28 km—[1]
Unnamed substationSubstation1.74 km—[1]
Unnamed substationSubstation1.98 km—[1]
Unnamed substationSubstation2.62 km—[1]
Unnamed substationSubstation2.71 km—[1]
Largest queued generation in this countyFuelQueue statusMWSource
Springfield Road - Springfield Road 69 kVPJM AH1-516SolarIn study · proposed 2025-0770 MW[4]
Collinsville - Springfield Road 69 kVPJM AI1-092SolarIn study · proposed 2025-0750 MW[4]
Locust - Todd 69 kVPJM AI1-150Solar + storageIn study · proposed 2027-0150 MW[4]
Woodsdale Renewable Energy CenterPJM AE2-267SolarIA signed · proposed 2026-0649 MW[4]
Miller - Canal 69kVPJM AH1-333SolarIn study · proposed 2024-0448 MW[4]
Fairfield – Reily 69 kVPJM AH1-530SolarIn study · proposed 2025-0328 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Site area
35.5 acres[1]Likelyderived

Area of the mapped OSM site outline.

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

15
FieldValueSourceConfidenceAs ofStatus
NameCyrusOne Cincinnati-Hamilton CIN4way/1346610234 name=CyrusOne Cincinnati-Hamilton CIN4[1] Likely2026-09-27Shown
StatusOperating[1] derivedUnverified2026-09-27Shown
Facility typeColocation[1] derivedUnverified2026-09-27Shown
Websitehttps://www.cyrusone.com/data-centers/north-america/ohio/cin4-hamilton[1] Likely2026-09-27Shown
OperatorCyrusOneoperator=CyrusOne[1] Likely2026-09-27Shown
UtilityDuke Energyterritory 3542: DUKE ENERGY OHIO INC (INVESTOR OWNED, DUKE ENERGY CORP)[2] derivedUnverified2022Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[3] derivedLikely—Shown
Balancing authorityPJM[2] derivedLikely—Shown
Nearest mapped substationUnnamed substationway/204237156[1] derivedLikely2026-09-28Shown
Distance to substation0.7 km[1] derivedLikely2026-09-28Shown
Generation queued in county305 MW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price10.95¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price14.06¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km4.83 GW[6] derivedConfirmed202502Shown
Site area35.5 acres[1] derivedLikely2026-09-27Shown