DC
/

Equinix Secaucus NY6

OperatingColocationBuildingHudson County, New Jersey

Part of Equinix — Secaucus, NJ campus

20% profile completeness
15 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
71,000 sq ft[1]
Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
PSE&G · PJM
Substation: Penhorn Substation (230 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Equinix Secaucus NY6
  2. substation
    Penhorn Substation (230 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 2.16 km away. Proximity does not establish that it serves the site.
  3. transmission
    Belleville - Marion (230 kV)[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.96 km away). Not confirmed as the supply path.
  4. utility
    PSE&G[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[3]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
40.77764, -74.07269
County
Hudson County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:
PSE&G[2]Likely

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Operator
Utility
PSE&G[2]Likely

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Penhorn Substation (230 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
2.2 km[1]Likelyderived
Highest-voltage line nearby
230 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
15.63¢/kWh[5]Confirmed

New Jersey statewide average, July 2026.

State avg. commercial price
19.17¢/kWh[5]Confirmed

New Jersey statewide average, July 2026.

Generation within 50 km
19.92 GW[6]Confirmedderived

273 EIA-reported plants within 50 km.

Generation queued in county
360 MW[4]Confirmedderived

3 active generation interconnection requests in Hudson County: Storage 360 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Belleville - Marion · Public Service Enterprise GroupTransmission line0.96 km230 kV[1]
138 kV line · AmtrakTransmission line1.41 km138 kV[1]
Bergen Generating Station · Bergen Generating StationPower plant (Natural Gas)7.8 km1.26 GW[6]
Ravenswood · Ravenswood Operations LLCPower plant (Natural Gas)10.9 km1.96 GW[6]
Astoria Generating Station · U S Power Generating Company LLCPower plant (Natural Gas)13.5 km1.32 GW[6]
Linden Cogen Plant · EFS Cogen Holdings I LLCPower plant (Natural Gas)20.2 km904 MW[6]
Pseg Linden Generating Station · Linden Combined CyclePower plant (Natural Gas)20.7 km1.64 GW[6]
Arthur Kill Generating Station · NRG Arthur Kill Operations IncPower plant (Natural Gas)23.3 km896 MW[6]
Red Oak Power LLC · Red Oak Operating Services LLCPower plant (Natural Gas)43.4 km776 MW[6]
Bowline Point · Bowline, LLCPower plant (Natural Gas)48.2 km1.16 GW[6]
Penhorn Substation · Public Service Enterprise GroupSubstation2.16 km230 kV[1]
Amtrak Substation 42 · AmtrakSubstation2.51 km—[1]
Homestead Substation · Public Service Enterprise GroupSubstation2.57 km230 kV[1]
Union City Substation · PSE&GSubstation2.77 km69 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
Hudson Energy Storage FacilityPJM AF1-245StorageIA signed · proposed 2028-12200 MW[4]
Two Rivers StoragePJM AF2-415StorageIA signed · proposed 2028-05150 MW[4]
Railroad Avenue Energy StoragePJM AF2-416StorageSuspended · proposed 2026-0610 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
71,000 sq ft[1]Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

Other buildings on this campus

4

All claims (provenance audit)

15
FieldValueSourceConfidenceAs ofStatus
NameEquinix Secaucus NY6way/714139865 name=Equinix Secaucus NY6[1] Likely2026-09-27Shown
StatusOperating[1] derivedUnverified2026-09-27Shown
Facility typeColocation[1] derivedUnverified2026-09-27Shown
OperatorEquinixoperator=Equinix[1] Likely2026-09-27Shown
UtilityPSE&Gterritory 15477: PUBLIC SERVICE ELEC & GAS CO (INVESTOR OWNED, PUBLIC SERVICE EN[2] derivedLikely2022Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[3] derivedLikely—Shown
Balancing authorityPJM[2] derivedLikely—Shown
Nearest mapped substationPenhorn Substation (230 kV)way/95782054[1] derivedLikely2026-09-28Shown
Distance to substation2.2 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby230 kV[1] derivedLikely2026-09-28Shown
Generation queued in county360 MW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price15.63¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price19.17¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km19.92 GW[6] derivedConfirmed202502Shown
Building footprint71,000 sq ft[1] derivedLikely2026-09-27Shown