DC
/

Ohio

Facilities
99
9 campuses
Power online
1.83 GW
5 sites reporting
Under construction
1.8 GW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
7
1.83 GW online · 1.8 GW pipeline
AI compute
1.59M
H100-equivalents (est.)
Capital (reported + est.)
$56.2B
$11.45B assessed

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 10.95¢/kWh (EIA).

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW1 GW2 GW3 GW4 GW202420252026202720282029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

2026
2027
2028

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced3.72 GW
  • Interconnection requests—
  • Contracted / approved—
  • Under construction1.8 GW
  • Operational1.83 GW

650 MW announced at 2 sites has no grid, construction or operating record yet.

Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented
Verified operating: 66Under construction: 2Announced only: 2Unverified: 29

Interconnection queues

Active requests to connect to the grid (PJM). Requests are applications, not commitments — most never get built.

Generation seeking interconnection72.08 GW · 433 requests
Solar 44.42 GWStorage 12.24 GWSolar + storage 5.67 GWGas 5.03 GWCoal 2.71 GWWind 1.98 GW

Markets

Click through to drill down

Online Under construction + planned
NameFacilitiesOnlinePipeline
Columbus & Central Ohio781.83 GW933 MW

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned
  • Meta645 MW + 1.25 GW · 2 sites
  • OpenAI0 MW + 300 MW · 1 sites

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • PJM1.83 GW + 1.8 GW · 99 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
Meta PrometheusOperating + expanding645 MW683 MW
Meta Bowling GreenUnder construction—570 MW
Google ColumbusOperating + expanding364 MW100 MW
AWS New AlbanyOperating + expanding255 MW150 MW
Google New AlbanyOperating400 MW—
OpenAI Stargate LordstownUnder construction—300 MW
Google LancasterOperating164 MW—

Facilities by status

  • Operating92
  • Operating + expanding3
  • Under construction2
  • Unknown2