Equinix Chicago Data CH7
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityEquinix Chicago Data CH7
- →substationWestmont Substation[1]Proximity onlyUnverifiedNearest mapped substation, 0.87 km away. Proximity does not establish that it serves the site.
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →utilityCommonwealth Edison (ComEd)[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 41.81263, -87.97294
- County
- DuPage County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- State avg. industrial price
Illinois statewide average, July 2026.
- State avg. commercial price
Illinois statewide average, July 2026.
- Generation within 50 km
70 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Aurora · Aurora Generation LLC | Power plant (Natural Gas) | 21 km | 991 MW | [5] |
| Mrp Elgin LLC · Lincoln Operating Services, LLC | Power plant (Natural Gas) | 30.7 km | 489 MW | [5] |
| Jackson Generation, LLC · Jackson Generation, LLC | Power plant (Natural Gas) | 43.1 km | 1.19 GW | [5] |
| Elwood Energy LLC · Elwood Energy LLC | Power plant (Natural Gas) | 43.4 km | 1.35 GW | [5] |
| Whiting Clean Energy · BP Alternative Energy | Power plant (Natural Gas) | 43.9 km | 513 MW | [5] |
| Kendall County Generation Facility · Dynegy Kendall Energy LLC | Power plant (Natural Gas) | 44 km | 1.14 GW | [5] |
| University Park North · LSP University Park LLC | Power plant (Natural Gas) | 45.1 km | 540 MW | [5] |
| Lincoln Generating Facility · Earthrise Energy, PBC | Power plant (Natural Gas) | 46.7 km | 623 MW | [5] |
| Westmont Substation · Commonwealth Edison | Substation | 0.87 km | — | [1] |
| Electric Substation · Commonwealth Edison | Substation | 2.73 km | — | [1] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
14| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Equinix Chicago Data CH7way/243242167 name=Equinix Chicago Data CH7 | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-09-27 | Shown |
| Website | https://www.equinix.com/locations/united-states-colocation/chicago-data-centers/ch7/ | [1] | Likely | 2026-09-27 | Shown |
| Operator | Equinixoperator=Equinix | [1] | Likely | 2026-09-27 | Shown |
| Utility | Commonwealth Edison (ComEd)territory 4110: COMMONWEALTH EDISON CO (INVESTOR OWNED, EXELON CORP) | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Westmont Substationway/561175271 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.9 km | [1] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 11.87¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 15.19¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 8.7 GW | [5] derived | Confirmed | 202502 | Shown |
| Building footprint | 47,400 sq ft | [1] derived | Likely | 2026-09-27 | Shown |