DC
/

Dakota Carrier Network

OperatingUnclassifiedBuildingCass County, North Dakota
10% profile completeness
11 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Not identified · MISO
Substation: Sheyenne Substation (230 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Dakota Carrier Network
  2. substation
    Sheyenne Substation (230 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 2.22 km away. Proximity does not establish that it serves the site.
  3. transmission
    Sheyenne - Audubon 230kV[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.44 km away). Not confirmed as the supply path.
  4. utility
    Not identified
    UnknownUnverified
  5. ISO / RTO
    MISO[2]
    Service territoryLikely
    Balancing authority: MISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Approximate

Location is approximate (approximate); the marker does not identify the exact site.

Coordinates
46.81510, -96.84431
County
Cass County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Not identified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence

No tenants or end users identified in our sources yet.

No ownership information sourced yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
MISO[2]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
MISO[3]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Sheyenne Substation (230 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
2.2 km[1]Likelyderived
Highest-voltage line nearby
230 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
8.21¢/kWh[5]Confirmed

North Dakota statewide average, July 2026.

State avg. commercial price
8.22¢/kWh[5]Confirmed

North Dakota statewide average, July 2026.

Generation within 50 km
76 MW[6]Confirmedderived

12 EIA-reported plants within 50 km.

Generation queued in county
1.28 GW[4]Confirmedderived

5 active generation interconnection requests in Cass County: Hybrid 481 MW, Solar 400 MW, Wind 200 MW, Storage 200 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Sheyenne - Audubon 230kV · Otter Tail Power CompanyTransmission line0.44 km230 kV[1]
West Fargo-Saunders 69kV Transmission Line · Minnkota Power CooperativeTransmission line0.99 km69 kV[1]
Mapleton-Sheyenne 115kV Transmission Line · Otter Tail Power CompanyTransmission line1.26 km115 kV[1]
Fargo-Morris 230kV Transmission Line · Western Area Power AdministrationTransmission line1.66 km230 kV[1]
Centennial Generating Station · City of Moorhead - (MN)Power plant (Petroleum)9.4 km10 MW[6]
American Crystal Sugar Moorhead · American Crystal Sugar CoPower plant (Coal)11.6 km5 MW[6]
Moorhead Wind Turbine · City of Moorhead - (MN)Power plant (Wind)12.2 km1 MW[6]
Kindred School · Kindred Public SchoolPower plant (Petroleum)22.3 km2 MW[6]
Uss Buckaroo Solar LLC Csg · Standard SolarPower plant (Solar)31.7 km1 MW[6]
Uss Horne North Solar LLC Csg · Standard SolarPower plant (Solar)36 km1 MW[6]
Agassiz Beach LLC · CHI Operations IncPower plant (Wind)37.6 km2 MW[6]
Lakeswind Power Partners · Lakeswind Power PartnersPower plant (Wind)49.4 km50 MW[6]
Sheyenne Substation · Xcel EnergySubstation2.22 km230 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
J3163 at BISONMISO J3163HybridIn study · proposed 2028-03481 MW[4]
J3833 at Buffalo 115 kVMISO J3833WindIn study · proposed 2028-09200 MW[4]
J3522 at BisonMISO J3522SolarIn study · proposed 2028-08200 MW[4]
J1588 at BISONMISO J1588SolarIA signed · proposed 2023-09200 MW[4]
S1079 at BISONMISO S1079StorageIn study · proposed 2028-07200 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

11
FieldValueSourceConfidenceAs ofStatus
NameDakota Carrier Networkrelation/19390019 name=Dakota Carrier Network[1] Likely2026-09-27Shown
StatusOperating[1] derivedUnverified2026-09-27Shown
ISO / RTOMISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC..[2] derivedLikely—Shown
Balancing authorityMISO[3] derivedLikely—Shown
Nearest mapped substationSheyenne Substation (230 kV)way/125417221[1] derivedLikely2026-09-28Shown
Distance to substation2.2 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby230 kV[1] derivedLikely2026-09-28Shown
Generation queued in county1.28 GW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price8.21¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price8.22¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km76 MW[6] derivedConfirmed202502Shown