DC
/

Pennsylvania

Facilities
51
3 campuses
Power online
139 MW
1 sites reporting
Under construction
197 MW
planned MW at active sites
Planned
—
2 planned sites (MW not disclosed)
AI campuses
2
139 MW online · 197 MW pipeline
AI compute
0.08M
H100-equivalents (est.)
Capital (reported + est.)
$4.1B

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 11.04¢/kWh (EIA).

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW100 MW200 MW300 MW400 MW2026202720282029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

2027

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced2.43 GW
  • Interconnection requests750 MW
  • Contracted / approved300 MW
  • Under construction197 MW
  • Operational139 MW

1.35 GW announced at 1 site has no grid, construction or operating record yet.

Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented
Verified operating: 1Under construction: 1Documented development: 2Announced only: 1Unverified: 46

Interconnection queues

Active requests to connect to the grid (NYISO, PJM). Requests are applications, not commitments — most never get built.

Generation seeking interconnection36.12 GW · 534 requests
Solar 15.51 GWStorage 9.2 GWSolar + storage 6.22 GWNuclear 2.71 GWWind 1.45 GWGas 938 MW

750 MW of data-center load across 2 project-level load requests (NYISO publishes these individually; most ISOs don't).

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • PJM139 MW + 197 MW · 49 sites
  • NYISO— · 2 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
AWS BerwickOperating + expanding139 MW73 MW
CoreWeave Lancaster Greenfield siteUnder construction—124 MW

Facilities by status

  • Operating46
  • Operating + expanding1
  • Under construction1
  • Planned2
  • Unknown1