DC
/

ForceAmp.com

OperatingUnclassifiedBuildingJohnson County, Iowa
10% profile completeness
12 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
2,700 sq ft[1]
Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
MidAmerican Energy · MISO
Substation: Coralville North Substation (Linn County REC) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    ForceAmp.com
  2. substation
    Coralville North Substation (Linn County REC)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.25 km away. Proximity does not establish that it serves the site.
  3. transmission
    Not identified
    UnknownUnverified
    No transmission line mapped within 2 km.
  4. utility
    MidAmerican Energy[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    MISO[3]
    Service territoryLikely
    Balancing authority: MISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
41.70400, -91.58708
County
Johnson County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Most likely retail provider among 3 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Interstate Power and Light CO, Linn County REC.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
MISO[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
MISO[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Coralville North Substation (Linn County REC)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.3 km[1]Likelyderived
State avg. industrial price
9.99¢/kWh[5]Confirmed

Iowa statewide average, July 2026.

State avg. commercial price
13.27¢/kWh[5]Confirmed

Iowa statewide average, July 2026.

Generation within 50 km
1.12 GW[6]Confirmedderived

24 EIA-reported plants within 50 km.

Generation queued in county
153 MW[4]Confirmedderived

3 active generation interconnection requests in Johnson County: Solar 151 MW, Other 2 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Coralville Gt · MidAmerican Energy CoPower plant (Natural Gas)4.1 km63 MW[6]
University of Iowa Main Power Plant · University of IowaPower plant (Natural Gas)6.5 km41 MW[6]
Archer Daniels Midland Cedar Rapids · Archer Daniels Midland CoPower plant (Coal)25.6 km295 MW[6]
Prairie Creek · Interstate Power and Light CoPower plant (Natural Gas)27 km156 MW[6]
Amana Society Service Company · Amana Society Service CoPower plant (Petroleum)27.2 km22 MW[6]
Pleasant Creek Unit 2 · Interstate Power and Light CoPower plant (Solar)47.4 km150 MW[6]
Pleasant Creek Unit 1 · Interstate Power and Light CoPower plant (Solar)47.4 km50 MW[6]
Diamond Trail Wind Farm · MidAmerican Energy CoPower plant (Wind)48 km250 MW[6]
Coralville North Substation (Linn County REC)Substation0.25 km—[1]
Coralville North Substation (Linn County REC)Substation0.25 km—[1]
Oakdale 69k SubstationSubstation0.96 km—[1]
Oakdale Powerplant Substation · The University of IowaSubstation1.39 km—[1]
Unnamed substationSubstation2.21 km—[1]
Unnamed substationSubstation2.5 km—[1]
Largest queued generation in this countyFuelQueue statusMWSource
J3107 at Enron SubstationMISO J3107SolarIn study · proposed 2025-08150 MW[4]
J953 at AMIL.IOW_AFRYTMISO J953OtherIA signed · proposed 2006-012 MW[4]
J954 at AMIL.IOW_AFRYTMISO J954SolarIA signed · proposed 2016-101 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
2,700 sq ft[1]Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

12
FieldValueSourceConfidenceAs ofStatus
NameForceAmp.comway/837139011 name=ForceAmp.com[1] Likely2026-09-27Shown
StatusOperating[1] derivedUnverified2026-09-27Shown
UtilityMidAmerican Energyterritory 12341: MIDAMERICAN ENERGY CO (INVESTOR OWNED, BERKSHIRE HATHAWAY ENERG[2] derivedUnverified2022Shown
ISO / RTOMISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC..[3] derivedLikely—Shown
Balancing authorityMISO[2] derivedLikely—Shown
Nearest mapped substationCoralville North Substation (Linn County REC)way/800881911[1] derivedLikely2026-09-28Shown
Distance to substation0.3 km[1] derivedLikely2026-09-28Shown
Generation queued in county153 MW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price9.99¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price13.27¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km1.12 GW[6] derivedConfirmed202502Shown
Building footprint2,700 sq ft[1] derivedLikely2026-09-27Shown