Digital Crossroad
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityDigital Crossroad
- →substationState Line Substation (138 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.15 km away. Proximity does not establish that it serves the site.
- →transmissionBurnham - Calumet 345 kV[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.39 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 41.70740, -87.51997
- Address
- County
- Lake County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Indiana statewide average, July 2026.
- State avg. commercial price
Indiana statewide average, July 2026.
- Generation within 50 km
63 EIA-reported plants within 50 km.
- Generation queued in county
9 active generation interconnection requests in Lake County: Storage 800 MW, Solar 600 MW, Unknown 100 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Burnham - Calumet 345 kV · Commonwealth Edison | Transmission line | 0.39 km | 345 kV | [1] |
| 345 kV line | Transmission line | 0.46 km | 345 kV | [1] |
| Burnham - Calumet 345 kV & State Line - Harbor 138 kV · Commonwealth Edison | Transmission line | 0.47 km | 345 kV | [1] |
| Burnham - State Line 345 kV | Transmission line | 0.49 km | 345 kV | [1] |
| Burnham - State Line 345 kV & 138 kV · Commonwealth Edison | Transmission line | 1.66 km | 345 kV | [1] |
| Burnham - Calumet 345 kV & Burnham - State Line 138 kV · Commonwealth Edison | Transmission line | 1.66 km | 345 kV | [1] |
| Calumet Energy Team LLC · IPA Operations Inc - Calumet | Power plant (Natural Gas) | 4 km | 326 MW | [6] |
| Whiting Clean Energy · BP Alternative Energy | Power plant (Natural Gas) | 5.1 km | 513 MW | [6] |
| Fisk Street · Midwest Generations EME LLC | Power plant (Petroleum) | 19.4 km | 197 MW | [6] |
| Crete Energy Venture LLC · Earthrise Energy, PBC | Power plant (Natural Gas) | 32 km | 300 MW | [6] |
| Arcelormittal Burns Harbor · Cleveland-Cliffs Burns Harbor LLC | Power plant (Other) | 32.7 km | 175 MW | [6] |
| University Park North · LSP University Park LLC | Power plant (Natural Gas) | 35.2 km | 540 MW | [6] |
| University Park South · University Park Energy LLC | Power plant (Natural Gas) | 35.4 km | 300 MW | [6] |
| Lincoln Generating Facility · Earthrise Energy, PBC | Power plant (Natural Gas) | 49.6 km | 623 MW | [6] |
| State Line Substation · Commonwealth Edison | Substation | 0.15 km | 138 kV | [1] |
| Unnamed substation | Substation | 0.24 km | — | [1] |
| State Line Substation · Commonwealth Edison | Substation | 0.31 km | — | [1] |
| Unnamed substation | Substation | 0.41 km | 138 kV | [1] |
| State Line Substation · Commonwealth Edison | Substation | 0.47 km | 345 kV | [1] |
| Unnamed substation | Substation | 1.88 km | 69 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| J1058 at Schahfer-St. John 345kV Line TapMISO J1058 | Solar | Under construction · proposed 2021-10 | 300 MW | [7] |
| J2215 at SCHAHFER GEN STA - ST. JOHN 345.0kVMISO J2215 | Storage | In study · proposed 2024-09 | 300 MW | [7] |
| Olive-Reynolds 345 kVPJM AE2-045 | Solar | IA signed · proposed 2022-12 | 200 MW | [4] |
| Lake - 270888 345kVPJM AI2-023 | Storage | In study · proposed 2028-12 | 200 MW | [4] |
| R5076 at SCHAHFER GEN STA - ST. JOHN 345.0kVMISO R5076 | Storage | In study · proposed 2024-06 | 200 MW | [7] |
| J1386 at Green Acres 138 kV SubstationMISO J1386 | Solar | IA signed · proposed 2022-07 | 100 MW | [7] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
16| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Digital Crossroadway/978934687 name=Digital Crossroad | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Website | https://digitalcrossroad.com/data-centers/indiana-data-center/ | [1] | Likely | 2026-09-27 | Shown |
| Address | 100 Digital Crossroad Drive, Hammond, IN 46320 | [1] | Likely | 2026-09-27 | Shown |
| Operator | Digital Crossroadoperator=Digital Crossroad | [1] | Likely | 2026-09-27 | Shown |
| Utility | NIPSCOterritory 13756: NORTHERN INDIANA PUB SERV CO (INVESTOR OWNED, NISOURCE INC) | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | MISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC.. | [3] derived | Likely | — | Shown |
| Balancing authority | MISO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | State Line Substation (138 kV)way/978934685 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.2 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 345 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.5 GW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 9.16¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 13.30¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 3.81 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 116,100 sq ft | [1] derived | Likely | 2026-09-27 | Shown |