Expedient Pittsburgh South
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityExpedient Pittsburgh South
- →substationWest End Substation[1]Proximity onlyUnverifiedNearest mapped substation, 1.18 km away. Proximity does not establish that it serves the site.
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 40.42739, -80.04242
- Address
- County
- Allegheny County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Pennsylvania Power CO.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- State avg. industrial price
Pennsylvania statewide average, July 2026.
- State avg. commercial price
Pennsylvania statewide average, July 2026.
- Generation within 50 km
21 EIA-reported plants within 50 km.
- Generation queued in county
17 active generation interconnection requests in Allegheny County: Storage 667 MW, Solar 224 MW, Hydro 64 MW, Wind 55 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Brunot Island · Brunot Island Power, LLC | Power plant (Natural Gas) | 4.2 km | 262 MW | [6] |
| Mon Valley Works · United States Steel-Mon Valley | Power plant (Other) | 16.2 km | 62 MW | [6] |
| Clairton Works · United States Steel- Clairton | Power plant (Other) | 18.9 km | 24 MW | [6] |
| Allegheny Energy Units 3 4 & 5 · Springdale Energy LLC | Power plant (Natural Gas) | 26.6 km | 563 MW | [6] |
| Springdale 1 & 2 · Springdale Energy LLC | Power plant (Natural Gas) | 26.7 km | 97 MW | [6] |
| Shell Chemical Appalachia LLC · Shell Chemical Appalachia LLC | Power plant (Natural Gas) | 36.8 km | 257 MW | [6] |
| Beaver Valley · Energy Harbor Nuclear Generation LLC | Power plant (Nuclear) | 39.5 km | 1.81 GW | [6] |
| Tenaska Westmoreland Generating Station · Tenaska Pennsylvania Partners, LLC | Power plant (Natural Gas) | 40.6 km | 947 MW | [6] |
| West End Substation | Substation | 1.18 km | — | [1] |
| Port Authority of Allegheny County substation · Port Authority of Allegheny County | Substation | 2.95 km | — | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Springdale 138kVPJM AH1-562 | Storage | In study · proposed 2025-06 | 356 MW | [4] |
| Beech Hollow SolarPJM AG1-527 | Solar | In study · proposed 2028-07 | 215 MW | [4] |
| SpringdalePJM AG1-514 | Storage | In study · proposed 2024-06 | 106 MW | [4] |
| Pine Creek 138 kVPJM AH1-615 | Storage | In study · proposed 2025-10 | 100 MW | [4] |
| Brunot Island 138 kVPJM AG1-485 | Storage | In study · proposed 2024-06 | 55 MW | [4] |
| Dans MountainPJM S14 | Wind | Under construction · proposed 2025-03 | 55 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
15| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Expedient Pittsburgh Southway/537807168 name=Expedient Pittsburgh South | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Website | https://www.expedient.com/data-centers/pittsburgh/ | [1] | Likely | 2026-09-27 | Shown |
| Address | 810 Parish Street, Pittsburgh, PA 15220 | [1] | Likely | 2026-09-27 | Shown |
| Operator | Expedientoperator=Expedient | [1] | Likely | 2026-09-27 | Shown |
| Utility | Duquesne Light COterritory 5487: DUQUESNE LIGHT CO (INVESTOR OWNED, DUQUESNE LIGHT HOLDINGS) | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | West End Substationway/317315595 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1.2 km | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.05 GW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 11.04¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 13.86¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 4.12 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 27,500 sq ft | [1] derived | Likely | 2026-09-27 | Shown |