DC
/

North Dakota

Facilities
5
2 campuses
Power online
88 MW
1 sites reporting
Under construction
442 MW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
1
88 MW online · 442 MW pipeline
AI compute
0.09M
H100-equivalents (est.)
Capital (reported + est.)
$2.6B

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 8.21¢/kWh (EIA).

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW150 MW300 MW450 MW600 MW2026202720282029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

2026
2027

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced960 MW
  • Interconnection requests—
  • Contracted / approved—
  • Under construction455 MW
  • Operational88 MW

430 MW announced at 1 site has no grid, construction or operating record yet.

Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented
Verified operating: 1Announced only: 1Unverified: 3

Interconnection queues

Active requests to connect to the grid (MISO, PJM, SPP). Requests are applications, not commitments — most never get built.

Generation seeking interconnection8.75 GW · 38 requests
Gas 2.99 GWWind 2.28 GWStorage 1.36 GWSolar 882 MWHybrid 653 MWUnknown 579 MW

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned

None identified.

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • SPP88 MW + 442 MW · 3 sites
  • MISO— · 2 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
CoreWeave Ellendale NDOperating + expanding88 MW442 MW

Facilities by status

  • Operating3
  • Operating + expanding1
  • Unknown1